ML20137V045

From kanterella
Jump to navigation Jump to search
Forwards Insp Plan Re PPR Completed on 970312.Review Provides Regional Mgt W/Current Summary of Licensee Performance & Serve as Inputs to NRC SALP & SMM Review
ML20137V045
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/07/1997
From: Belisle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 9704170192
Download: ML20137V045 (5)


Text

-. .. - . - - . .- -. . . - ..

April 7, 1997 l i

South Carolina Electric & Gas Company ATTN: Mr. Gary J. Taylor '

Vice President, Nuclear Operations '

Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 ,

i

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - SUMMER NUCLEAR STATION i

Dear Mr. Taylor:

On March 12, 1997, the regional staff completed the semiannual Plant Performance Review (PPR) of the Virgil C. Summer Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an  :

integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Summer involved the participation of all regional technical divisions and NRR in evaluating inspection results and safety performance information for the period from October 1996 through February 1997. PPRs provide regional management with a current summary of licensee wrformance and serve as inputs to the NRC Systematic Assessment of Licensee

)erformance and senior management meeting reviews.

This letter advises you of our planned inspection effort resulting from the ,

Summer PPR review. It is provided in an attempt to minimize the resource i impact on your staff and to allow for scheduling conflicts to be resolved in  !

advance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are included for near term inspections.

Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis i for each inspection outside the core inspection program is provided so that i you are aware of the reasons for em3hasis in these program areas. Resident l inspections are not listed due to t1eir ongoing and continuous nature, nor are Region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.  :

During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Final Safety Analysis Report (FSAR) commitments. Applicable portion (s) of the FSAR that relate to the inspection activities will be reviewed and verification made that the FSAR commitments have been properly implemented into plant practices, procedures and/or parameters.

\

9704170192 970407 i PDR ADOCK 05000395 0 PDR IEl.HRRpp.RN,N,E$

R0l i

.. . . . , ~ . - . . . . . - . - . _ . . . - - - . . . ~ . .- - .

VEPC0 2 ,

s We will inform you of any changes to the inspection plan. If you have any  !

questions, please contact G. Belisle at (404) 331 4196. l Sincerely, 1

Original signed by George A. Belisle j George A. Belisle. Chief  !

Reactor Projects Branch 5 i Division of Reactor Projects  !

Docket No. 50-395 i License No. NPF 12  ;

Enclosure:

Inspection Plan l

cc w/ encl: $

R. J. White l Nuclear Coordinator (Mail Code 802)

S.C. Public Service Authority i c/o Virgil C. Summer Nuclear Station l P. O. Box 88 1 Jenkinsville SC 29065 i i

J. B. Knotts, Jr., Esq. i Winston and Strawn .

1400 L Street, NW l Washington D. C. 20005 3502 j Chairman l Fairfield County Council l P. O. Drawer 60

' Winnsboro, SC 29180 Virgil R. Autry, Director Radioactive Waste Management Bureau of Solid and Hazardous  !

Waste Management S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 R. M. Fowlkes, Manager Operations (Mail Code 303)

South Carolina Electric & Gas Company l

Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065 cc w/ enc 1 continued: See page 3 l I

I l ,

l . _ ..

i 5

VEPC0 3 i cc w/ encl: Continued April Rice, Manager -

l Nuclear Licensing & Operating Ex wrience (Mail Code 830)

Sout1 Carolina Electric & Gas Company l l Virgil C. Summer Nuclear Station l

l P. O. Box 88

! Jenkinsville, SC 29065  !

l Distribution w/ encl: '

L. Garner, RII A. Johnson, NRR R. Gibbs, RII P. Fillion, RII l D. Jones, RII W. Stansberry, RII C. Payne, RII  !

PUBLIC l

NRC Resident Inspector l 1 U.S. Nuclear Regulatory Commission  !

l Route 1 Box 64  !

! Jenkinsville, SC 29065  !

I l

l l

\

l l

DFFICF Rff:DRS s Ril:DRS Rif M S Rif:DRS RII:MS m SIGNATURE

)

i NAMt W and alt Hrnristensen fr PF e ickson Tweebles hggM,,9

/ 8 I/ 97 DATE 03_ / [ / 97 03 / / 97 03 /3 ) / 97 03/)//97 03 /1. ) / 97 COPY 7 [ES) NO [YE'S ) N0 f) N0 GEp NO YES Al 703 NO j OfflCIAL RECORD COPY W UMENT NAM . Ta: \5UMLTR97.Ph

(/ i b

i

SUMMER INSPECTION PLAN -

INSPECTION PROCEDURE / TITLE / PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY I INSPECTORS DATES IP 71001 LICENSED OPERATOR 1 4/28/97-5/2/97 CORE REQUALIFICATION PROGRAM EVALUATION IP 86750 SOLID RADIOACTIVE 1 4/28/97-5/2/97 CORE WASTE MANAGEMENT &

TRANSPORTATION OF RADI0 ACTIVE MATERIALS TI 2515/133 IMPLEMENTATION OF SAFETY ISSUE REVISED 49 CFR PARTS 100-179 & 10 CFR PART 71 IP 62706 MAINTENANCE RULE 5 5/12-16/97 REGIONAL INSPECTION INITIATIVE (TEAM)

PROCEDURE IP 81700 PHYSICAL SECURITY 1 5/27-30/97 CORE PROGRAM FOR POWER REACTORS TI 2515/132 MALEVOLENT USE OF 2 7/7-11/97 SAFETY ISSUE VEHICLES AT NUCLEAR POWER PLANTS TI 2515/127 ACCESS AUTHORIZATION IP 62700 MAINTENANCE 1 7/14-18/97 REGIONAL PROGRAM INITIATIVE - ON-IMPLEMENTATION LINE MAINT, ITEM CLOSE00TS 1 ENCLOSURE

SUMMER ".

INSPECTION PLAN INSPECTION PROCEDURE / TITLE / PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY INSTRUCTION INSPECTORS DATES IP 82301 EVALUATION OF 3 7/14-18/97 CORE EXERCISES FOR POWER REACTORS IP 82302 REVIEW 0F EXERCISE OBJECTIVES AND SCENARIOS FOR POWER REACTORS IP 37550 ENGINEERING 2 7/28/97-8/1/97 CORE IP 37550 ENGINEERING 1 10/6-10/97 CORE IP 73753 INSERVICE 1 10/14-17/97 CORE INSPECTION IP 83750 OCCUPATIONAL 1 10/20-24/97 CORE RADIATION EXPOSURE TI 2515/133 IMPLEMENTATION OF SAFETY ISSUE REVISED 49 CFR PARTS 100-179 & 10 CFR PART 71 2 ENCLOSURE