Forwards Insp Plan Re PPR of Plant.Review Provides Regional Mgt W/Current Summary of Licensee Performance & Serve as Inputs to NRC SALP & SMM Reviews
ML18153A515
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/07/1997
From: Belisle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 9704170209
Download: ML18153A515 (5)


Text

..

April 7, 1997 Virginia Electric and Power Company ATTN:

Mr. J. P. O'Hanlon Senior Vice President - Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - SURRY NUCLEAR STATION

Dear Mr. O'Hanlon:

On March 12, 1997, the regional staff completed the $emiannual Plant Performance Review (PPR) of the Surry Power Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Surry involved the participation of all regional technical divisions and NRR in evaluating inspection results and safety performance information for the period from October 1996 through February 1997.

PPRs provide regional management with a current summary of licensee performance and serve as inputs to the.NRC Systematic Assessment of Licensee Performance and senior management meeting reviews.

This letter advises you of our planned inspection effort resulting from the Surry PPR review. It is provided in an attempt to minimize the resource impact on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are included for near-term inspections.

Long-term inspection dates will.be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis.in these program areas. Resident inspections are not listed due to their ongoing and continuous nature, nor are Region based inspections.which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.

During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Report (UFSAR) commitments. Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed *and verification made that the UFSAR commitments have been properly implemented into plant practices. procedures and/or parameters.

9704170209 970407 PDR ADOCK 05000280 G

PDR 11\\1111,m IJll l~I~ \\Im \\II~ [IIE ~In Jl\\11 ~111\\11

~'

VEPCO 2

We will inform you of any changes to the inspection plan. If you have any questions. please contact G. Belisle at (404) 331-4196.

Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37

Enclosure:

Inspection Plan cc w/encl:

M. L. Bowling, Manager Nuclear Licensing & Operations Support Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen. VA 23060 David A. Christian, Manager Surry Power Station Virginia Electric & Power Company 5570 Hog Island Road Surry, VA 23883 W.R. Matthews, Manager North Anna Power Station P. 0. Box 402 Mineral, VA 23117 Ray D. Peace. Chairman Surry County Board of Supervisors P. 0. Box 130 Dendron. VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond. VA 23209 cc w/encl continued:

See page 3 Sincerely, Original signed by George A. Belisle George A. Belisle. Chief Reactor Projects Branch 5 Division of Reactor Projects

VEPCO cc w/encl: Continued Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.

State Heal th Comm_i ss i oner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl:

L. Garner, RII G. Edison, NRR R. Gibbs, RII P. Fillion, RII D. Jones, RII W. Stansberry, RII C. Payne, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, VA 23117 FF

  • DR SIGNATURE Iv c! ff NAHE DATE 3

'Ki J)

I / 97 YES ND

INSPECTION PROCEDURE/

TITLE/PROGRAM AREA TEMPORARY INSTRUCTION IP 81700 PHYSICAL SECURITY PROGRAM FOR POWER REACTORS IP 60853 ON-SITE FABRICATION OF COMPONENTS AND CONSTRUCTION OF AN ISFSI IP 37550 ENGINEERING NONE INITIAL OPERATOR LICENSING EXAMINATIONS

.IP 62700 MAINTENANCE PROGRAM IMPLEMENTATION IP 82301 EVALUATION OF EXERCISES FOR POWER REACTORS IP 82302 REVIEW OF EXERCISE OBJECTIVES AND SCENARIOS FOR POWER REACTORS SURRY INSPECTION PLAN NUMBER OF PLANNED INSPECTION INSPECTORS DATES 1

5/12-16/97 1

5/27-30/97 2

6/23-27/97 2

7 /7-11/97 3

7/21-25/97 (PREP) 3 8/4-8/97. (EXAMS) 1 7/28/97-8/1/97 5

8/25-29/97 1

TYPE OF INSPECTION CORE REGIONAL INITIATIVE -

REVIEW CONSTRUCTION DOCUMENTATION FOR SECOND PAD.

CORE N/A REGIONAL INITIATIVE -

CORRECTIVE ACTIONS FOR EQUIPMENT*

PROBLEMS CORE ENCLOSURE

INSPECTION PROCEDURE/

TITLE/PROGRAM AREA TEMPORARY INSTRUCTION IP 62700 MAINTENANCE PROGRAM IMPLEMENTATION IP 62706 MAINTENANCE RULE INSPECTION PROCEDURE TI 2515/132 MALEVOLENT USE OF VEHICLES AT NUCLEAR POWER PLANTS IP 71001 LICENSED OPERATOR RE QUALi FI CA TI ON PROGRAM EVALUATION SURRY INSPECTION PLAN NUMBER OF PLANNED INSPECTION INSPECTORS DATES 1

9/8-12/97 1

9/25-26/97 1

10/14-17 /97 2

TYPE OF INSPECTION REGIONAL INITIATIVE - AUX SD MAINT, BACKLOG, ON-LINE MAINTENANCE, MRULE CORRECTIVE ACTIONS SAFETY ISSUE CORE ENCLOSURE.