ML14178B036

From kanterella
Jump to navigation Jump to search
Forwards Insp Plan Re Ppr,Completed 970313.Insp Plans Covers Period Oct 1996 to Mar 1997
ML14178B036
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/04/1997
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hinnant C
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9704180079
Download: ML14178B036 (4)


Text

April 4, 1997 Carolina Power & Light Company ATTN: Mr. C. S. Hinnant Vice President H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - ROBINSON

Dear Mr. Hinnant:

On March 13, 1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Robinson Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Robinson involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 to March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting(SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Robinson PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments. Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly, implemented into plant practices, procedures and/or parameters. The goal is to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections. Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant.

0~

(1 9704180079 970404 S

PDR ADOCK 05000261 G

PDR

CP&L 2

We will inform you of any changes to the inspection plan. If you have any questions, please contact me at 404-331-5535.

Sincerely, (Original signed by Milton B. Shymlock)

Milton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-261 License No. DPR-23

Enclosure:

Inspection Plan cc w/encl:

Dale E. Young Plant Manager H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 J. Cowan, Manager Operations & Environmental Support MS 0HS7 Carolina Power & Light Company P. 0. Box 1551 Raleigh, NC 27602 H. K. Chernoff, Supervisor Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant 3581 West Entrance Road Hartsville, SC 29550 Max Batavia, Chief Bureau of Radiological Health Dept. of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 (cc w/encl cont'd - See page 3)

CP&L 3

(cc w/encl cont'd)

W. D. Johnson, Vice President and Senior Counsel Carolina Power & Light Co.

P. 0. Box 1551 Raleigh, NC 27602 Karen E. Long Assistant Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. 0. Box 29520 Raleigh, NC 27626-0520 Public Service Commission State of South Carolina P. 0. Box 11649 Columbia, SC 29211 Hartsville Memorial Library 147 W. College Avenue Hartsville, SC 29550 Distribution w/encl:

M. Shymlock, RII F. Jape, RII B. Mozafari, NRR K. Barr, RII H. Christensen. RII P. Fredrickson, RI W. Holland, RII T. Peebles, RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 2112 West Old Camden Road Hartsville, SC 29551 OFFICE RUDRP RIRII:DR RHI:DRS

/

R R SRI SIGNATURE pZ'l NAME FJape r

O ristensen Pr on WHolland TPe lbs DATE 04 / 2/

97 04/

/7 90

/

04 //97 04 /7

/97 L04//

9j7 COPY?

(E)

NO YES NO ES NO YES NO YES2 NO YES N

CP&L ROBINSON INSPECTION PLAN FOR: 4/97 - 9/97 IP - Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

Robinson SALP Period ends September 19, 1998 INSPECTION TITLE/

NUMBER OF PLANNED TYPE OF INSPECTION PROGRAM AREA INSPECTORS INSPECTION COMMENTS DATES IP 93801 Architect/Engineer 7

4/21-5/2/97 Headquarters Initiative and Inspection 5/12-23/97 IP 37500 Engineering 1

5/19-23/97 Core Inspection - A/E Engineering Followup IP 84750/

Radiation Protection 1

6/2-6/97 Core Inspection 86750/

TI-133 IP 62700 Maintenance 1

6/16-20/97 Regional Initiative Inspection to review increased Online Maintenance IP 64704 Fire Protection Program 1

7/28-8/1/97 Core Inspection TI 2515/109 MOVs 2

9/15-19/97 Safety Issue Closeout Inspection for GL 89-10 file g:\\robinson\\smm\\robinsp.mat 1~TWr r)Q I D P