Text
April 4, 1997 Carolina Power 8 Light Company ATIN:
Mr. W. R. Robinson Vice President Har ris Plant Shearon Harris Nuclear Power Plant P. 0. Box 165, Mail Code:
Zone 1
New Hill, NC 27562-0165
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)
- HARRIS
Dear Mr. Robinson:
On March 13, 1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Harris Nuclear Plant.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of ihspection resources.
The PPR for Harris involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 to March 1997.
PPRs provide NRC management with a current summary of licensee performance.and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Harris PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arr ival onsite.
The enclosure details our inspection plan for the next 6 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
During each NRC inspection planned during this period, specific attention will be given to the verification of'elected UFSAR commitments.
Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.
The goal is to determine the accuracy of'he UFSAR regar ding existing plant pt actices and conditions by providing specific attention to the UFSAR when performing various reactor inspections.
Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant.
9704f80073 9'70404 PDR ADOCK 05000400 PDR
!pIj)!!!!!!Il]ll'!IIIIII!!!!!!!!!!!!!!
CP&L We will inform you of any changes to the inspection plan. If you have any questions, please contact me at 404-331-5535.
Sincerely, (Original signed by Milton B. Shymlock)
Docket No. 50-400 License No. NPF-63
Enclosure:
Inspection Plan cc w/encl:
J.
- Cowan, Hanager Operations
& Environmental Support HS OHS7 Carolina Power
& Light Company P. 0. Box 1551
- Raleigh, NC 27602 J.
W. Donahue Director of Site Operations Carolina Power
& Light Company Shearon Harris Nuclear Power Plant P. 0. Box 165, HC:
Zone 1
New Hill, NC 27562-0165 Bo Clark Plant General Hanager
- Harris Plant Carolina Power
& Light Company Shearon Harris Nuclear Power Plant P. 0. Box 165 New Hill, NC 27562-0165 T. D. Walt, Hanager Regulatory Affairs Carolina Power
& Light Company Shearon Harris Nuclear Power Plant P. 0. Box 165, Hail Zone 1
New Hill, NC 27562-0165 (cc w/encl cont'd
- See page 3)
Hilton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects
CPSL (cc w/encl cont'd)
W. D. Johnson, Vice President and Senior Counsel Carolina Power
& Light Company P. 0. Box 1551
- Raleigh, NC 27602 Dayne H. Brown. Director Division of Radiation Protection N. C. Department of Environmental Health 5 Natural Resources P. 0. Box 27687
- Raleigh, NC 27611-7687 Karen E.
Long Assistant Attorney General State of North Carolina P. 0. Box 629
- Raleigh, NC 27602 Public Service Commission State of South Carolina P. 0. Box 11649
- Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. 0. Box 29510
- Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC P. 0.
Box 29520
- Raleigh, NC 27626 Margaret Bryant Pollard, Chairman Board of County Commissioners of Chatham County P. 0. Box 87 Pittsboro, NC 27312
CP8aL Distribution w/encl:
H. Shymlock, RII G. HacDonald, RII K. Barr, RII H. Christensen, RII P. Fredrickson, RII W. Holland, RII T. Peebles, RII N. Le, NRR PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998 SIGHAIIRE GHacOonal 4
~hristensen PFredr kson g
HHo land TP es COPYY 0 / Q / 97 04 /
/ 97 S
HO HO
/ 97 YE H3 04 /
/ 97 04 / 4 / 97 04 /
/
YES HO ES HO YES 0
CPSL HARRIS INSPECTION PLAN FOR: 4/97 - 9/97 IP
- Inspection Procedure TI - Temporary Instruction Core Ins ection
- Hinimum NRC Ins ection Program (mandatory all lants)
INSPECTION IP 83750 IP 62700 IP 37550 IP 73753 IP 64704 IP 81700 IP 86700 TITLE/
PROGRAH AREA Radiation Protection-Haintenance and Testing Engineering In Service Inspection Fire Protection Program Security Program Heavy Loads/Spent Fuel Handling NUHBER OF INSPECTORS PLANNED INSPECTION DATES 4/14-18/97 4/14-18/97 4/14-18/97 4/21-25/97 5/5-9/97 5/19-23/97 TBD TYPE*OF INSPECTION-COHHENTS Core Inspection-Occupational Radiation Ex osure (outage)
Regional initiative inspection to witness GL 96-01 related outage surveillance and maintenance Core Inspection-Hodi fication Im lementation Review(outage)
Core Inspection-ISI Observation of Work(outage)
Core Ins ection(outage)
Core Ins ection Regional initiative inspection to witness spent fuel cask loading and shipping TBD - To Be Determined file: g:Kharrishsmmhharinsp.mat EÃCIDSURE
CPSL IP 82701 IP 84750/
IP 86750 IP 37550 IP 84750/
IP 86750 IP 62706 IP 83750 Emergency Preparedness Program Radwaste Treatment, Effluent, Environmental Monitoring Engineering Radwaste Treatment, Effluent, Environmental Monitoring Maintenance Rule Ins ection Radiation Protection 6/23-27/97 6/23-27/97 6/23-27/97 7/7-11/97 7/21-25/97 9/8-12/97
.Core Inspection Core Inspection Core inspection to review Corrective Actions /DBD Core Inspection Safety Initiative Inspection Core Ins ection file: g:XharrisXsmmXharinsp.mat