Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128B888 + (Forwards Initial Preoperational Security Program Review Insp Rept 50-423/85-09 on 850211-15)
- ML19210B636 + (Forwards Initial QA Insp Repts 50-289/69-06 & 50-320/69-02 on 691103,1201-05 & 08-09)
- IR 05000528/1974002 + (Forwards Initial QA Insp Repts 50-528/74-02,50-529/74-02, & 50-530/74-02 on 741104-05.No Violations Identified)
- ML19262A686 + (Forwards Initial Questions Re FSAR in Response to 791115 Discussion.Requests NRC Assistance in Obtaining Answers to All Questions)
- ML19257B293 + (Forwards Initial Questions Re Facility Fsar.Questions Cover Sections 15.0-15.6,4.6,3.13 & 3.2.Requests Assistance in Obtaining Answers from Applicant)
- ML20214T769 + (Forwards Initial Repts Addressing Employee Concerns in Engineering Category,Final Rept for 21 Elements Addressing Employee Concerns in Engineering,Operations,Const & S&W Items & Writers Guide,For Review)
- ML20213F507 + (Forwards Initial Repts Addressing Employees Concerns in Engineering & Welding Categories & Final Rept for 8 Elements Addressing Employee Concerns in Listed Categories,For Review.Listing of Rept Numbers Also Encl)
- L-79-113, Forwards Initial Response Re Emergency Power Sys Periodic Tests Requested in NRC + (Forwards Initial Response Re Emergency Power Sys Periodic Tests Requested in NRC)
- ML17338A699 + (Forwards Initial Response Re Emergency Power Sys Periodic Tests Requested in NRC 790309 Ltr)
- ML19331C214 + (Forwards Initial Response to 800708 Interrogatories.Advises of Intent to Pursue Contention IIE-3.Related Correspondence)
- ML20210F572 + (Forwards Initial Response to 860718 Regulatory Effectiveness Review.Some Responses Preliminary.Seven Items Should Be Closed W/Encl Response.Encl Withheld (Ref 10CFR73.21))
- ML13322B026 + (Forwards Initial Response to CM Trammell Re full-term OL Open Items,Including Inadequate Core Cooling Instrumentation Sys,Thermal Shield Repair & Revised Cycle XI Refueling Dates)
- TXX-2946, Forwards Initial Response to Effluent Treatment Sys Branch Question (Q320.8) Re Solidification Process Control Program.Response Will Be Transmitted to NRC in FSAR Amend 4 + (Forwards Initial Response to Effluent Treatment Sys Branch Question (Q320.8) Re Solidification Process Control Program.Response Will Be Transmitted to NRC in FSAR Amend 4)
- TXX-3004, Forwards Initial Response to IE Bulletin 79-02,Revision 1. Supplemental Response Will Be Submitted within 60 Days or Will Advise of Progress + (Forwards Initial Response to IE Bulletin 79-02,Revision 1. Supplemental Response Will Be Submitted within 60 Days or Will Advise of Progress)
- ML19254B073 + (Forwards Initial Response to IE Bulletin 79-14 Re Seismic Analysis of safety-related Piping Sys)
- L-82-240, Forwards Initial Response to NRC 820428 & 0503 Requests for Addl Info Re Control Room Habitability Requirements of NUREG-0737,Item III.D.3.4.Response to Questions 1 & 2 Will Be Submitted by 820716 + (Forwards Initial Response to NRC 820428 & 0503 Requests for Addl Info Re Control Room Habitability Requirements of NUREG-0737,Item III.D.3.4.Response to Questions 1 & 2 Will Be Submitted by 820716)
- ML20244C720 + (Forwards Initial Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Stored Spare Circuit Breakers Available for safety-related Applications Physically Inspected & Traceability to Mfg Verified)
- RBG-27292, Forwards Initial Response to NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Tech Specs. Final Response to Bulletin Will Be Submitted by 880129 + (Forwards Initial Response to NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Tech Specs. Final Response to Bulletin Will Be Submitted by 880129)
- L-98-277, Forwards Initial Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (Forwards Initial Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment)
- ML20091F529 + (Forwards Initial Response to R Landsman Concerns Re Integrity of Diesel Generator Bldg,Prepared During 830728 Working Meeting)
- RBG-21042, Forwards Initial Response to a Schwencer 850430 Request for Addl Info 210.110.Info Re Original Calculation for Performance of Feedwater Check Valves Encl.Confirmatory Analysis Will Be Submitted Prior to Exceeding 5% Full Power + (Forwards Initial Response to a Schwencer 850430 Request for Addl Info 210.110.Info Re Original Calculation for Performance of Feedwater Check Valves Encl.Confirmatory Analysis Will Be Submitted Prior to Exceeding 5% Full Power)
- TXX-2948, Forwards Initial Responses to Auxiliary Systems Branch Questions (Q005.1-Q005.3,Q010.2,Q010.4-Q010.19) Re Component Code & Seismic Classification.Responses Will Be Retransmitted to NRC in FSAR Amend 4 + (Forwards Initial Responses to Auxiliary Systems Branch Questions (Q005.1-Q005.3,Q010.2,Q010.4-Q010.19) Re Component Code & Seismic Classification.Responses Will Be Retransmitted to NRC in FSAR Amend 4)
- TXX-2947, Forwards Initial Responses to Core Performance Branch Questions (Q231.1-Q231.11,Q232.1-Q232.) Re Fuel Performance Code.Responses Will Be Retransmitted to NRC in FSAR Amend 4 + (Forwards Initial Responses to Core Performance Branch Questions (Q231.1-Q231.11,Q232.1-Q232.) Re Fuel Performance Code.Responses Will Be Retransmitted to NRC in FSAR Amend 4)
- TXX-2949, Forwards Initial Responses to Emergency Planning Branch Questions (Q432.1-Q432.25) Re Emergency Action Levels for Radiological Emergency Condition.Responses Will Be Retransmitted to NRC in FSAR Amend 4 + (Forwards Initial Responses to Emergency Planning Branch Questions (Q432.1-Q432.25) Re Emergency Action Levels for Radiological Emergency Condition.Responses Will Be Retransmitted to NRC in FSAR Amend 4)
- TXX-3230, Forwards Initial Responses to Instrumentation & Control Sys Branch Second Round questions,Q032.75-Q032.1102.Responses Will Be Retransmitted in Amend 13 to FSAR + (Forwards Initial Responses to Instrumentation & Control Sys Branch Second Round questions,Q032.75-Q032.1102.Responses Will Be Retransmitted in Amend 13 to FSAR)
- TXX-3295, Forwards Initial Responses to NRC Questions on Seismic & Dynamic Loads + (Forwards Initial Responses to NRC Questions on Seismic & Dynamic Loads)
- TXX-2941, Forwards Initial Responses to NRC Round 1 Questions on Hydrology.Responses Be Retransmitted in FSAR Amend 4.Seven Oversized Drawings Encl.Info Requested Concerns Svc Spillway Capabilities + (Forwards Initial Responses to NRC Round 1 Questions on Hydrology.Responses Be Retransmitted in FSAR Amend 4.Seven Oversized Drawings Encl.Info Requested Concerns Svc Spillway Capabilities)
- TXX-2945, Forwards Initial Responses to Quality Assurance Branch Questions (Q421.1-Q421.42) Re QA Program.Responses Will Be Retransmitted to the NRC in FSAR in Amend 4 + (Forwards Initial Responses to Quality Assurance Branch Questions (Q421.1-Q421.42) Re QA Program.Responses Will Be Retransmitted to the NRC in FSAR in Amend 4)
- TXX-2925, Forwards Initial Responses to Round One Questions on meteorology(Q372.21-Q372.30).Responses Will Be Retransmitted to Comm in Next FSAR Amend + (Forwards Initial Responses to Round One Questions on meteorology(Q372.21-Q372.30).Responses Will Be Retransmitted to Comm in Next FSAR Amend)
- TXX-2944, Forwards Initial Responses to Seismology-Geology Branch Questions (Q361.16-Q361.24,Q362.10-Q362.22) Re Info Concerning Status of Wells Near Site.Responses Will Be Retransmitted to NRC in FSAR Amend 4 + (Forwards Initial Responses to Seismology-Geology Branch Questions (Q361.16-Q361.24,Q362.10-Q362.22) Re Info Concerning Status of Wells Near Site.Responses Will Be Retransmitted to NRC in FSAR Amend 4)
- ML20035C724 + (Forwards Initial Retake & Requalification Exam & Requalification Program Evaluation Repts 50-277/93-04 & 50-278/93-04 on 930225-0312)
- ML20126E931 + (Forwards Initial Retake & Requalification Exam Rept 50-346/OL-92-02 on 921118 & Wk of 921130.Requalification Program Received Overall Program Rating of Satisfactory)
- ML18153D172 + (Forwards Initial Retake Exam Rept 50-280/92-302 for Both Units During Wk of 920928)
- ML20044H290 + (Forwards Initial Retake Exam Rept 50-333/93-11OL Administered on 930511-12)
- ML19330C096 + (Forwards Initial Review & Recommendations for Site Specific Spectra at SEP Sites)
- NUREG-1065, Forwards Initial Review Comments on Aug 1985 Fundamental Matl Control (Fnmc) Plan,Partially Discussed in 851113 Meeting.Rev & Resubmittal,W/Greater Level of Detail,Needed Per NUREG-1065 + (Forwards Initial Review Comments on Aug 1985 Fundamental Matl Control (Fnmc) Plan,Partially Discussed in 851113 Meeting.Rev & Resubmittal,W/Greater Level of Detail,Needed Per NUREG-1065)
- ML20198F427 + (Forwards Initial Review Questions Re Environ Rept Sections Concerning Meteorology,Per 770119 Discussion W/J Goll)
- ML20058C481 + (Forwards Initial Review of Anf Financial Assurance,Submitted on 900719.W/o Encl)
- ML20042A024 + (Forwards Initial Review of Util steady-state Fuel Performance Code (Frosstey).Recommends Frosstey Be Subj to Further Evaluation)
- ML18057A784 + (Forwards Initial SALP 10 Rept 50-255/91-01 for Sept 1989 - Dec 1990)
- ML20044H237 + (Forwards Initial SALP 10 Rept for Plant,Covering Period 920201-930331 & Lists Specific Highlights of Rept)
- ML20035B980 + (Forwards Initial SALP 10 Rept for Plant,Covering Period 910501-930131)
- ML17329A413 + (Forwards Initial SALP 10 Rept for Review Prior to 910326 Meeting.Rept Covers Period 900901-911231.Highlights Listed)
- ML17174A915 + (Forwards Initial SALP 10 Repts 50-237/91-01 & 50-249/91-01 for May-Jul 1991)
- ML20035G656 + (Forwards Initial SALP 11 Rept (W/O Rept Cover) for Aug 1990 Through Oct 1991,for Review Prior to Scheduled 920123 Meeting)
- ML20133G873 + (Forwards Initial SALP 11 Repts 50-237/92-01 & 50-249/92-01 for Period 910801-920731)
- ML20133G876 + (Forwards Initial SALP 11 Repts 50-237/92-01 & 50-249/92-01 for Period 910801-920731)
- ML17331A896 + (Forwards Initial SALP 11 Repts 50-315/93-01 & 50-316/93-01 During Jan 1992 - Apr 1993.Superior Level of Performance Sustained in Areas of Security & Emergency Preparedness)
- ML20056D552 + (Forwards Initial SALP 11 Repts 50-454/93-01 & 50-455/93-01 for Period 910901 - 930228)
- ML20024G907 + (Forwards Initial SALP 12 Rept for Jan 1990 - Feb 1991.Areas Remain,As Listed,Where Performance Declined & Util Attention Needed.Meeting Scheduled for 910514 to Discuss Rept)
- ML20035C139 + (Forwards Initial SALP 12 Rept for Plant Covering Period 911101-930131,for Review,Before 930408 Scheduled Meeting. Requests Any Written Comments within 30 Days After Meeting)