Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Followup AO 50-313/75-1A". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19344D857  + (Forwards Fm Maultz Expressing Concern Re Release of Radioactive Matls from Facility.White House 790823 Memo to DOE Encl)
  • ML19309B546  + (Forwards Fm Staszesky to President Carter Discussing Moratorium on Issuance of CPs & Ols.White House 791227 Transmittal Encl)
  • ML20029D410  + (Forwards Fmcrd Scram Times for Nominal Charge Pressure of 2134 Psig & for Minimum Allowable Charge Pressure of 1850 Psig)
  • ML19327A854  + (Forwards Fnmc Page Changes or Additions.W/O Encl)
  • ML20055E628  + (Forwards Fnmc Plan Changes.Encl Withheld (Ref 10CFR2.790(d)))
  • ML20010B599  + (Forwards Fog & Rime Ice Monitoring Program Summaries for First & Second Quarters 1981)
  • ML20010B600  + (Forwards Fog & Rime Ice Monitoring Program Summaries for First & Second Quarters 1981)
  • ML19354C445  + (Forwards Fog & Rime Ice Monitoring Program Summary,1980. Data Collected During Operational Phase Will Be Analyzed, Interpreted & Compared w/810123 Draft ETS)
  • ML19350A917  + (Forwards Fog & Rime Ice Monitoring Program Summary,1980. Data Collected During Operational Phase Will Be Analyzed, Interpreted & Compared w/810123 Draft ETS)
  • ML20038B669  + (Forwards Fog & Rime Ice Monitoring Program Summary,Third Quarter,1981)
  • ML20040G334  + (Forwards Fog & Rime Ice Monitoring Program summary,1981)
  • ML20217M723  + (Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits)
  • ML20197E527  + (Forwards Folder W/Copies of Info Describing Santa Barbara Method,Per Concerns Expressed by R Gonzales & 2 Page Summary of Preliminary Reappraisal of PMF for Swale on East Side of Embankment Encl)
  • ML20024G748  + (Forwards Foldout Drawing Identified for Later Delivery in 910222 Submittal of Amend 16 to GE Advanced BWR SSAR)
  • ML20118B201  + (Forwards Foldout Drawings of Selected Sections of Chapters 8,9,12,15 & 18 of Amend 22 to ABWR SSAR)
  • ML19340D372  + (Forwards Follow Up & Preliminary Repts on Plant Emergency Procedures)
  • ML20149F741  + (Forwards Follow Up June 23 Correspondence Concerning Suggestions Made by Ny Governor Coumo That LLRW Be Stored on Grounds of State Owned & Operated Plant in Oswego,Ny)
  • ML20216J974  + (Forwards Follow Up to 900530 Presentation on Rmov Boards 2D & 2E & Mod of Response to NUREG-0737,Item II.B.2, Plant Shielding)
  • ML20154C212  + (Forwards Follow Up to Insp Rept 50-271/98-06, Re Review of Emergency Operating Procedures at Vermont Yankee with Respect to Containment Flooding)
  • RC-96-0216, Forwards Follow Up to RAI Re GL 92-08 Per 10CFR50.54(f) 931222.Detail Description of Two Separate Exemption Requests to Requirements of Section III.G.2 of App R to 10CFR50 Encl  + (Forwards Follow Up to RAI Re GL 92-08 Per 10CFR50.54(f) 931222.Detail Description of Two Separate Exemption Requests to Requirements of Section III.G.2 of App R to 10CFR50 Encl)
  • L-78-249, Forwards Follow-up Report Containing More Detailed Information on Results of First Steam Generator Inservice Inspection  + (Forwards Follow-up Report Containing More Detailed Information on Results of First Steam Generator Inservice Inspection)
  • ML20217H231  + (Forwards Following Items Requested.W/O Encl)
  • ML19309G240  + (Forwards Followon Interview W/J Flint,Conducted by Util on 790420)
  • ML20137U071  + (Forwards Followon Questions Re AP600 ITAAC)
  • ML20141K278  + (Forwards Followon Questions Re AP600 Inspections,Test, Analyses & Acceptance Criteria.Specifically,Re AP600 ITAAC Resulting from Review Done by Containment Sys & Severe Accident Branch)
  • ML20141A313  + (Forwards Followon Questions Re Westinghouse AP600 Initial Test Program.Portions of Application Requested to Be Withheld from Public Disclosure Does Not Contain Info for Which Exempt Sought)
  • ML20035E078  + (Forwards Followup Action Consistent W/Actions,Agreements, Requests & Commitments Made During ACRS 394th Meeting on 930211-13)
  • L-89-267, Forwards Followup Actions & Dates for Completion of Actions for Changing Status of Certain Equipment from Vital to Nonvital.Actions Scheduled to Be Completed by 900201.Encl Withheld (Ref 10CFR2.790(a)(3))  + (Forwards Followup Actions & Dates for Completion of Actions for Changing Status of Certain Equipment from Vital to Nonvital.Actions Scheduled to Be Completed by 900201.Encl Withheld (Ref 10CFR2.790(a)(3)))
  • ML17249A215  + (Forwards Followup Actions Resulting from NRC Review of TMI-2 Accident,In Response to 790913 Request)
  • ML20055B869  + (Forwards Followup Documentation from 820329-0402 Structural Engineering Branch Design Audit.Amplification of Input Motion Due to Backfill Over Bedrock Provided)
  • ML20052B314  + (Forwards Followup Documentation from Structural Engineering Branch 820329-0402 Design Audit at United Engineers & Constructors,Inc)
  • ML20053A572  + (Forwards Followup Documentation from Structural Engineering Branch Design Audit on 820329-0402.Response to Action Items Encl)
  • ML20062K654  + (Forwards Followup Documentation from Structural Engineering Branch Design Audit Re Action Item 13.Load Combinations Used in Design Are in Accordance W/Srp)
  • ML20153F341  + (Forwards Followup Event Rept 7264,re Stolen Moisture Density Gauge,Associated Testing Lab,Houston,Tx)
  • ML20153F384  + (Forwards Followup Event Rept 7269,re Loss of 500 Mci Level Gauge Source,La Gloria Oil & Gas,Tyler,Tx)
  • ML20153F332  + (Forwards Followup Event Rept 7281,re Fire Involving Radioactive Matl at Exxon Chemical Co,Baytown,Tx)
  • ML20151U937  + (Forwards Followup Event Rept I-7250 for Radiation Technology,Inc Re 971001-1231,13.34 Rem Exposure While Performing Source Exchange)
  • ML20149F779  + (Forwards Followup Event Rept SC-97-001 on Medical Misadministration at Tuomey Regional Medical Ctr,Sumter, Sc on 961211,involving I-131)
  • ML16340D987  + (Forwards Followup Info Re Evaluation of 31 Open Items Identified in Table C.8.1 & 15 Followup Items in Table C.8.3 of Suppl 19 to SER)
  • ML20073J914  + (Forwards Followup Info Re Heavy Load Handling Sys & Special Lift Devices in Response to NUREG-0612, Control of Heavy Loads. Technical Evaluation Rept Open Items Have Been Satisfactorily Addressed & NRC Can Complete Review)
  • ML20091M281  + (Forwards Followup Info Re NRC Audit of Environ Qualification of Equipment)
  • ML20062K170  + (Forwards Followup Info Re NRC Seismic Qualification Review Team 801014-17 Audit of Equipment Qualification Program. Notification to NRC Will Be Provided Upon Completion of Seismic Rept Review)
  • ML20202G743  + (Forwards Followup Info from Alleger Re Questioning Whether Licensee Had Gotten Back to NRC on Results of Investigation Into Alarms & Potential False Statements)
  • ML20099D821  + (Forwards Followup Info to Insp Rept 50-413/83-51 Open Item 2 Re Quickpipe Computer Program Used in Structural Analysis for Small Bore Piping Sys.Program Benchmarked Against Impell Program Superpipe)
  • ML20108E027  + (Forwards Followup Info to Re Updates on Status of Shift Advisors & Shift Senior Licensed Operators Participating in 6-wk Program.Written & Oral Exams & Results Will Be Forwarded When Available)
  • 1CAN078909, Forwards Followup Info to Util 890414 Submittal & Meeting W/Nrc Re Discovery of Reduced Svc Water Flow & Other Discrepancies Which Could Have Reduced post-LOCA long-term Containment Cooldown  + (Forwards Followup Info to Util 890414 Submittal & Meeting W/Nrc Re Discovery of Reduced Svc Water Flow & Other Discrepancies Which Could Have Reduced post-LOCA long-term Containment Cooldown)
  • ML20150F188  + (Forwards Followup Insp Repts 50-254/88-06 & 50-265/88-07 on 880315-17.No Violations of NRC Requirements Noted)
  • ML20236W800  + (Forwards Followup Insp Repts 50-327/87-40 & 50-328/87-40 on 870713-24.Util Taking Corrective Actions to Ensure That Past & Future Procurement Activities Do Not Adversely Affect safety-related Equipment & Safe Operation of Plant)
  • ML20151R597  + (Forwards Followup Insp Repts 50-327/88-07 & 50-328/88-07 on 880125-29.Violation Noted.Insp Determined That Facility Implemented Program Rept to Correct Procurement Deficiencies Identified in Rept)
  • ML19347A868  + (Forwards Followup LER 80-022/01X-1)