Forwards Followup Insp Repts 50-327/87-40 & 50-328/87-40 on 870713-24.Util Taking Corrective Actions to Ensure That Past & Future Procurement Activities Do Not Adversely Affect safety-related Equipment & Safe Operation of Plant
ML20236W800
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/30/1987
From: Richardson S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20236W802 List:
References
NUDOCS 8712080240
Download: ML20236W800 (6)


See also: IR 05000327/1987040

Text

,7-

. .

w-

-

-

- - - -

-

,

>

'

j' M4'6

M

e

-

,

..

,

,

i

'

1 , ' ' N7K ,

O

'M

i48%<

.

8'

~(

iNUCLEAR REGULATORY COMMISSION"

~Myey,lg4

g -.

! WASHINGTON, D. C. 20685 -

p

, A ....["

A

.

.L.

NOV. 3 01987 -

3

1

.m

'

lDoEketNos.iS0-327;

'

',

.and 50-328i

'

,

p

Tennessee ~ Valley. Authority

' ATTN:

Mr. Steven A. White'

'

_ _ .

Manager of Nuclear-Power

'

6 North 38A Lookout Place"

Jm

<11.01 Market Street-

1

f

R

_ Chattanooga, Tennessee;37402-2801

{

.

_d

,

'

' Gentlemen

i

,a

1

<

'

SUBJECT:? FOLLOW-UP INSPECTION FOR PIECE PARTS PROCUREMENT AND

~

SAFETY SYSTEMS MODIFICATIONS'(INSTALLATION)~ INSPECTIONS'

50-327/87-40 AND 50-328/87,40

,

'

'

,

s

4

.

P

'

Enclosediis; thel report of the team inspection, conducted by Mr. G. T.

Hubbard and other.NRCLrepresentatives on July 13-24, 1987,.at the bequoyah

Nuclear: Power: Plant'of activities authorized by NRC Licensee Nos.- DPR-77:

and DPR-79. : The' team's findings were discussed with Mr. H.' Li Abercrombie

,

andlother members of your staff. on Julyf 24,1987,

1

'

The. inspection reviewed your corrective action at-Sequoyah relative to the.

inspection findings of.NRC Inspection Reports.50-327,328/86-61'(Piece' Parts.

_ l

.<

u

Procurement) and,50-327,328/86-68 (Sa'fety System Outage: Modifications '

,(Installation)).' Additionally, the inspection included a review of

. ;

,

,,.s'

Sequoyah'sLCritical Structures,' Systems and Components l(CSSC)' list, two.

1

open items-from NRC Ins'pection Report:50-327,328/86-11- related:to the1CSSC

j

' List, the'Sequoy(ah' Ouality Assurance Program,"and the Conditions Adverse to.

l

'

Quality Report CAOR) Program. Within these areas, the1 inspection '

I

consisted of examinatio.. sf selected procedures and records, interviews

' ,

,

with personnel, and observations by the inspectors.

'

  1. . .

' Based on the results of this inspection,-additional NRC inspection

!

.

' activities will 'be ' required.; In the area of procurement, a follow-up

!

-

'

inspection will be. performed prior-to Sequoyah entering Operational Mode 2

to further evaluate changes being made.in the new TVA procurement program

Jand to? review TVA's resolution for approximately 3000 missing maintenance

!

"

l

reouests (MRs) identified by the Replacement Items' Program (RIP). ~ Relative

,

to the Safety System Outage Modification ' Inspection-(SSOMI), the staff is

'

  1. .

l-

ifollowing up findings not closed during this inspection.

.i

l:>

s

-o

. , -

-

.

Th'e NRC: determined that TVA and SON are taking corrective actions to ensure

!

'

,

'o

that past and future procurement' activities do not adversely affect

safety-related equipment and affectLthe' safe operation of the plant. While

(

the, RIP. corrective ~ actions for environmentally cualified equipment were

'

-

found to be' acceptable, the corrective actions being'taken for seismically

!

bhh

c

,

,

H a

-

q

-

,

,

a

'

.-

,

r)

s

L

. ,

'

2'-

- NOV 3.01987 -

.u

Tenness.eeValleyAuthority[

!

-

w

3

-

.

,.

x

m

.

..

.

H

' qualified equipment were considered inadequate for ensuring qualification.

to SON seismic requirements of.IEEE-344'. Resolution of seismic. concerns.is

,

identified as:an: unresolved. item'(50-327/87-40-01; 50-328/87-40-02, reference-

h

,

' paragraph (2.3.1;2 of the enclosed' inspection report).. The NRC is working.

)

with your' staff to resolve this. item prior to restart.

{

.

.

.

q

r

+

The NRC determined that positive changes are being made in the procurement

1

. ,

process at TVA~and SQN through organization and procedural changes. Based

1

onLthe inspectors' reviews and evaluations, the NRC considered that the..

l

.new procedures and controls gcVerning.the relationship between Office of

l

Nuclear Power'(ONP) a'nd TVA Purchasing.were adequate to ensure that nuclear

material; and-equipment. (including replacement parts) met' appropriate nuclear

requirements.. While changes were"in process. the NRC identified concerns

-in the areas of procurement dedication package preparation and. inspection

i

l instructions for receiving inspectors. Resolution of concerns'in these-

1

&

i

areas of the new procurement program,:as well as TVA's resolution for the

!

missing MRs identified by' RIP is considered an inspection follow-up. item

1

'

1

(50-327/87-40-02; 50-328/87-40-03).

~

>

'l

The NRC' determined that TVA is taking corrective action on the SSOMI

violation examples which TVA. admitted to as being violations. Relative to

l

the violation examples denied by TVA, thelNRC was able to close all-but four.

L

. These will' be reviewed during future staff follow-up activities.

The NRC determined that while the.overall CSSC process is somewhat cumbersome

and difficult to implement,;it is . acceptable,and meets regulatory and FSAR-

1

requirements; however, some observations and recommendations are discussed in.

1

L

the. enclosed report.

.

'

~ The NRC determined that the QA program at Sequoyah appeared to be improving.

{

consistent with the comitments of the Nuclear Performance Plans and'the-0A

1

. Topical. With regard to the CA0R Program, the NRC determined that Sequoyah

was pursuing resolution of TVA identified problems with the program; however,

the NRC did provide coments in the report to assist in TVA's resolution of

o

programmatic problems.

q

In addition to the one unresolved item and one inspection follow-up item

i

1

-discussed above, two additional inspection follow-up items were identified.

These will be resolved during future NRC inspections. Details of these

,

items'are discussed in the enclosed inspection report.

c-

Any required action on TVA's part regarding open, previous inspection

-1

findings and/or new findings from this inspection should not be delayed

J

pending either a future NRC inspection or other action'by the.NRC.

l

..

b

f

..

-_

Tennesspe Valley Authority

-3-

NOV 3 01987

i

We are available to discuss any auestions you have regarding this

inspection.

Sincerely,

Steven D Richardson, Acting Director

TVA Projects Division

Office of Special Projects

i

Enclosure: Inspection Report Nos.

l

50-327/87-40 and 50 328/87-40

i

cc w/ enclosure: See next page

j

i

DISTRIBUTION:

'

Um Docket ~ Eiles d50-327/328)i

FMiraglia

.NRC PDR

EJordan

j

Local PDR

JPartlow

1

TP Reading

RPierson

j

OSP Reading

GHubbard

. JAxelrad

EBaker

!

SEbneter

JGilray

SRichardson

GNapuda

i

. SIM4ti6kT

KCleu

BDLiaw

KRHoods

'GGZech

.

ACRS(10)

.

SRConnelly

TVA-Bethesda

BHayes

OGC-Bethesda

i

W6nu

{

0FC

  • NRR:VIB
  • RI
  • NRR:VIB
  • NRR:ILRB
  • TP/PSB:TPD

I

!

......:................:..............:..............:..............:.____.........:............

NAME

ETBaker
GNapuda
KCleu
KRHooks
JWGilray

......:...............:..............:............._:_.............:..............:......_......

DATE

11/02/87
11/02/87
11/02/87
11/02/87
11/02/87

4

0FC

  • TP/PSB:TPD
  • BC/PSB:TPD
  • AD/IP:TPD
  • AD/P:TPD
A/DIB:TPD

......:................:..............:............__:.............:...g......._:.............

NAME

GTHubbard: sam
RPierson
BDLiaw
JZwolinski
SDRichardson :

__....:............... :..............:..............:..............:... .......___:....... __ ..

DATE

11/02/87
11/02/87
11/03/87
11/09/87
11/*A/87

I

  • SEE PREVIOUS CONCURRENCE

I

1

u-__

__

_

_ _ - ___

__

_

_ - _ _

" p-

l

TennesseelValley Authority

-4-

l

,

In addition to,the one unresolved item and one inspection follow-up item.

discussed above, two additional inspection' follow-up items were identified.

These will be resolved during future NRC inspections. Details of these'

3

items'are discussed'in the enclosed inspection report.-

1

Any required action on TVA's part regarding open, previous inspection

findings and/or new findings from this inspection should not be delayed

pending either a future NRC inspection or other action by the NRC.

We are available to discuss any questions you have regarding this

inspection.

Sincerely,

Stewart D. Ebneter, Director

TVA Projects Division

Office of Special Projects

Enclosure: Inspection Report Nos.

50 327/87-40 and 50 328/87-40

ccc w/ enclosure: See next page

DISTRIBUTION:

Docket Files (50-327/328)

FMiraglia

NRC PDR

EJordan

Local PDR

JPartlow

TP Reading

RPierson

OSP Reading

GHubbard

JKeppler/JAxelrad

EBaker

'SEbneter

JGilray

SRichardson

GNapuda

JZwolinski

KCLeu

BDLiaw

KRHoods

GGZech

ACRS(10)

SRConnelly

TVA.Bethesda

BHayes ~

OGC-Bethesda

OFC

NRR:V B A

)

NRR:VIB
NRR:ILRB
T
TPD
AD'P/T A

.

'

1

G15

.: g;f..g.. .

q '\\ __...: HCL'eu

_g ...: ........___ .:

.........:... . .......

......:

pu a

-:

KRHooks

ray

GZe

NAME : TBa er

.

......:.........___....:............__:..............:.......

.:__ ...........:.. ..........

.DATE :11/ 2 /87'

11/2487
11/f/87r
11/c2 /87

/f11/'tJ87

1 /

/87

1

4

D/DIR:TPD
DIR:TPD

0FC

TP/PSB:TPD-
BC/PSB:TPD
AD/IPyP,

j::AD/P:TPD

......._____..:...__........

......:. __ ...........:............ _:

........

-

NAME :GTHubbard: sam

RPierson
BDLi $ ~

l

JZwolins 1
SDEbneter

d:SDRichardson

..:........g..:......3......:...______

\\N._............:...........__

......:.........

11/2 /87 c f :11/'Z, /87
11/@/87

11/ /87

11/ /87

i

DATE :11/2 /87

-

1

T

J' '

.

- - - - - - - -

--

J

~,wp

,

7-

--

q

-

--

-

- --

  • -

,

J

"

, g, . .

,

iy

5E

,.

..

d.

'

!

.;

(~

. Tgnnesse Valley. Authority:

.4~..

,

q

y; ' +

1

i

! 4

r

' #'

- DISTRIBUTION:;

DocketFiles(50-327/328)l

NRC PDR-

p

7'

- Local PDR:

q

TP Reading'.

i0SP Reading .

.

,

.'JKeppler/JAxelrad-

j

'

t

SEbneter- ~

l

SRichardsoni

JZwolinski

,

'

!BDLiaw~

'GGZech'.

SRConnelly

BHayes'

_ ' . .

10GC-Bethesda '

d-

.FMiraglia

.EJordan

  1. cJPartlow

lRCPierson.

GTHubbard

, ETBaker -

4

idWGilray

'GNapuda:

'

,

o

KCleu.

KRHooks'

ACRS,(10),.

q

>TVA-Bethesda-

1

i

1.

f

a

d

.\\

r

gh M .:ff;f.g g y ...:..............:

y .....q:_.. .q Q ] f

.

NRR:VIB
NRR:ILRB

t

TPD

1

OFC

.:

VIB-
Rg

-

..

......_.. : pdi da

(

KCleu.
KRHooks

.:

.,......;

.

. . .... : .... ......... ... : .... . .. ... . .. : ... ...... .._ _ _ : .... .f f. /f.. :: ..G i l ca y

W NAME: :ETBa er

St

p

.

p

............:.

c

W DATE t10/;F/87'

10/24/87-
10/a7/87 e x 10p3/87-
10/241/87-

i

.

'}

(

-),

'

~ AD/P:5PD

D/DIR:TfD
DIR TPD

L OFC

TP/PSB:TPD
BC/PSB:TPD

-:AD/TP

l

l.......:................:..............:.....

..:.............:..............:___........

< NAME.1:GTHubgrgsam

RPiep;

-

BDL1
JZwolinski
SDRichardson :SDEbn ter

'(

......;

W

...

.

f..:..............:..............:............._:....

. ......

DATE
10/d/87:

~:10//6/87

'

10h 0/87
10/ /87
10/ /87
10/ /8

)

.

p<

l .:

p

t.

>

-.

-_-___________________j

E

- -.

~

a !

,

,

t

(

Mr. S.LA. White;

,

Tennessee' Valley Authority.

Sequoyah Nuclear Pla'nt

c

,

L

- General Counsel

Regional Administrator, Region II

l

- cc:

l

Tennessee Valley Authority

' O.S. Nuclear Regulatory Comission

'

~ 400 West Summit. Hill Drive

101 Marietta Street, N.W.

,

. E11 833

Atlanta, Georgia. 30323

l

~

l

Knoxville, Tennessee' 37902

Resident Inspector /Sequoyah NP

' Mr..R. LGridiey

c/o U.S.' Nuclear Regulatory Comission

.

- Tennessee Valley Authority '

2600'Igou Ferry Road-

{

SN 1578: Lookout Place

Soddy. Daisy, Tennessee 37379

- Chattanooga,~ Tennessee' 37402-2801

.

]

'

Mr. Richard King

Mr. H. L.'Abercrombie .

c/o U.S. GA0

y

V

Tennessee Valley Authority;

1111 North Shore Drive

!

,

' Sequoyah Nuclear Plant

Suite 225,' Box 194

/

' P.O. Box 2000

Knoxville, Tennessee 37919

,

Soddy Daisy,: Tennessee 37379

'q

Tennessee Department of

Mr. M. R. Harding'

.

Public Health

. Tennessee. Valley Authority-

ATTN: Director, Bureau of:

.

Sequoyah Nuclear Plant

Environmental Health Services

P.O.-Box 2000

'Cordell Hull Building-

' Soddy Daisy, Tennessee 37379

Nashville, Tennessee 37219

Mr. D. L. Williams.

Mr. Michael H. Mobley, Director.

1

'

- Tennessee Valley. Authority.

. Division of Radiological Health

ll

' 400-West Sumit Hill Drive

.T.E.R.R.A. Building

!

W10 B85- '

150 9th Avenue North

'l

Knoxville, Tennessee 37902

Nashville, Tennessee 37203

.i

-

.

_

County Judge

- Hamilton' County Courthouse'

,

,

(

Chattanooga, Tennessee 37402

.

_

=_

___ _ _ _ _