Forwards Followup Insp Repts 50-327/88-07 & 50-328/88-07 on 880125-29.Violation Noted.Insp Determined That Facility Implemented Program Rept to Correct Procurement Deficiencies Identified in Rept
ML20151R597
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/13/1988
From: Richardson S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20151R600 List:
References
NUDOCS 8804280040
Download: ML20151R597 (3)


See also: IR 05000327/1988007

Text

- ; a -

V

.

6

g"% ,,k UNITED STATES

[

'

i

-

g NUCLEAR REGULATORY COMMISSION I

3 :j WASHINGTON, D. C. 20555

'

\ + ,. . . APR 131988

Docket Nos. 50-327/328

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, Tennessee 37402-2801

Gentlemen:

1

SUBJECT: FOLLOW-UP INSPECTION FOR PIECE PARTS PROCUREMENT (50-327/88-07

'

AND 50-328/88-07 l

Enclosed is the report of the team inspection conducted by Mr. G. T. Hubbard

and other NRC representatives on, January 25-29, 1988, at the Sequoyah Nuclear

Power Plant of activities authorized h NRC Licensee Nos. OPR-77 and DPR-79.

The team's findings were discussed with P. R. Wallace and other members of your

staff on January 29, 1988. -

The inspection reviewed your corrective actions at Sequoyah relative to the NRC

Inspection Reports 50-327,328/86-61 (Piece Parts Procurement) and 50-327,

328/87-40 (Piece Parts Procurement / Safety Systems Outage Modifications

(Installation) Inspection (SSOMI) Follow-up). The SSOMI findings (identified

in NRC Inspection Report 50-327,328/86-68) that remained open following the

87-40 inspection were not evaluated during this inspection.

The inspection determined that TVA/Sequoyah has implemented a program to

correct procurement deficiencies identified in the above referenced inspection

reports. While the NRC observed improvements in TVA's procurement of purchased

parts due to your corrective actions, the NRC determined that dedication of

comercial grade parts for use in safety-related applica.tions was still being

accomplished on a part number for part number basis. This inadequate dedica-

tion process occurred due to a failure of the Contract Engineering Group at

Sequoyah to follow procedures.

This failure to take adequate corrective action in the dedication of commercial

grade parts and failure to follow procedures is an apparent violation (50-327,

328/88-07-01) of NRC regulations and is being evaluated to determine its

severity. TVA will be notified when the NRC makes a final decision concerning

this apparent violation of NRC requirements. While TVA did take immediate

corrective action on the above finding during the inspection relative to

restart of Unit 2, TVA should ensure that long term corrective actions

preclude the reoccurrence of the above findings.

8804200040 800413

PDR

G ADOCK 05000327

PDR

s

.

.

Mr. S. A. White -2-

While improvements in receipt inspection of dedicated commercial grade parts

were observed by the NRC, TVA is still implementing additional improvements.

As stated in the attached Inspection Report, one concern was raised relative to

the documentation in inspection reports for dedicated parts. The NRC's posi-

tion is that when critical characteristics are identified for receipt

inspection in dedication packages, the characteristics should be inspected with

contr31~ led and calibrated measuring and test equipment and inspection ,

documentation should demonstrate that identified inspection requirements have

been met. Since discussions with TVA indicated some disagreement with this

position, TVA is requested to respond in writing as to how TVA plans to ensure,

through inspections and inspection documentation, that commercial grade parts

are adequately dedicated for use in safety-related systems.

Inspection follow-up item 50-327,328/88-07-02 was identified in the report

relative to receipt inspection of dedicated parts. Based on the inspection

findings, receipt inspection was considered by the NRC to be adequate to

support restart of Unit 2.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures  !

will be placed in the NRC Public Document Room. The responses directed by this ,

letter and its enclosures are not subject to the clearance procedures of the l

'

Office of Management and Budget as required by the Paperwork Reduction Act of

1980, PL 96-511.

We are available to discuss any questions you have regarding this inspection.

Sincerely, i

6

Steven D. Richardson, Acting Director

TVA Projects Division

Office of Special Projects

Enclosure:

Inspection Report Nos.

50-327/88 07 and 50 328/88 07

cc w/ enclosure: see next page

I

I

M\ h )

0FC :TVA:TP:PSB :NRR:RVIB :TVA:TP:PSB/BC:TVA:g/IP( /: ActD VA  :  :

.....:......___

N AME : GHubba ..: Grd : a cm : ifa'Qj._ _ : ._ _ _ _..._3 __ :_..._ _ :g..__:.. --..____

_ _ _ _...',{_Y

_....____.

ker :RPierson :BDL % v : sri dson :.  :

.____:._______.___:..__.__.__..:___,..__..___:-__.___..___:.....______:....-_______:..--___.

DATE :4/ f /88 :4/7/88 :4/ 9 ,/88 :4/\\ /88 :4/ D /88  :  :

eb0FFICIALRECORDCOPY'VW(r

,

--r ,,n, - e, ,- - - . , -- - - - - ,. - - --- - -.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

.

~

.

.

Mr. S. A. White

Tennessee Valley Authority Sequoyah Nuclear Plant l

l

cc:

General Counsel Regional Administrator, Region II

Tennessee Valley Authority U.S. Nuclear Regulatory Commission

400 West Summit Hill Drive 101 Marietta Street, N.W.

E11 B33 Atlanta, Georgia 30323

Knoxville, Tennessee 37902 ,

Resident Inspector /Sequoyah NP  !

Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Commission l

Tennessee Valley Authority 2600 Igou Ferry Road

SN 157B Lookout Place Soddy Daisy, Tennessee 37379

Chattanooga, Tennessee 37402-2801 .

Mr. Richard King

Mr. H. L. Abercrombie c/o U.S. GA0

Tennessee Valley Authority 1111 North Shore Drive

Sequoyah Nuclear Plant Suite 225, Box 194

P.O. Box 2000 .

Knoxville, Tennessee 37919

Soddy Daisy, Tennessee 37379 ,

Tennessee Department of Health

Mr. M. R. Harding and Environment.

Tennessee Valley Authority ATTN: Director, Bureau of Environment -

Sequoyah Nuclear Plant T.E.R.R.A. Building, 1st Floor

P.O. Box 2000 150 9th Avenue North

Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219-5404

Mr. D. L. Williams Mr. Michael H. Mobley, Director

Tennessee Valley Authority Division of Radiological Health

400 West Summit Hill Drive T.E.R.R.A. Building, 6th Floor

W10 885 150 9th Avenue North

Knoxville, Tennessee 37902 Nashville, Tennessee 37219-5404

County Judge Dr. Henry Myers, Science Advisor

Hamilton County Courthouse Committee on Interior

Chattanooga, Tennessee 37402 and Insular Affairs

U.S. House of Representatives

Washington, D.C. 20515

.

4

e

e

4 - v t