ML19319E495

From kanterella
Jump to navigation Jump to search
Forwards Followup AO 50-313/75-1A
Date released: 11/29/2019 Download: ML19319E495


AO 50-313/75-1: on 750120,inlet Es Valve CV-3813 Failed to Open & Outlet Es Valve CV-3814 Failed to Reach Full Open Position.Caused by Operator Binding Due to Lubrication Lack. Valves Lubricated.Valve CV-3814 Will Be Inspected
ML19319E499
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/30/1975
From: Marlin J, Phillips J, Rueter D
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19319E499 (3)
Forwards AO 50-313/75-01
ML19319E498
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/30/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: CASE E G
Office of Nuclear Reactor Regulation
References
Download: ML19319E498 (1)
Followup AO 50-313/75-1A:on 750120,water Outlet Es Valve CV-3814 Full Open Position Not Reached During Surveillance Testing.Caused by Galling of Metal Between Stem & Upper Bushing.Stem & Bushing Polished & Bushing Lubricated
ML19319E497
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/16/1975
From:
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19319E497 (3)
Forwards Followup AO 50-313/75-1A
ML19319E494
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/16/1975
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: RUSCHE B C
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19319E494 (2)