Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20049J202 + (Discusses TMI Action Item II.K.3.3, Reporting Relief Valve & Safety Valve Failures & Challenges. Requests Commitment to Comply W/Reporting Requirements.Response within 30 Days Requested)
- ML19275J137 + (Discusses TMI Action Plan & Commission Policy Statement on Licensing Pause)
- ML20214E073 + (Discusses TMI Action Plan Followup,Per 860204 Memo.J Jaznos Committed to Provide Status of All TMI Items in Near Future for Insp)
- ML20100A577 + (Discusses TMI Alert 850315 Notice to Commission,Aslab,Aslb & Parties & Request for Investigation & Clarification.Licensee Has Not Requested Change to Tech Specs.Notice Should Be Denied.Svc List Encl.Related Correspondence)
- ML20093M496 + (Discusses TMI Alert Objection to Licensee Fifth Set of Interrogatories Re H Meyers Investigation of Subj of Proceeding.Response Re TMI Alert Intentions Concerning Rept of Majority Staff Needed by 841022.Related Correspondence)
- ML20003D383 + (Discusses TMI Citizens Advisory Panel Concerns Re Replacing State Representatives w/non-voting Observers on TMI Citizens Advisory Panel.Governor Has Been Requested to Consider at Least One Voting State Representative)
- ML19275D946 + (Discusses TMI Task Action Plan Criteria for Automatic & Manual Actions.Suggests Expansion of Plan Ii.E Sys Design, IC Operating Procedures &/Or Id Control Room Design)
- ML19276H302 + (Discusses TMI-1 QA Plan.Comments on Plan Acceptability Requested by 740221)
- ML19257D585 + (Discusses TMI-1 Restart Proceedings.Issues of Plant Design Mods,Emergency Planning & Separation of Units Should Be Heard Early.Issues of Mgt Capability & Technical Resources Require Further Definition.Certificate of Svc Encl)
- ML19322E012 + (Discusses TMI-2 Accident & Status at Scheduled Hearings on Plant Restart in Response to 790730 Request for Info.Hearing Date Not Set)
- ML20214V768 + (Discusses TMI-2 Cleanup Project Weekly Status Rept for Wk of 860922-28.Areas Discussed Include Defueling,Plant Status, Environ Monitoring,Auxiliary & Fuel Handling Bldg Activities & NRC Evaluations in Progress)
- ML20136B072 + (Discusses TMI-2 Containment Isolation.Suggests That Open Containment Ventilation Valves Could Have Caused Greater Radioactive Release.Requests Review)
- ML19224C193 + (Discusses TMI-2 Criteria for Loss of Offsite Balance of Plant Electrical Power,Revision 1)
- ML19224C224 + (Discusses TMI-2 Effluent Monitors 1,2,3,&4)
- ML19221A416 + (Discusses TMI-2 Fuel Damage.Core Exposed Three Times.Damage Caused by Oxidization of Fuel Assemblies & Zr Alloy Components.Fuel Temp May Have Reached 3,500 F)
- ML19312A267 + (Discusses TMI-2 Implications)
- ML19221A601 + (Discusses TMI-2 Startup Range Counts from D(Gamma,M) Reactions in Downcomer Region Rather than from Normal Source Multiplication in Core)
- ML20059E910 + (Discusses TS 92-16:deletion of Supplemental Exam of RPV Nozzles from TS for Plant Units 1 & 2 to Remove SR 4.4.1.b from TS)
- ML20081J212 + (Discusses TS Amend Which Would Allow SG Interim Plugging Criteria to Be Increased to 3 Volts.Benefits to Proposal Listed)
- 2CAN039804, Discusses TS Bases Change Re Plant Protection Sys Matrix Logic Testing.Encl Revised Bases Page B 3/4 3-1a Should Be Issued Immediately Due to Increase in Current Channel Testing Frequency + (Discusses TS Bases Change Re Plant Protection Sys Matrix Logic Testing.Encl Revised Bases Page B 3/4 3-1a Should Be Issued Immediately Due to Increase in Current Channel Testing Frequency)
- ML20134M177 + (Discusses TS Change 96-01 Re Framatome Cogema Fuel Mark-BW17 Fuel Conversion.Encl Info Re thermal-hydraulic Analyses Withheld)
- ML20087H479 + (Discusses TS Change Request 93-16,re Conversion to TSs Contained in NUREG-1433)
- ML18065A861 + (Discusses TS Change Request Re Primary Coolant Pump Flywheel Insps Frequency Extension)
- ML18065A862 + (Discusses TS Change Request Re Primary Coolant Pump Flywheel Insps Frequency Extension)
- ML20236N385 + (Discusses TS Clarification at Quad Cities Re Interpretation of Application of Action 3 of TS 3/4.5.A,in Event High Pressure Cooling Injection Pump Made Inoperable for Surveillance Testing Concurrent W/Inoperable LPCI Pump)
- ML20082F584 + (Discusses TS Improvement Program)
- ML20236N864 + (Discusses TS Interpretation on Application of Davis Besse TS 3.6.5.1 & 3.6.5.2.TB Branch Recommends That Davis Besse Consider Converting TS to Improved Standard TS)
- ML14314A561 + (Discusses TS Note 1 Regarding Applying Improved STS to DGs W/Seven Day Allowed Outage Times)
- ML20137P595 + (Discusses TS Policy Question - Reply)
- ML20137P589 + (Discusses TS Policy Question Re Vortexing in Refueling Water Tank & Requests Assistance Determining Where Policy/Position Was Documented)
- ML20204E494 + (Discusses TSs Bases Change Re 3/4.4.1,3/4.6.1.7,3/4.6.3, 3/4.7.12 & 3/4.8.4.Forwards Affected Bases Pp B 3/4 4-1, B 3/4 6-3,B 3/4 6-4,B 3/4 7-7 & B 3/4 8-3)
- ML18039A738 + (Discusses TVA 980612 Request for Relief 2-SPT-11,Rev 1,from Requirements of ASME BPV Code,Section XI for Browns Ferry Npp,Unit 2,Second 10-Year Interval ISI Interval.Safety Evaluation Granting Request for Relief Encl)
- ML19296C152 + (Discusses TVA Request for Extension of 790831 License Expiration Date,Due to Const Delays.Extension Does Not Affect Radiological,Nuclear Safety or Other License Parameters.Amend Should Be Granted)
- ML17174A009 + (Discusses TVA Responses to IE Bulletin 79-01 Re Environ Qualification of stem-mounted Limit Switches on Main Steam Line Isolation Valves.Lists Conditions to Be Met for Unqualified Switches)
- ML20210B932 + (Discusses Table 1 to Guidelines for Decontamination of Facilities Re Acceptable Surface Contamination & Questions Whether Table & Footnote F Can Be Applied to Surface Contamination from Primarily Beta Emitting Sources)
- ML20211H038 + (Discusses Tank Waste Remediation Sys Project Established by Us DOE in 1991 to Manage,Retrieve,Treat,Immobilize & Dispose of Approx 204 Million Liters of Radwaste Stored in 177 Underground Tanks Located at Hanford Site,Richland,Wa)
- ML19208C436 + (Discusses Tape & Microfiche Data of History of Company Fuel Irradiated for Three or More Cycles,In Response to NRC 790531 Request)
- ML20129F663 + (Discusses Tape Recorded Statements of Witnesses & Voices Concerns Re Witnesses Ability to Recall Specific Statements & Should Be Afforded Opportunity to Review Statements Before Responding to Further,More Detailed,Questions)
- ML19211B943 + (Discusses Task Action Plan A-11 Re Vessel Toughness Special Considerations.B Odette,Of Univ of Ca,Sending Papers Which Might Prove Useful.Vendors Also Agreeable to Sharing Spectral Info)
- ML19263G523 + (Discusses Task Action Plan A-11,Revision 2 Re Engineering Applications of J-integral Elastic Plastic Fracture Mechanics Meethodology.Comments Encl.Findings Will Be Presented at 800409 Intl Meeting in Oakridge)
- ML20040E228 + (Discusses Task Action Plan A-45 Shutdown Heat Removal Requirements. Three Addl Parts Recommended Re Operator Training,Augmented Control Room Designs & Computer Software)
- ML17250A526 + (Discusses Task Action Plan Re Asymmetric LOCA Loads. Specified Repts Support Conclusion That Under Worst Combination of Loadings,Including SSE Effects,Realistically Postulated Flaw Will Not Cause Guillotine Break)
- ML19291C048 + (Discusses Task B-06, Loads,Load Combinations & Stess. Limits Divided Into Four Phases.Phase I Will Be Complete on 791231,Phase 2 in Sept 1980,Phase 3 in Dec 1980 & Phase 4 in Sept 1981)
- ML16299A520 + (Discusses Task Interface Agreement (TIA 92-03) Re Crack in Facility DHR Drop Line)
- ML17349A400 + (Discusses Task Interface Agreement TIA 92-28 Concerning Unit 4 Restart Following Hurricane Andrew.Understands That NRR Responsible for Accomplishing Listed Post Restart Activity)
- ML20129E395 + (Discusses Task to Update PRA Results on Five Lwrs.Site Visit by Sandia Requested on 850722-26 to Obtain Current Info on Risk Important Hardware & Procedure Mods)
- ML20126J535 + (Discusses Tasks II-b & II-c of NRC-02-80-076 & Provides Comments Re Specs for Addl Deep Well to Be Drilled by licensee.Goldberg-Zoino Hydrological Rept Was Received)
- ML20134G569 + (Discusses Tasks of Ongoing Research Project at Oak Ridge Natl Lab,As Summarized During 961009 Telcon)
- ML20238A576 + (Discusses Tasks to Be Completed Re Umtrap Ambrosia Lake Site.Site Mobilization & Const Targeted for Sept 1987. Meeting Scheduled on 870824 to Determine Status of Support Activities & Actions to Be Completed)
- ML20128E059 + (Discusses Tdi Diesel Generator Operating Restrictions. Generic Resolution of Adequacy of V-16 Crankshaft for full-rated Load & Overload Not Established.Engine Testing at Loads Greater than 185 Psig Approved)
- IA-86-166, Discusses Team 860310-21 Review of Files Re Intimidation, Harassment & Wrongdoing at Tva.Review Schedule,Results & Preliminary Conclusions Listed + (Discusses Team 860310-21 Review of Files Re Intimidation, Harassment & Wrongdoing at Tva.Review Schedule,Results & Preliminary Conclusions Listed)