ML19296C152

From kanterella
Jump to navigation Jump to search
Discusses TVA Request for Extension of 790831 License Expiration Date,Due to Const Delays.Extension Does Not Affect Radiological,Nuclear Safety or Other License Parameters.Amend Should Be Granted
ML19296C152
Person / Time
Site: 07002443
Issue date: 08/29/1979
From: Crow W, Delaney J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19296C149 List:
References
NUDOCS 8002250290
Download: ML19296C152 (1)


Text

-

m AUG 2 01979

)v l

/-

\\

/

\\

/

DOCKET NO.:

70-2443 APPLICANT:

Tennessee Valley Authority (TVA)

FACILITY:

Sequoyah fluclear Plant, Unit 1

SUBJECT:

LICENSE AMENDMENT APPLICATION

~ Background TVA is licensed under NRC Materials License No. SNil-1716 for the storage of fuel for eventual use in the Sequoyah fluclear Plant, Unit 1.

The license is scheduled to expire August 31, 1979.

By application dated July 5,1979, TVA has requested an extension of the expiration date to January 1980.

O.~

-???

Discussion The applicant states that because of construction delays, an extension o the expiration date of this license is required. A request for an extension in the term of the construction permit for the facility has also been made. An extension of the expiration date does not affect the

.. = ~.

F radiological, nuclear safety, or other parameters on which was based the M

issuance of the license.

Man Recommendation

=

I recommend that the license extensien be granted..

Original Signed By:

J. C. Deleney

{'

J. C. Delaney jff Uranium Fuel Licensing Branch m

Division of Fuel Cycle and

((

Original sided By:

Material Safety

.,., y.;

W. T. Crow iW Approved By W. T. Crow, Section Leader h:

8002 250940