Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059E621 + (Discusses Info Re Ieb 91-001 Reportable Criticality Safety violation-criticality Safety Specification for Storage BWR Fuel Assemblies Inconsistent W/Criticality Safety Analysis)
- ML20059B309 + (Discusses Info Re Iein 92-030, Falsification of Plant Records, Issued on 920423 & Forwards NOV Re 920607-0718 Insp at Limerick Generating Station)
- ML20058C884 + (Discusses Info Re Insp Repts 50-245/92-29,50-336/92-31 & 50-423/92-38)
- ML19329D427 + (Discusses Info Re Issues 1,3,4,5,6,7 & 8 of Facility Proceeding Given to E Stebbins in 730705 Telcon.Aec Not Aware of Studies Performed or Contracted by AEC Re Conservation of Energy)
- ML20207L407 + (Discusses Info Re LSN Rule Package.Author Proposes to Add to End of Commission Paper,Just Before Resources Section Listed Info)
- ML18101A327 + (Discusses Info Re License Change Request 94-30 Re Addition of New Action Statement to TS 3.1.3.2.1,position Indication systems-operating for Both Salem Units)
- ML20196J304 + (Discusses Info Re Model MRC-N-S-W-PuBe-400 Neutron Source Manufactured by Monsanto,That Utah Division of Radiation Center Requested.Source Manufactured in 1950 & Early 1960 & Licensed by Us AEC)
- ML17331B211 + (Discusses Info Re NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in SG Tubes)
- 3F0296-20, Discusses Info Re NRC Response Technical Manual Training Session + (Discusses Info Re NRC Response Technical Manual Training Session)
- ML20199E561 + (Discusses Info Re Plant Implementation of Mods Associated W/Gl 96-06, Assurance of Equipment Operability & & Containment Integrity During Design-Basis Accident Conditions)
- ML18059A433 + (Discusses Info Re Pressurizer Safe End Crack Repair Action Plan.Rept of NDE Addressing Factors Necessary to Cause Primary Water Stress Corrosion Cracking Encl)
- ML17310A721 + (Discusses Info Re Process of Installing Second Simulator & Planned pre-certification Training)
- ML20056G240 + (Discusses Info Re Proposed Construction of Addition to UO-2 Building to House Expanded Analytical Lab Facilities)
- ML20097G235 + (Discusses Info Re QA Program Change to Enable Implementation of performance-based Audit Scheduling Program)
- ML20056E608 + (Discusses Info Re Request for Enforcement Discretion from TS 4.8.1.1.2.e to Avoid Unnecessary Shutdown of Unit 1)
- ML20095F014 + (Discusses Info Re Response to RAI for Thermo-Lag Fire Barriers)
- 2CAN129504, Discusses Info Re Schedule for GL 90-06 Resolution + (Discusses Info Re Schedule for GL 90-06 Resolution)
- ML20058C913 + (Discusses Info Re Site Visit to C-E to Hematite,Mo to Discuss Criticality Safety Issues Pertaining to Renewal of License SNM-33)
- 0CAN079509, Discusses Info Re TS Change Request,Dated 950519,re Open Containment Airlocks During Core Alterations + (Discusses Info Re TS Change Request,Dated 950519,re Open Containment Airlocks During Core Alterations)
- ML20058E744 + (Discusses Info Re Telcon Between P Matson & J Hanson Re Arrangements for Administration of Initial RO to Retake Licensing Exam at Pbnp Scheduled for 940221)
- ML20059L536 + (Discusses Info Re Upcoming 930729 Meeting Re F-294 Submission Which Is Currently Under Development)
- ML17331A995 + (Discusses Info Re Upcoming Mod to Cook Nuclear Plant Control Rooms Per Requalification Program Curriculum)
- ML20063H738 + (Discusses Info Re Use of Bypass Test Capability for Instrumentation Maint)
- LIC-94-0198, Discusses Info Re Use of Cecor Power Peaking Uncertainties at Fort Calhoun Station + (Discusses Info Re Use of Cecor Power Peaking Uncertainties at Fort Calhoun Station)
- ML19308B684 + (Discusses Info Re Whether Accident Should Be Designated as Extraordinary Nuclear Occurrence,Per Constituent Ltr.Panel Completing Rept Evaluating Technical Data & Public Comment on Issue.Rept Will Be Available for Public Comment)
- GO2-93-227, Discusses Info Re Withdrawal of TS Change Request for License NPF-21 + (Discusses Info Re Withdrawal of TS Change Request for License NPF-21)
- ML20138L646 + (Discusses Info Received from Former Employee Re Drinking Incident That Occurred During Christmas Party Held in Dec 1978.Portions Deleted.Rg Taylor Undated Ltr Encl)
- ML20129G881 + (Discusses Info Received on 810425 & 0506 Re Problems W/Work by Design Engineering & Brown & Root Plan to Lay Off 230 People.Concern Increased That Brown & Root Engineering Causing Const Delays)
- ML20248L833 + (Discusses Info Recently Received by NRC Re Deficiencies Associated W/Augmented Offgas Sys at Vermont Yankee. Understands That Licensee Chartered Review Team to Look Into Matter.Requests Results of Review within Next 30 Days)
- ML20045G138 + (Discusses Info Reported by Senator J Hansen Re Efforts to Adequately Fund Agreement State Program)
- ML20038A642 + (Discusses Info Requested & Items Discussed at 811030 Meeting.Related Correspondence)
- ML19351F411 + (Discusses Info Required for Development of Criteria Re Decontamination of Area Adjacent to Property.Area Must Be Decontaminated & Radionuclides Identified)
- ML19210A645 + (Discusses Info Required on Operator & Senior Operator License Renewal Applications Re Participation in Operator Requalification Program)
- ML20199B125 + (Discusses Info Submitted Re 120-day Response to GL 96-06, Assurance of Equipment Operabiltiy & Containment Integrity During DBA Conditions, Per Implementation of Mods.If Commitments Revised,Revised Response Should Be Submitted)
- ML16209A332 + (Discusses Info Used During Evaluation of 970429 Amend Request for Licenses DPR-38,DPR-47 & DPR-55,respectively. Documents Used for Review of Amends,Encl)
- ML20207L156 + (Discusses Info in 970922 Application Re Models N610-0063, N610-0134 & Voyager.Models Acceptable for Licensing Purposes Per Conditions of Encl Registration Certificate NR-0536-D-110-B)
- GO2-93-144, Discusses Info on Evaluation of Lost Part in Rv Covering CR Interference,Corrosion or Adverse Chemical Reaction W/ Other Reactor Matls,Blocked Flow to Fuel Bundle & Subsequent Overheating of Cladding & Fretting Wear + (Discusses Info on Evaluation of Lost Part in Rv Covering CR Interference,Corrosion or Adverse Chemical Reaction W/ Other Reactor Matls,Blocked Flow to Fuel Bundle & Subsequent Overheating of Cladding & Fretting Wear)
- BSEP-95-0247, Discusses Info on GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance + (Discusses Info on GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance)
- ML20128F991 + (Discusses Info on Qualification of Portable Gauge Instructors.Forwards Guide Used as Std for Instructor Qualifications & Health Physics Journal,Providing Variety of Radiation Safety Courses.W/O Encl)
- ML19225A222 + (Discusses Info to Be Included in Offsite Dose Calculation Manual.Forwards 790126 Draft Offisite Dose Calculation Manual)
- ML19225A223 + (Discusses Info to Be Included in Offsite Dose Calculation Manual.Forwards 790126 Draft Offisite Dose Calculation Manual)
- ML19347F830 + (Discusses Info to Be Submitted in Next Revision to Facility Site Addendum Re Ultimate Heat Sinks & Svc Water Sys Per 810323 Meeting Summary & 810324 Request)
- ML18009A530 + (Discusses Informal Complaint Filed by North Carolina Eastern Municipal Power Agency Re Progress Rept,Per Ongoing Arbitration.Complainant & Util Should File Written Monthly Status Repts,Per Arbitration Proceeding)
- ML20236R491 + (Discusses Informal Discovery Re Private Fuel Storage.Copies of All Listed Documents in Possession,Custody or Control of Private Fuel Storage Requested to Be Reviewed.Related Correspondence)
- ML19308C177 + (Discusses Informal Interview W/R Zavadoski on 790731 & 0801. Radwaste Treatment Sys,Radioactive Source Terms After 790328 Incident & Actions Taken to Reduce Releases to Environ Discussed)
- ML17059A440 + (Discusses Informing NRC That Util in Agreement W/Gl 89-10 Program Extension & Conditions Described in)
- ML17291B145 + (Discusses Informing NRC of Plan to Remove Reference to Contract C-30046 from Emergency Plan.Finds Changes Acceptable)
- ML18096A161 + (Discusses Informing That Facility Does Not Have Rosemount Transmitters,Per Bulletin 90-01, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Response Acceptable & NRC Review Complete)
- ML20149H448 + (Discusses Informing That Transfer of Fission Chamber Detectors Will Be Subject to All Terms & Conditions of Agreement for Cooperation Concerning Civil Uses of Atomic Energy Between Govt of Republic of Korea & Govt of Us)
- ML20205E982 + (Discusses Initial Assessment of Pilgrim Safety Enhancement Program.Summary of Contents,Suggested Representatives & Guidance Re 10CFR50.59 Reviews Extracted from IE Manual)
- ML20149J595 + (Discusses Initial Conditions,Instrumentation & Test Procedure for PAR-1 Test)