ACCEI ERA~KB DOCVMENT DIS VTION SYSTEM REGUL RY INFORMATION DISTRIBUT SYSTEM (RIDS) p' ACCESSION NBR:9311020259 DOC.DATE: 93/10/28 NOTARIZED:
NO DOCKET g
'j FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation, Director (Post 870411
SUBJECT:
Discusses info re process of installing second simulator 6 planned pre-certification training.
DISTRIBUTION CODE:
M003D COPIES RECEIVED:LTR 3 ENCL C SIZE:
TITLE: Operator Regualification Program NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
D I
05000528 05000529 P5PPP530 D
RECIPIENT ID CODE/NAME PDV PD TRAN,L COPIES LTTR ENCL RECIPIENT ID CODE/NAME HOLIAN,B COPIES LTTR ENCL INTERNAL: ACRS NR REG EXTERNAL: NRC PDR HHFBPT 01 AEOD/DOA NRR/DRCH/HOLB RGN5 NSIC 1
1 D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL~ 0 D
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 102-02712-JML/BAG/P JC October 28, 1993 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D. C. 20555
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Pre-certification Training Planned For Second Simulator File: 93-005-419.06 Arizona Public Service Company (APS) is in the process of installing a second, plant-referenced simulator. Certification testing ofthe new simulator is close to completion, and APS expects to submit the certification package to the NRC on or about December 10, 1993.
As discussed during a
telephone conference call on October 18, 1993, among representatives of NRR's Operator Licensing Branch, NRC Region V, and APS, it is APS'nderstanding of 10 CFR 55.45(b)(1) that while operating tests must be administered on a certified simulator, training may be conducted on a simulator prior to certification.
APS anticipates certification testing of the second simulator will be completed approximately November 1, 1993. At that time, the PVNGS Nuclear Training Department plans to begin routine operator training using the new simulator.
For the approximate period of November 1 to December 10, 1993, PVNGS will be conducting training on a simulator for which certification testing is complete, but which has not been formally certified to the NRC. During this interim period, the new simulator willnot be used to take credit for annual operating tests.
Should you have any questions or need further information about APS'imulator training plans, please call Paula Coffin at (602) 393-5868.
Sincerely, JML/BAG/PJC/rv 9311020259'31028 PDR ADOCK 05000528 V
'l r<
~a 4
I
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Pre-certification Training Planned for Second Simulator Page 2 cc:
W. F. Conway R. M. Gallo B. E. Holian B. H. Faulkenberry L. F. Miller, Jr.
J. A. Sloan