Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Containment Depressurization". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20138J181  + (Discusses Const Appraisal Team Insp Rept 50-455/85-27 on 850819-30 & 0909-20 & Forwards Notice of Violation)
  • ML20138J178  + (Discusses Const Appraisal Team Insp Rept 50-455/85-27 on 850819-30 & 0909-20 & Forwards Notice of Violation)
  • ML19254B375  + (Discusses Const Deficiencies in safety-related Structures & Sys at Facility.Problems May Raise Major Issues Re Nuclear Plant Const in General.Forwards 14 Questions Re Quality of Const at Facility)
  • ML20133C568  + (Discusses Const Insps 50-369/73-02 & 50-370/73-03 on 730529-0601 & Forwards Notice of Violation.Areas Examined: QA Records of Containment Bldg Welding Program.Ag Staples 730625 Notice of Appearance Also Encl)
  • IR 05000482/1981015  + (Discusses Const QC Dept (Cqcd) That Existed During Const Phase & Clarifies That Cqcd Did Not Exist During Period Covered in Insp Rept 50-482/81-15)
  • ML20004G103  + (Discusses Const Schedule & Improvements in Personnel Organization,In Response to NRC 810609 Request for Update Re Projected Const Completion Date.Quarterly Updates Will Be Provided Until SER Issuance)
  • ML20032A971  + (Discusses Const of Access Shaft & Freeze Wall in Preparation for Underpinning Auxiliary Bldg.Underpinning Will Be Remedial Action for Inadequately Compacted Plant Fill. Requests Concurrence to Proceed W/Const Schedule)
  • ML20125D897  + (Discusses Const of GE Nuclear Training Ctr in State of Il. Ctr Will Utilize Dresden II Reactor Plant Simulator to Train Customer Operating Staffs.Requirements Listed Re Proposed Policy on Qualifications for Operator License Exams)
  • ML20235D085  + (Discusses Const of Proposed Nuclear Reactor on Earthquake Prone Site at Bodega Bay,Ca)
  • ML20003C288  + (Discusses Constituent Comments on Proposed Rules 10CFR30,32, 70 & 150 Re Possession,Use & Transfer of Low Enriched U as Contaminant in Metals.Requests Response to Listed Questions & Concerns Before 801222)
  • ML20012B954  + (Discusses Constituent Jj Sontag of Massapequa Park Ltr Re NRC Proposed Rule Changes on Emergency Planning.Nrc Currently Engaged in Analyzing Comments Preparatory to Making Judgement on Further Action Re Proposed Rule)
  • ML20066D717  + (Discusses Constituent L Kuhse Request for Assistance in Determining Actual Definition of Drug Rehabilitation,Per NRC)
  • ML20198K500  + (Discusses Constituent Me Marucci Ltr Re Issuance of Design Change in Spent Fuel Pool for Facility.Review Requested for Encl State of CT Dept of Health Svcs Memo.Info Partially Withheld)
  • ML19347E671  + (Discusses Constituent Re Limited Appearance Statements at Restart Hearing.Addl Limited Appearances Were Scheduled Due to Importance of Proceeding & Length of Hearing)
  • ML20248A517  + (Discusses Constituent,Ct Gorton Inguiry About NRC Proposed Amend to Regulations Entitled, Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants. Fr Pages on Subj Encl)
  • ML20217N858  + (Discusses Constituent,E Mayer Concerns Re Shutdown of Reactors 30 Days Prior to January 1st,to Give Reactors Time to Cool Down in Possibility of Computer Malfunction Which Would Cause Meltdown)
  • ML20029E017  + (Discusses Constituent,J Fleming,940309 Ltr Re Reception Ctr for EPZ Population North of Facility in Plymouth,Ma.Requests That NRC Respond to Points Raised in Constituent Ltr)
  • ML20205F040  + (Discusses Constituents Concerns About Safety of Perry Nuclear Power Plant Re Two Pin Hole Fuel Leaks Found & Requests NRC Hold Hearing on Matter as Soon as Possible)
  • ML20235X557  + (Discusses Constituents Feelings on Emergency Planning for Facility.Majority of People,Including Police,Fire & Civil Defense Officials Do Not Believe Evacuation Possible in Radiological Emergency)
  • ML19274E973  + (Discusses Constituents Support of MP Oncavage Request for NRC to Hold Public Hearings on Planned Steam Generator Repairs)
  • ML20210R870  + (Discusses Construction & Operation of Proposed Claiborne Enrichment Ctr in Claiborne Parrish,To Enrich U for Conversion Into Nuclear Fuel)
  • ML20206A245  + (Discusses Consultant Rept for 880721 ACRS Thermal-Hydraulic Subcommittee Meeting.Two Major Issues Re B&W Discussed During Meeting Included Sys Effects Test Programs & once- Through Steam Generator follow-on Program Results)
  • ML20137W944  + (Discusses Consultation W/K Mossman Re MG Ratner to NRC Concerning Ratner & Schiller Vs GE 2.206 Proceeding)
  • ML20136C033  + (Discusses Contacts Re Proposed Emergency Planning Rule Change)
  • RBG-38074, Discusses Containment Access Mgt Program,Per NRC & Se,Consisting of Description of Current Methods for Limiting Containment Access.Requests That NRC Revise SE to Reflect Info in Ltr & in May 1984 SER  + (Discusses Containment Access Mgt Program,Per NRC & Se,Consisting of Description of Current Methods for Limiting Containment Access.Requests That NRC Revise SE to Reflect Info in Ltr & in May 1984 SER)
  • ML19329D743  + (Discusses Containment Dome Repairs & Requests NRC Participation in 760820 Visual Insp of Remaining Concrete Upper Surface)
  • ML20128G372  + (Discusses Containment High Range Radiation Monitor)
  • ML17219A328  + (Discusses Containment Integrated Leak Rate Testing.To Date, Util Has Conducted Only 24 H Duration Integrated Leak Rate Tests (Ilrt),But May Elect to Conduct Reduced Duration ILRTs to Satisfy Tech Spec for Type a Leak Rate Testing)
  • ML20235N925  + (Discusses Containment Integrated Leak Rate Test (Cilrt) Schedule,Per Failed May 1987 Test Noted in Insp Rept 50-325/87-15.Util Will Maintain Current Cilrt Interval of 40 +/- 10 Months Unless Two Successive Failures Occur)
  • ML18152A884  + (Discusses Containment Integrated Leakage Rate Testing Mass Point Method for Type a Testing,Per Recent Proposed Rule Change Issued for Comment.Util Commits to Conducting Test for Min 24 H)
  • ML20058C007  + (Discusses Containment Integrity Valve Indication on 901020, Per Reg Guide 1.97.Caused by Failed Diode)
  • TXX-4088, Discusses Containment Isolation Valve Leak Rate Testing. Containment Atmosphere Leakage Through Steam Packing Improbable,Since Affected Line Retains Large Vol of Water as Water Seal Following Postulated Break  + (Discusses Containment Isolation Valve Leak Rate Testing. Containment Atmosphere Leakage Through Steam Packing Improbable,Since Affected Line Retains Large Vol of Water as Water Seal Following Postulated Break)
  • ML20246P029  + (Discusses Containment Issue for Modular Htgr.More in-depth Evaluation of Differences Between Commercial Modular HTGR & New Production Reactor Version of Modular HTGR Required Before Course of Action on Containment Can Be Recommended)
  • ML19209C261  + (Discusses Containment Margins in Ice Condenser Plants.Peak Pressures in Proposed Plant Are Double Capability of Containment Design.Knowledgeable Groups Should Review Problem)
  • ML20126C506  + (Discusses Containment Purge & Vent Valve Mods.Table Listing Valve Mods Confirmed as Complete as-left Valve Orientation & New Max Open Position Provided.Modified Valves Will Be Operated Per New Opening Limitations)
  • ML20002D582  + (Discusses Containment Purge Valve Operability at Facility, Including Use of Solenoid Valves & Air Actuators.Interim Use of Solenoid Valves Is Acceptable.Actuator Seal Kits Will Be Replaced on Regular Basis)
  • ML19253B006  + (Discusses Containment Purge Valve Operations.Notifies of Potential Mods to Ensure That Valves Will Close Against Containment Pressure Transients.Consultants Will Conduct Studies & Analyses of Potential Mods)
  • NRC-89-0206, Discusses Containment Purge Valves Operability Re Meeting Requirements of TMI Item II.E.4.2,NUREG-0737.Tripper Fingers & Pins Removed from Valves Found W/Problems Leaving Them in Motor Mode of Operation at All Times  + (Discusses Containment Purge Valves Operability Re Meeting Requirements of TMI Item II.E.4.2,NUREG-0737.Tripper Fingers & Pins Removed from Valves Found W/Problems Leaving Them in Motor Mode of Operation at All Times)
  • ML19254E216  + (Discusses Containment Purging During Operation.Util Is Satisfied W/Bases for Proposed Tech Specs to Limit Purging During Operation to No More than 90-h/yr)
  • ML18153C457  + (Discusses Containment Spray Sys at Plants,Per 840131 Response to Reg Guide 1.97)
  • ML19199A502  + (Discusses Containment Sys Branch Comments Re Suppl 2 to SER on Containment Spray Pump Net Positive Suction Head & Proposed Use of Containment Purge Sys)
  • ML20133A866  + (Discusses Containment Sys Branch Comments & Recommended Mods to Tech Specs Section 3/4.6.Surveillance Requirement Section 4.6.1.2 & Limiting Condition for Operation 3.6.1.9 Should Be Modified)
  • ML19276B571  + (Discusses Containment Sys Branch Input Re Assessment of Tech Spec Problem Sheets.No Items Identified Require Resolution Prior to Authorizing Full Power Operation)
  • ML19208A325  + (Discusses Containment Sys Branch Review of Containment Isolation Provisions for Tmi.Applications Being Reviewed Have Diversity in Containment Isolation Signals)
  • ML20214G937  + (Discusses Containment Sys Branch Review of Application for License,Including Concerns Re LOCA Pool dynamics,safety- Relief Pool Dynamic Loads & Recombiners.Addl Info Re Concerns Will Be Submitted by Util by Jan 1979)
  • ML20094E093  + (Discusses Containment Temp TS Surveillance Requirement 4.6.1.5.1 & 2 Implementing Surveillance Test Procedure)
  • ML17058A807  + (Discusses Containment Vent & Purge Isolation Valve Resilient Seal Matl Performance at Facility.Current App J Requirements for Testing Vent/Purge Isolation Valves Sufficient W/O Need for Increased Frequency Testing)
  • ML20082J086  + (Discusses Containment Vessel Sump Results Found on 910620 During Second Quarter Insp at Facility.Results Indicated That Activity Concentration of Sr-90 & Cs-137 Exceeded 10CFR20,App B,Table Ii,Column 2)
  • ML19289G105  + (Discusses Containment in-leakage Rate.Average Pressure Decay Is .08% Per Day)
  • ML20133N345  + (Discusses Contaminated Site in Los Angeles)