Discusses Containment Integrated Leakage Rate Testing Mass Point Method for Type a Testing,Per Recent Proposed Rule Change Issued for Comment.Util Commits to Conducting Test for Min 24 H
ML18152A884
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/08/1988
From: Cruden D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
88-005A, 88-5A, NUDOCS 8804260003
Download: ML18152A884 (1)


Text

i:. . . . . . . .

~~* ...

    • ~-~

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 8, 1988 U.S. Nuclear Regulatory Commission Serial No. 88-005A Attention: Document Control Desk NO/ETS:vlh Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 CONTAINMENT INTEGRATED LEAKAGE RATE TESTING MASS POINT METHOD FOR TYPE A TESTING A recent proposed rule change issued for comment ( 53FR5985, dated February 29, 1988) would allow the use of the mass-point method, described in ANSI 56.8-1987, for containment integrated leakage rate testing provided that the test was conducted for a minimum of twenty-four (24) hours.

Based on our review of the proposed rule Virginia Electric and Power Company proposes to update the standard referenced in our Technical Specification change and exemption requests dated March 1, 1988 (Serial No.88-005) from the ANSI 56.8-1981 (draft) to the NRC accepted January 20, 1987 revision. The mass-point method described in the 1981 draft and the 1987 revision are very similar. The 1987 revision provides clarification of definitions and terminology. In addition, when performing our Type A tests using the mass-point method for leakage rate calculation, we commit to conduct the test for a minimum of twenty-four (24) hours.

If you have any questions please do not hesitate to call.

cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate II-2