Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19338C200 + (Discusses Commission Conclusions Re Prof Misconduct Charges Before Special Board.Case Should Be Tried Before Outside Board,If Settlement Cannot Be Reached Before Special Board)
- ML20154J929 + (Discusses Commission Consideration in Entering Into MOU W/ Epa,Setting Forth Approach to Apply in Comprehensive Environ Response Compensation & Liability Act of 1980)
- ML19332D820 + (Discusses Commission Decision Re Scope of 870601 Agreement 274b Between Commission & State of Il)
- ML20059D421 + (Discusses Commission Decision on AEC-R 8/3 Authority to AEC to Require Licensees to Provide Medical Care)
- ML20052G923 + (Discusses Commission Failure to Accept Proposal for Relaxing Frequency of State & Local Exercises.Public Reaction to Such Relaxation Would Be Useful W/O Waiting Another Yr.Fema Will Continue to Promote Relaxed Frequency of Exercises)
- IA-87-300, Discusses Commission Guidance on NRC Review of Nas Rept, Revitalizing Nuclear Safety Research. Commission Should Ask Staff to Carry Out Each Recommendation & Rept Back to Commission If Elements Cannot Be Carried Out + (Discusses Commission Guidance on NRC Review of Nas Rept, Revitalizing Nuclear Safety Research. Commission Should Ask Staff to Carry Out Each Recommendation & Rept Back to Commission If Elements Cannot Be Carried Out)
- ML20245A580 + (Discusses Commission Guidance on NRC Review of Nas Rept, Revitalizing Nuclear Safety Research. Commission Should Ask Staff to Carry Out Each Recommendation & Rept Back to Commission If Elements Cannot Be Carried Out)
- ML20151Z516 + (Discusses Commission Inaction on Issuance of Regulations Establishing Fitness for Duty Requirements at Nuclear Power Plants.Failure by Commission to Act & Put Into Place Programs Places Public Health & Safety at Unnecessary Risk)
- CLI-94-05, Discusses Commission Order,CLI-94-05,affirming in Part & Reversing in Part LBP-94-06 Re Release of OI Rept + (Discusses Commission Order,CLI-94-05,affirming in Part & Reversing in Part LBP-94-06 Re Release of OI Rept)
- ML20128F447 + (Discusses Commission Order,CLI-94-05,affirming in Part & Reversing in Part LBP-94-06 Re Release of OI Rept)
- ML20153F023 + (Discusses Commission Paper on Integrated Approach to Implementing Commission Policy on Severe Accidents.List of Activities & Questions/Issues Associated W/Each Encl)
- ML20033C718 + (Discusses Commission Practice Re Recovery of Review Costs. Project Review Completed 801222.Balance Due for Review of CP Application,Withdrawn 800911)
- ML20055F882 + (Discusses Commission Recommendations Re Development of Addl Proposed Rule on Plant Maint & Procedural Appproaches to Implementing Maint Rule Along Lines Set Forth in Encls)
- ML20207A660 + (Discusses Commission Request That Staff Implement Commission Decisions with Accountability,Clarity & Consistency)
- ML20203N946 + (Discusses Commission Review of .Institution of Proceeding to Determine Whether Facility OL Should Be Suspended Unwarranted.Earlier Suspension Requests Under Review.Served on 861015)
- ML20134L505 + (Discusses Commission Review of Draft Presidential Message & Suggest Rewording of Paragraph Page 9 Re Acceleration of Nuclear Plant Construction Time)
- ML20132D025 + (Discusses Commission Review of Union Carbide Corp Application to Transfer Sterling Forest License R-81 to Medi-Physics.Author Intends to File Petition for Leave to Intervene in Proceeding within Next 10 Days)
- ML19294B924 + (Discusses Commission Role in Decisions Involving Policy Considerations.Commissioners Must Make & Be Held Accountable for Major Decisions.Requests That Commission Be Involved in Decision to Permit Resumption of Facility Const)
- ML19323B926 + (Discusses Commission Statement on Reactor Licensing.Forwards List of Elements for Commission Statement.Includes NRC Regulatory Process Objective,Regulations,Stds & Specs)
- ML20153E567 + (Discusses Commission Views on Provision in Senate-passed Price-Anderson Act Extension Which Would Provide for Federal Indemnification of Persons Producing or Using Radiopharms, Per)
- ML20236T646 + (Discusses Commissioner Bernthal Public Comments at Baltimore-Washington Health Physics Meeting on 870422 Re Use of Byproduct Matl & Related Matters.Record of 870408 Telcon Encl.Copyrighted Mddi Repts Publication Not Filmed)
- ML20195B681 + (Discusses Commissioner Carr 871215 Site Visit & Speech. Agenda Encl.W/O Encl)
- ML20138S079 + (Discusses Commissioner Consideration of extra-judicial Info in Decisionmaking Process on License Applications.Options by Which Commissioners Can Receive Info W/O Possible Subsequent Court Challenges Listed)
- ML20149D905 + (Discusses Commissioner KM Carr 880127 Plant Tour.Tour Included Observation of Control Room,Maint Shops,Battery Rooms,Turbine Deck and Diesel Generators.Util Also Briefed Carr on Site Organization and Programs.Served on 880205)
- ML19291A477 + (Discusses Commissioner Kennedy Comments on SECY-77-489 Re Submission of Low Level Waste Implementation Plan.Applicable Sections of SECY-77-489 Encl)
- ML20247Q971 + (Discusses Commissioner Participation in Exercises,Per Request)
- ML19322D257 + (Discusses Commissioner Participation in Power Reactor License Issuance Decisions & Proposed Recommendations to Ensure Adequate Consideration of TMI-related Safety Issues Prior to OL Issuance)
- ML20062M667 + (Discusses Commitment Extension Re NRC Audit Rept of Effectiveness of Licensee Activities on Performance of safety-related Check Valves.Formalization of IST Basis Document Will Be Completed by 940331)
- ML20035B318 + (Discusses Commitment Extension Relative to NRC Audit Rept of Effectiveness of Licensee Activities Re Performance of safety-related Check Valves)
- ML19322B936 + (Discusses Commitment Made by CT Yankee Atomic Power Co & Northeast Nuclear Energy Co to Implement Automatic Initiation of Auxiliary Feedwater.Addresses Util Conclusion That Implementation Not Necessary for Safe Operation)
- ML20077Q447 + (Discusses Commitment Made in 930524 Response to NRC Bulletin 90-001,Suppl 1,to Perform Enhanced Surveillance Program on Appropriate Rosemount Transmitters Covered by NRC Bulletin 90-001.Transmitters Evaluated to Be Operable)
- 05000293/LER-1997-013, Discusses Commitment Made in LER 97-013-00.Deferral of Target Completion Date to 980430 Made.Mod Will Not Be Completed Until Spring 1999 Refueling Outage 12 + (Discusses Commitment Made in LER 97-013-00.Deferral of Target Completion Date to 980430 Made.Mod Will Not Be Completed Until Spring 1999 Refueling Outage 12)
- ML18044A615 + (Discusses Commitment Made in Response to IE Bulletin 79-08. Measurements Taken on 791002 Indicate That Fuel Element Transfer Tube Shielding Effectively Precludes Any Appreciable Radiation Hazard)
- L-83-138, Discusses Commitment Re Fragmentation of Cladding Embrittlement,Per 830303 Meeting.Results of ECCS Analysis Encl.Info Previously Discussed in Section 4.2.3(a) of SER (NUREG-0843) + (Discusses Commitment Re Fragmentation of Cladding Embrittlement,Per 830303 Meeting.Results of ECCS Analysis Encl.Info Previously Discussed in Section 4.2.3(a) of SER (NUREG-0843))
- ML19323B217 + (Discusses Commitment Re Implementation of Wire Cloth Sieve Calibr Verification Procedure,In Response to NRC 800417-20 Insp.Further Investigation Revealed That Periodic Test Sieve Recertification Not Required)
- B16888, Discusses Commitment Re Readiness for NRC 40500 Insp, Effectiveness of Licensee Contols in Identifying,Resolving & Preventing Problems. Completed Assessments of Elements Associated W/Insp Scope & Projected Readiness for 970105 + (Discusses Commitment Re Readiness for NRC 40500 Insp, Effectiveness of Licensee Contols in Identifying,Resolving & Preventing Problems. Completed Assessments of Elements Associated W/Insp Scope & Projected Readiness for 970105)
- ML19248D022 + (Discusses Commitment Resulting from 790629 Meeting W/Nrc in Bethesda,Md.Util Committed to Increased Surveillance Program to Aid in Determining Failure Mode Associated W/Pressure Switches)
- 05000302/LER-1979-005-01, Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Nec + (Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Necessary)
- ML20096A289 + (Discusses Commitment in NRC SER Re Fire Protection Program That Requires Use of Fire Retardant Intumescent Coating on All Polyurethane Foam Piping Insulation in Areas Containing safety-related Equipment.Combination of Matls Superior)
- ML19210E391 + (Discusses Commitment to Certain Programs Upon Return to Power for Cycle 8:2.Primary-to-secondary Hydrostatic Tests & Eddy Current Examination of Steam Generator Tubes Will Be Performed)
- ML17311A263 + (Discusses Commitment to Demonstrate Major Elements of Emergency Plan on Periodic Basis)
- ML14133A353 + (Discusses Commitment to Develop Program Re Potential Reactor Vessel Integrity Concerns Identified in NRC . Program Will Identify Whether Future Addl Plant Specific Analyses &/Or Remedial Actions Will Be Required)
- ML20003A575 + (Discusses Commitment to Expand Seismic Monitoring Program. Seismic Monitoring Network at Monticello Reservoir Will Continue Operation.Program Commitments Will Be Incorporated in Next Amend to FSAR)
- ML19326E228 + (Discusses Commitment to Install Containment Hydrogen Monitor by 810101.Describes Compliance W/Nrc .Sys Will Be Composed of Bendix Analyzer & Comsip,Inc,Model K-III Thermal Conductivity Analyzer)
- ML17256B042 + (Discusses Commitment to Install Environmentally Qualified Items by 820630.Several Solenoid Valves & Resistance Temp Detectors Could Not Be Completed During Current Outage,But Will Be Installed During Spring 1983)
- ML19262C222 + (Discusses Commitment to Install Recirculation Pump Trip Sys. Sys Has Been Integrated W/Extensive Instrumentation Upgrade. Completion Is Delayed Until After 801010 Because of Equipment Unavailability)
- ML19309B071 + (Discusses Commitment to Installation During Aug-Sept 1978 Refueling Outage of Second Level Voltage Protection Sys for Nuclear Svc Buses W/Coincident Logic Per NRC)
- HNP-98-082, Discusses Commitment to Joint Owners Group Program,MPR-1807, Rev 2 Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs + (Discusses Commitment to Joint Owners Group Program,MPR-1807, Rev 2 Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs)
- ML20012A353 + (Discusses Commitment to Notify NRC of Significant Deviations to Corrective Action Plan Resulting from Employee Concerns Special Program.Corrective Action Plan Revised to Provide Means for long-term Control of Issues Via New Procedures)
- U-600633, Discusses Commitment to Perform CRD Sys Vessel Inventory Makeup Rate Test,Per NUREG-0619, BWR Feedwater Nozzle & CRD Return Line Nozzle Cracking & IE Open Item 85-15-01.FSAR Will Be Amended,Since Test No Longer Required + (Discusses Commitment to Perform CRD Sys Vessel Inventory Makeup Rate Test,Per NUREG-0619, BWR Feedwater Nozzle & CRD Return Line Nozzle Cracking & IE Open Item 85-15-01.FSAR Will Be Amended,Since Test No Longer Required)
- ML19224C342 + (Discusses Commitment to Provide Alternate Means of Supplying Water to Yard Loop.Decision Made to Provide 300,000 Gal Tank & Pump to Provide Fire Protection Sys Water Demand)