ML17311A263

From kanterella
Jump to navigation Jump to search
Discusses Commitment to Demonstrate Major Elements of Emergency Plan on Periodic Basis
ML17311A263
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/01/1994
From: Simpson B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03101-ECS-A, 102-3101-ECS-A, NUDOCS 9409160108
Download: ML17311A263 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409160108 DOC.DATE: 94/09/01 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 p

AUTH.NAME AUTHOR AFFILIATION SIMPSON,B.C.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Discusses commitment to demonstrate major elements of'mergency Plan on periodic basis.

DISTRIBUTION CODE:

A045D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

Emergency Preparedness

Plans, Implement'g Procedures, C

0 NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L INTERNAL: NRR/DRSS/PEPB REG FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME HOLIAN, B NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 05000528 05000529 05000530 T

D 0

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE IIELP US TO REDUCE WASTE! CONTACTTPIE DOCUMENTCONTROL DESK, ROO) I PI-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME'FROM DISTRIBUTIONLISTS I:OR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL IV

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 BERT C. SIMPSON VICE PRESIDENT NUCLEARSUPPORT U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 102-03101-ECS/AKK/R JH September 1, 1994

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units1,2, and 3 Docket Nos. STN 50-528/529/530 1994 Emergency Plan Exercise Objectives File. 94-002-493 94-056-026 Palo Verde Nuclear Generating Station (PVNGS) is committed to demonstrating major elements of its Emergency Plan on a periodic basis.

One of the elements requiring demonstration in 1994 involves an unannounced off-hours activation of Emergency

Response

Facilities within the time frame specified in the PVNGS Emergency Plan.

As a result of the March 14, 1993, Unit 2 ALERT, due to a ruptured steam generator tube and the subsequent Emergency

Response

Facility activation, PVNGS considers the objective adequately demonstrated.

Therefore, it will not be a part of the 1994 Exercise.

Following the ALERT declaration at 0502 on Sunday, March 14, 1993, the Emergency Operations Facility (EOF) and the Technical Support Center (TSC) were staffed and activated in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 40 minutes, and 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 43 minutes respectively.

These activation times meet the current PVNGS Emergency Plan goal of staffing and activating the EOF/TSC within 1-2 hours of event declaration which occurs outside of normal day shift work hours.

Full details of the Steam Generator Tube Rupture (SGTR) event are contained in the NRC Augmented Inspection Team (AIT) Report 50-529/93-1 4.

Immediately following termination of the ALERT, PVNGS conducted a comprehensive detailed analysis and investigation of events that surrounded the SGTR including a detailed critique of emergency preparedness.

Subsequent to the report, Emergency Planning resolved each emergency preparedness deficiency.

The investigation conclusions and corrective action assignments are fully detailed in PVNGS Incident Investigation Report IIR 2-3-0112.

9409160108 940801 PDR ADOCK 05000528 F

FIDR

1 ~

P

'C P

k'

U. S. Nuclear Regulatory Commission ATT'N: Document Control Desk 1994 Emergency Plan Exercise Objectives Page 2 Prior to this event, the State of Arizona and Maricopa County received credit from Federal Emergency Management Agency (FEMA) Region IX for successfully demonstrating unannounced off-hours facility"activation based on their response to the May 4-6, 1992, ALERT at PVNGS.

In discussions held with representatives from the State and County on June 10, 1994, neither organization sees a need to additionally demonstrate their abilityto respond to an unannounced off-hours event'as part of a training exercise during 1994.

Since the State and County participate in each annual Exercise, an objective to conduct an unannounced off-hours activation would result in an unwarranted expenditure of funds to support PVNGS.

In summary, PVNGS considers this objective as successfully demonstrated during the March 14, 1993, ALERT. Therefore, the commitment to demonstrate unannounced off-hours Emergency

Response

Facility activation as one of the major elements of the Emergency Plan has been met.

Should you have any questions, please call Burton Grabo at (602) 393-6492.