l Duke PbwerCornpany J. W.H m tw
- OconeeNuclearSite -
- Vicehesident P.O. Box M39.
(8W)88534990flice V
Seneca SC29679 (803)8853564 Fax
- 2; DUKEPOWER I
January 9, 1995-U.S. Nuclear Regulatory Commission Attention:
Document Control Desk-Washington, DC 20555
Subject:
Oconee Nuclear ~ Station
-Docket Nos. 50-269, -270, -287_
NRC Bulletin 90-01, Supplement 1 Loss of Fill-Oil in Transmitters Manufactured by Rosemount By letter dated _May 24, 1993, Duke Power Company provided-a response' to - Supplement l' of NRC Bulletin 90-01.
In this response, Duke committed to performing.an enhanced surveillance program on the appropriate Rosedount transmitters which were 1
covered by NRC Bulletin 90-01.
This included a surveillance of -
the Standby Shutdown Facility (SSF) Reactor Coolant Pressure transmitter on Oconee Unit--3.
This ' transmitter met the criteria for a surveillance interval of at least once every refueling cycle, not to exceed 24 months.
During the Oconee Unit 3 refueling cycle EOC14, this surveillance was misced due to an administrative oversight.
In addition, the 24 month restriction has been exceeded for this transmitter.
The-transmitter has been evaluated to be operable.and the surveillance will be completed prior to January 31, 1995.
I Very truly yours, i
=
f l
l l
..W.
Hampton, Vice President
/Oconee Nuclear Station
/
cc:
Mr. S. D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Wiens, Project Manager Office of Nuclear Reactor Regulation Mr.
P. E. Harmon, Senior Reaident Inspector Oconee Nuclear Site 9501190262 950109 l.
gDR ADOCK 05000269 PDR
()