Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Constant Pressure Power Uprate - PLA-6174". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • IR 05000445/1986025  + (Const Insp Repts 50-445/86-25 & 50-446/86-21 on 860901-30. No Violation or Deviation Noted.Major Areas Inspected: Previous Insp Findings,Posting of NRC Regulations,Safety Injection Pipe Welding & Fire Protection/Prevention)
  • ML20084L930  + (Const Insps at Midland & Zimmer Nuclear Power Plants, Monthly Progress Rept for Apr 1984)
  • ML18026A367  + (Const Noise Progress Rept, Sound Level Measurements Near Susquehanna Steam Electric Station Site Const 1980)
  • ML19296D430  + (Const Opening Rept, Supp 1 to Steam Generator Repair Rept)
  • ML19259A799  + (Const Permit CPPR-175 & 176 for Facilities Authorizing Applicant to Construct 2 Pressurized Water Nuclear Reactors)
  • ML20127N795  + (Const Permit CPPR-31 for Plant)
  • ML18017A472  + (Const Permit Now Pending Before Commission,Except for Issue of Mgt Capability of Applicant to Design,Operate & Construct Proposed Facility.Forwards Office of Nuclear Reactor Regulation Memo Re Faults at Site)
  • ML20138M970  + (Const Procedure CCP-30,Attachment 2, Rev 1 to Special Coating Procedure M-7, Application of Keeler & Long Epoxy Primer 6548 & Epoxy Enamel Topcoat 7475..., Incorporating Document Change Notice 1)
  • ML20023B396  + (Const Project Evaluation for Catawba Nuclear Station)
  • ML20091G517  + (Const Project Evaluation of CPC Midland Energy Ctr Project Units 1 & 2)
  • ML20094G316  + (Const Project Evaluation of Consumers Power Co,Midland Energy Ctr Project,Units 1 & 2 (Observations))
  • ML20072L774  + (Const Project Evaluation of Millstone Station 3)
  • ML20072L763  + (Const Project Evaluation of Millstone Station 3 (Observations))
  • ML20092N676  + (Const Project Evaluation,Clinton Power Station)
  • ML20078D759  + (Const QA Program for River Bend Station)
  • ML20126H603  + (Const Self Assessment Corrective Action Evaluation)
  • ML20215N337  + (Const Spec N2E-860, Installing Electrical Conduit Sys & Conduit Boxes)
  • ML18044A376  + (Const Specs for Inside Containment Portion of Pressurizer Relief Valve Position Indication Sys)
  • ML19256G566  + (Const Specs for Inside Containment Portion of Steam Drum Safety Relief Valve Position Indication Sys)
  • ML19256G570  + (Const Specs for Outside Containment Portion of Steam Drum Safety Relief Valve Position Indication Sys)
  • ML18044A374  + (Const Specs for Outside Containment Portion of Pressurizer Relief Valve Position Indication Sys)
  • ML20235K631  + (Const Team Insp Rept 50-353/87-11 on 870622-0702.Violations Noted.Major Areas Inspected:Hpci & Core Spray Sys & Const Practices on safety-related Piping & Equipment in Drywell, Reactor Bldg,Control Room & Diesel Generator Bldgs)
  • ML20137Z900  + (Const Team Insp Rept 50-443/85-15 on 850603-14.Violations Noted:Seismic Installation of Instrument Tubes Crossing Seismic Boundary Not Translated Into Spec & Control of quality-related Activities Inadequate)
  • ML20071A206  + (Const/Startup Progress Rept for Jan 1983)
  • ML20080N069  + (Constant Extension Rate Testing of SA302 Grade B Material in Neutral and Chloride Solutions)