ML24257A161

From kanterella
Jump to navigation Jump to search
Constellation Energy Generation Form 311
ML24257A161
Person / Time
Site: 07100008
Issue date: 09/18/2024
From: Hector Rodriguez-Luccioni
NRC/NMSS/DFM/IOB
To:
Constellation Energy Generation, Constellation Nuclear
Shared Package
ML24257A159 List:
References
Download: ML24257A161 (1)


Text

NRC FORM 311 (10-2019) U.S. NUCLEAR REGULATORY COMMISSION 1. APPROVAL NUMBER 0008 QUALITY ASSURANCE PROGRAM APPROVAL FOR RADIOACTIVE MATERIAL PACKAGES REVISION NUMBER 15 Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and Title 10, Code of Federal Regulations, Chapter 1, Part 71, and in reliance on statements and representations heretofore made in Item 4 by the organization named in Item 2, the Quality Assurance Program identified in Item 4 is hereby approved. This approval is issued to satisfy the requirements of Section 71.101 of 10 CFR Part 71. This approval is subject to all applicable rules, regulations, and orders of the Nuclear Regulatory Commission now or hereafter in effect and to any conditions specified below.

2. NAME Constellation Energy Generation, LLC STREET ADDRESS 4300 Winfield Road CITY WarrenvilleSTATE ZIP CODE 3. DOCKET NUMBER
4. QUALITY ASSURANCE PROGRAM APPLICATION DATE(S) IL 60555 71-0008 Feb 19, 2004; April 24, 2006; Sep 20, 2006; Jan 22, 2007; Feb 17, 2016; and April 6, 2017;
5. CONDITIONS 1.Activities conducted with regard to transportation packagings under applicable criteria of Appendix B to 10 CFR Part 50 authorized by this approval: procurement, maintenance, repair, and use. All other activities (i.e.,

design, fabrication, assembly, testing, and modification) shall be satisfied by obtaining certifications from packaging suppliers that these activities were conducted in accordance with an NRG-approved Quality Assurance Program. It shall remain the responsibility of the Quality Assurance Program holder that all transportation activities meet the requirements of 10 CFR 71.101.

2.Records shall be maintained in accordance with the provisions of 10 CFR Part 71. Specifically:

a.Records of each shipment of licensed material shall be maintained for 3 years after that shipment

[10 CFR 71.91 (a)].

b.Records providing evidence of packaging quality shall be maintained for 3 years after the life of the packaging [10 CFR 71.91(d)].

c.Records describing activities affecting packaging quality shall be maintained for 3 years after this Quality Assurance Program Approval is terminated [10 CFR 71.135].

3.Planned and periodic audits of all aspects of the Quality Assurance Program shall be conducted in accordance with written procedures or checklists, by appropriately trained personnel not having direct responsibility in the areas being audited, in accordance with 10 CFR 71.137.

4.This approval is applicable at the following locations:

Braidwood Station (Units 1 and 2) Limerick Generating Station (Units 1 and 2) lt/1Byron Station (Units 1 and 2) Nine Mile Point Nuclear Station (Units 1 and 2)

Calvert Cliffs Nuclear Power Plant (Units 1 and 2) Peach Bottom Atomic Power Station (Units 1, 2, and 3)

Clinton Power Station (Unit 1) Quad Cities Nuclear Power Station (Units 1 and 2)

Dresden Nuclear Power Station (Units 1, 2, and 3) RE. Ginna Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant Three Mile Island Nuclear Station (Unit 1)

LaSalle County Station (Units 1 and 2)

FOR THE U.S. NUCLEAR REGULATORY COMMISSION SIGNATURE Hector Rodriguez INSPECTION AND OVERSIGHT BRANCH DIVISION OF FUEL MANAGEMENT OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS NRG FORM 311 (10-2019) DATE September 18, 2024

, Chief