Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML040250070 + (Confirmatory Survey of Portions of the Heritage Minerals, Inc., Facility, Lakehurst, Nj, Phase 2)
- ML20081B594 + (Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny)
- ML20198S698 + (Confirmatory Survey of Specialty Fuels Bldg Exxon Nuclear Co Richland,Wa, Final Rept)
- ML20056H510 + (Confirmatory Survey of Turbine Internal Components Shoreham Nuclear Power Station Brookhaven,Ny, Final Rept)
- ML20056H444 + (Confirmatory Survey of Univ of Kansas Lawrence,Ks, Final Rept)
- ML20056H439 + (Confirmatory Survey of Univ of Texas Triga Reactor Austin, Tx, Final Rept)
- ML20126B133 + (Confirmatory Survey of Us Nuclear,Inc, Final Rept)
- ML051290457 + (Confirmatory Testing Investigating Advanced Plant Thermal-Hydraulics)
- ML19317F634 + (Confirmatory Testing of Fire Retardant Seals for Electrical Penetrations Through Fire Barriers Installed at Facility)
- ML20215C687 + (Confirmatory Vessel Water Level Drop Tests (Lst 86-183))
- ML052660359 + (Confirmatory and In-Process Inspection Surveys of Remaining Land Areas Maine Yankee Atomic Power Company, Wiscasset, Maine, Final Report, June 2005)
- ENS 48446 + (Confirmed Positive Fitness for Duty)
- ENS 57983 + (Confirmed Positive Fitness for Duty (FFD) Test)
- ENS 48172 + (Confirmed Positive Fitness for Duty Test)
- ENS 48192 + (Confirmed Positive Fitness for Duty Test)
- ENS 48262 + (Confirmed Positive Fitness for Duty Test)
- ENS 48383 + (Confirmed Positive Fitness for Duty Test)
- ENS 48418 + (Confirmed Positive Fitness for Duty Test)
- ENS 48419 + (Confirmed Positive Fitness for Duty Test)
- ENS 41336 + (Confirmed Positive Fitness for Duty Test)
- ENS 45305 + (Confirmed Positive Fitness for Duty Test by Non-Licensed Supervisor)
- ENS 41342 + (Confirmed Positive Fitness for Duty Test of Licensed Operator)
- ENS 41285 + (Confirmed Positive Fitness for Duty Test of a Licensed Supervisor)
- ENS 43931 + (Confirmed Positive Fitness for Duty Test on a Contract Supervisor)
- ENS 49321 + (Confirmed Positive Fitness-For-Duty Test)
- ENS 50809 + (Confirmed Positive Test for Controlled Substance)
- ENS 46549 + (Confirmed Positive Test for Illegal Drug)
- ENS 48158 + (Confirmed Positive on a Fitness for Duty Test)
- ENS 48136 + (Confirmed Positive on a Fitness for Duty Test)
- ML19093B049 + (Confirming & Elaborating Information Provided on 2/8/1978 Regarding Fracture Toughness of Unit 1 Reactor Vessel & Surveillance Program to Monitor Irradiation Effects Upon Material Properties)
- ML110630532 + (Confirming Category 1 Public Meeting Scheduled for 03/24/11 Regarding Annual Assessment of H.B Robinson Steam Electric Plant)
- ML19029A560 + (Confirming Discussions to Effect That Public Advocate Has Not Identified Any Potential Witness in Salem Unit 1 Proceeding)
- ML18227D418 + (Confirming FPLs Request to NRCs Allowance of Continue Operation of Unit 4 Until Unit 3 Can Be Returned to Service or Until Unit 4 Steam Generator Tube Leakage Exceeds 0.35 Gpm)
- ML18219E016 + (Confirming Functioning Coordinator at Local Public Document Room Who Assists Librarian & Assess Current Status of Files)
- ML16200A347 + (Confirming Initial License Exam at Quad Cities in April 2016)
- ML20027C557 + (Confirming Order Canceling 821014 Prehearing Conference in Rockford,Il.Discovery Progress Discussed During 821014 Telcon)
- ML19326A837 + (Confirming Order Re Time Allowed for Filing Documents After 710212 Closing of Record.Provides Schedule.Certificate of Svc Encl)
- ML18142B224 + (Confirming Phone Call on 7/13/1977 to Report Reportable Occurrence 77-11)
- ML18142B223 + (Confirming Phone Call on 7/14/1977 to Report Supplemental Information Regarding Reportable Occurrence 77-10)
- ML18219D820 + (Confirming Phone Conversations of 4/20/1978, Informing Changes in Electrical Equipment to Be Made During Current Outages)
- ML18219D843 + (Confirming Phone Report of 1/21/1978, Analysis of Chlorine Residual of Circulating Water Discharge Was 0.12 Ppm. Will Submit Complete Report by 1/27/1978)
- ML19029A655 + (Confirming Receipt of Request for Formal Adjudicatory Hearing or Petition for Leave to Intervene, & Advising Further Written Response from Licensee Will Not Be Necessary)
- ML18219E018 + (Confirming Report on 5/11/1976 Re Experiencing Unusual Quadrant Power Tilt Ratios, Preliminary Indicates Portion of One Control Rod Has Not Moved with Remainder of Control Rod)
- ML19030A720 + (Confirming Submission Date of Annual Certified Financial Statements & Cash Flow Projections Has Been Changed from 3/1 to 3/15, Per NRC Request)
- ML19225B573 + (Confirming Telephone Conversation Concerning an Abnormal Occurrence Involving Total Chlorine Residual at the Condenser Outlet Exceeding the 0.10 Ppm Limit)
- ML19098B310 + (Confirming VEPCO Has Agreed to Perform Test to Measure Power Peaking Factors During Load Follow Maneuver on Surry 2 on 6/9-10/1975)
- ML19098B307 + (Confirming VEPCOs Plan to Conduct Large Load Reduction Test on Unit 2, on Tentative Date of 8/2/1975, as Discussed in Meeting of 7/9/1975)
- ML18219E022 + (Confirming Verbal Report of 4/16/1976 Re Problem of Inoperable Hydraulic Snubbers in Safety Related Systems)
- ML18219E021 + (Confirming Verbal Report of 4/22/1976 Re Auxiliary Feed Water VMO-2ll Found to Be Installed with Flow in Wrong Direction)
- ML18219D832 + (Confirming Verbal Report on 2/23/1978, Concerning Both Engineered Safeguard Fans Were Inoperable for a Period of 3 Hours & 14 Minutes)