ML18219E018

From kanterella
Jump to navigation Jump to search
Confirming Report on 5/11/1976 Re Experiencing Unusual Quadrant Power Tilt Ratios, Preliminary Indicates Portion of One Control Rod Has Not Moved with Remainder of Control Rod
ML18219E018
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/12/1976
From: Jurgensen R
American Electric Power Company, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/RGN-III
References
Download: ML18219E018 (7)


Text

J G KEPPLER

INDIAN 5, MICH POWER CO HRIDGMANp MICH R W JURGENSEN NRC FORM 195 U.S. NUCLEAR BEGULATOBVC IISS ION I2-7GI NRC DISTRIBUTION FGR PART 50 DOCI(ET MATERIAL DOCI'ET NUMBER o-S>S FILE NUMBER INCXDHNT REPORT DATE OF DOCUMENT 5-L~- l4

'ATE RECEIVED LETTER DORIGINAL g4"OP V DE S C R IP TI0 N C3NOTORIZED gA5ACL ASS IF I E D PROP INPUT I'OBM ENCLOSURE NUMBER OF COPIES RECEIVED AonC Si nab LTR ADVISING A FORMAL RPT WILL BE SUBMITTED

'LT 5-25-76 OF THE INVESTXGATION CONDUCTED

WHEREBY'HEY.'ERE'XPERIENCING UNUSUAL QUADRANT POWER TILT RATIOS...........

g>2g QP p

<&g fg&

,IIQ~

~Gp-~

PLANT NA1K: C omg 4g'OTE:

IF PERSONNEL EXPOSURE IS XNVOLVHD SEND DIRECTLY TO KREGER/J.

COLLINS SAFETY BRANCH CHIEF:

W 3 CYS FOR ACTXON LXC. ASST:

W/

CYS ACRS l CYS HOLDING/ HNT TO LA FOR ACTION/INFORMATION ENVIRO

4

~F(~FLH XRE 2

r SCHROHDHR/XPPOLITO V

~NOVAK CHECK

<i.U&<&&&&'&&<&&

INTERNAL0 ISTR I BUTION

~TEDEHC tlACCAKY F~

BAER r

SHAO VOT LM~ER BUSH

~IC H~H~OU NS LPDR:Q+~q~E.PQ~

TXC NSXC EXTERNAL0ISTRIBUTION CONTROL NUMBER pygmy'Bl.

l ABM 1<If& I9-7BI

/

r()

I c,

I*','orscosmos wo'zv, P

4 r,

e. ra~.n r '

~

rr-

~ ~ 4 I ~

~

~

~

~

~

~

g ~

s

~fsserloan gr

~ectrlo IIIIDIAPIA5 PAICIIIGAIlfPD~ifER CDfhPAfilY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106

, cQ',

May 12, 1976 Mr. J.G.

Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III s)

'1 IJ/J 799 Roosevelt Road "4~

Glen Ellyn, IL

.60137

<<IYEO

)~

Operating License DPR-58

~1',,

IGG;Cfg ocket No. 50-315

<ctIOD c>>

Dear Mr. Keppler:

Thi's letter is to 'confirm our verb8-p t to NRC RO: III Inspector, Mr.

K. R. Baker, at approximately 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> on May ll, 1976.

At that time we reported that we were experiencing unusual quadrant Power Tilt Ratios.

Preliminary indications are that a portion of one control rod has not moved with the remainder of the control rod.

We are continuing our investigation and will submit a formal report by May 25,

1976, as requi red by Regulatory Guide
1. 16, Revision 4, Section 2.a.

Sincerely,

/

.W. J e

en Plant anager

/bab cc:

R.S.

Hunter R. Kilburn J.E.

Dolan

'.E.

Lien R.J.

Yollen BPI R.C. Callen MPSC K.R. Baker RO:III P.W. Steketee, Esq.

R. Walsh, Esq.

G. Charnoff, Esq

~

G.

Olson J.M. Hennigan PNSRC R.S.

Keith Dir., IE (40 copies)

Dir., MIPC (4 copies)

Docket @os.

50-315 and 50-316 Indiana

& Michigan Electric Company Indiana

& Michigan Power Company ATTN:

Hr. John Tillinghast Vice President P. 0.

Box 18 Howling Green Station Hew York, New York 10004 MAY go 197'Distribution NRC PDR Local PDR Docket File LWR 82 File OELD IE (3)

EPM EPLA JCollins ACRS (16)

FWilliams JRBuchanan, NSIC TBAbernathy, TIC

.MService RBenedict Gentlemen:

RE:

Donald C. Cook Units Hos.

1 and

'2 In our letter to you. of February 23, 1976, providing guidance on implementin~

the requirements of Appendix I to 10 CFR Part 50, we indicated that the staff was preparing additional guidance regarding the formulation of Technical Specifications to implement Section V.B.2 of Appendix I".

In this regard we have attached guidance on the preparation of your proposed Technical Specifications.

It should be noted that these draft Technical Specifications will require modification to incorporate plant specific information.

Additionally, due to the draft nature of these Technical Specifications there are certain areas which have already been identified by the staff for further study and possible modification.

These areas are listed in the "Forward" to the attached "Draft Model Technical Specifications".

We would be pleased to meet with you after the June 4,

1976 submittal date to discuss your methods of evaluation to show conformance with Appendix I and your proposed Technical Specifications for the purpose of keeping releases of radioactive materials in effluents as low as reasonably achievable.

Sincerely, Original signe<l by K. I<niel Karl Kniel, Chief Light Water Reactors Brancn Mo.

2 Division of Project Management

. QgQt Model Technic for Fi'e's's'u'i'ice cT'Ti QUIINANC~

DATC~

L Specificat ter Tceactors ons IIOno hEC 518 (Rrr. 9.93) AXCM0240 Q U, 5, OOII'CIINHCNTPIUNTINO OCCICCI 1074 OCO ICC

'I it

(>>-'X ~'K't I

tft "f

tt 1

P Ks X

<<, ":i a

J' I

Indiana

& nichiren Electric Company cco Hr. Robert Hunter Vice President American Electric Power Service Corporation 2 Broadway New York, New York 10004 Gerald Charnoff, Esq.

Shaw, Pittman, Potts 6 Trowbridge 910 17th Street, N. M.

washington, D. C.

20006

'Businessmen for the Public Interest Suite 1001 109 North Dearborn Street Chicago, Illinois 60602 OPPICL~

SURNAMC~

OATS~

PM: LlJR MSe

, 5/,10

sjh PM: LWR¹P RBenediht 5/iO/76 PM:LWR¹ KKniel 5//Q(76 Porm ARC-318 (RcT. 9 f3) hZCM 0240 Q U, $ OOVIKRNMCNTPRINTINS OPFICCI IST4 ddd 144

~

4I Il

. I I'

t 1

ÃI f'ZL A