ML19098B310

From kanterella
Jump to navigation Jump to search
Confirming VEPCO Has Agreed to Perform Test to Measure Power Peaking Factors During Load Follow Maneuver on Surry 2 on 6/9-10/1975
ML19098B310
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/26/1975
From: Ragone S, Stallings C
Virginia Electric & Power Co (VEPCO)
To: Purple R
Office of Nuclear Reactor Regulation
References
Serial No. 582
Download: ML19098B310 (1)


Text

Vepco Mr. R. A. Purple, Chief Operating Reactors Branch Division of Reactor Licensing tR~guJ~tory.Docket.. EilQ

  • -*---4-*--

-..______ --~--**;*.. __;u.~

VIRGINIA ELECTRIC AND POWER COMPANY, RICHMOND, VIRGINIA 23261 June 26, 1975 Serial No.

FR/JTR:ngg Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Docket Nos. ¢0-2@>

50-281 License Nos. DPR-32 DPR-37

Dear Mr. Purple:

This is to confirm that Vepco has agreed to perform a test to measure power peaking factors during a load follow maneuver on Surry Unit 2, as discussed with Dr. J. T. Rhodes (Vepco) by Messrs. P. S. Check and M. S. Dunenfeld (NRC) on June 9 and 10, 1975.

The details of the up-coming test, along with Vepco experience in performing such tests in the past, will be discussed with the NRC Staff on Wednesday, July 9, 1975, at 10:00 a.m. in Bethesda, Maryland.

If you have any questions or comments, please contact us.

/::.

and ings Presi

-Power Supply Production Operations 6881