ML18227D418

From kanterella
Jump to navigation Jump to search
Confirming FPLs Request to NRCs Allowance of Continue Operation of Unit 4 Until Unit 3 Can Be Returned to Service or Until Unit 4 Steam Generator Tube Leakage Exceeds 0.35 Gpm
ML18227D418
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/14/1978
From: Robert E. Uhrig
Florida Power & Light Co
To: Case E
Office of Nuclear Reactor Regulation
References
L-78-54
Download: ML18227D418 (7)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>

DISTRIBUTION FOR INCOMING MATERIAL 50-251 REC:

CASE E G

ORG:

UHRIG R E DOCDATE: 02/14/78 NRC FL PWR 5 LIGHT DATE RCVD: 02/22/78 DOCTYPE:

LETTER NOTARIZED:

YES COPIES RECEIVED

SUBJECT:

LTR 3 ENCL 0 CONFIRMING REQUESTS FROM MESSRS.

UHRIG

8. PEARSON (APPLICANT> AND MEMBERS OF, NRC STAFF TO ALLOW CONTINUE OPERATION OF UNIT 4 UNTIL UNIT 3 CAN BE RETURNED TO SVC OR UNTIL UNIT 4 STEAM GENERATOR TUBE LEAKAGE EXCEEDS
0. 35 GPM.

PLANT NAME: TURKEY PT 03 REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL:

4+44+++++eH~+++++4.

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 44+++<+<<<<<<+<<++

GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE A001>

FOR ACTION:

INTERNAL:

BR CHIEF SCHWENCER4+LTR ONLY(7) h E~~LTR ONLY<2)

HANAUER++LTR ONLY(i>

EISENHUT44LTR ONLY< 1)

BAER++LTR ONLY(i>

GRIMES44LTR ONLY< 1)

J.

MCGOUGH~+LTR ONLY(i>

NRC PDR++LTR ONLY(i>

OELD44LTP ONLY<i)

CHECK4+LTR ONLY(l>

SHAO++LTR ONLY< 1)

BUTLER~~LTR ONLY(1)

J COLLINS++LTR ONLY< 1 )

EXTERNAL:

LPDR'S MIAMIr FL4'4'LTR ONLY< 1 )

TIC++LTR ONLY(i)

NSIC4<LTR OIVLY<1)

ACRS CAT B++LTR ONLY(ib)

DISTRIBUTION:

LTR 40 ENCL 0 SIZE:

2P+ iP THE END CONTROL NBR:

780540043

0 l

'I II

P.. BOX 013100, MIAMI, FL 33101 i>M/(iy dv,r,i uW FLORIDAPGWER & LIGHTCOMPANY AII ~5w February 14, 1978 L-78-54 Director of Nuclear Reactor Regulation Attention:

Mr. Edson

Case, Acting Director U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Nr. Case:

Re:

Turkey Point Unit 4 Docket Nu ber 50-251 This letter confirms requests from Messrs.

Uhrig and Pearson of Florida Power 8 Light Company to you and members of your staff to allow us to continue to operate Turkey Point Unit 4 until Turkey Point Unit 3 can be returned to service or until Turkey Point Unit 4 steam generator tube leakage exceeds 0.35 gpm.

As discussed with you and your staff, we are requesting to continue to operate Unit 4 in order to preclude possible power shortages in Dade County.

The Turkey Point Unit 4 steam generator tube leak has been increasing very slowly over the last month.

The leak rate is currently

.316 gpm.

Based on the leak history and our experience with and investigation of other steam generator tube leaks, we expect that the current leak is attributable to a crack located in a dented region at a tube to tube support plate intersection.

A leak rate limitation of 0.35 gpm provides an acceptable margin of conservatism to ensure that the tube leak remains stable during normal operating conditions or during postulated accident conditions.

In our submittal of June 4, 1977, we analyzed potential offsite consequences during various postulated accident conditions with primary to secondary leakage of 0.9 gpm.

The potential consequences were found to be acceptable.

Furthermore, during the few days that Turkey Point Unit 4 will be operated with a steam generator tube leak slightly greater than 0.3 gpm, the probability of any of the postulated accident conditions occuring is extremely remote.

~eOS~oo~>

PEOPLE... SERVING PEOPLE

Mr. Edson Case Page Two February 14, 1978 L-78-54 Based on these considerations, Florida Power 5 Light Company has concluded that operation of Turkey Point Unit 4 with a steam generator tube leak of 0.35 gpm until Turkey Point Unit 3 can be'returned to service will not affect the health and safety of the public.

Very y yours, Robert E. Uhrig Vice, President REU:GDW:sl cc:

J.

P. O'Reilly, Region II Robert Lowenstein, Esquire

f 1

STATE OF FLORIDA

)

)

COUNTY OF DADE

)

ss Robert E. Uhrig, being first duly sworn, deposes and says:

That he is a Vice President. of Florida Power

& Light Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document.

on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this

/g@

day of 19)d NOTARY PUBLIC, in and for the County of Dade, State of Florida NOTARY PII~IJC STATS OF FLC'I'oA It LARGE h'IY COh;h',:","'O"J

[',I I, 3 Ad ',~T 24, 1231 My commission expires:

SONo.=o iNRI'j.vAYNARo soN~.NG io~cY

~

~

g1 l

1'