REGULATORY INFORMATION DISTRIBUTION SYSTEM
< RIDS)
DISTRIBUTION FQR INCOMING MATERIAL 50-315 REC:
KEPPLER J 6 NRC ORG:
SHALLER D V IN 5 MI PWR DOCDATE: 01/23/78 DATE RCVD: 01/31/78 DQCTYPE:
LETTER NOTARIZED:
NQ COPIES RECEIVED
SUBJECT:
LTR 0 ENCL 0 CONFIRMATION OF TEI FPHONE REPT OF 01/21/78 CONCERNING THE ANALYSIS QF THE CHLORINE RESIDUAL QF THE CIRCULATING WATER DISCHARGE WAS FOUND TO BE 0. 12 PPM.
PLANT NAME: CQQK UNIT 1
REVIEWER INITIAL:
XBT DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS INCIDENT REPORTS
< DISTRIBUTION CODE A002)
FQR ACTION:
INTERNAL:
EXTERNAL:
BRANCH CHIE DAVIS~~4LTR ONLY<4)
I 8c E++LTR ONLY(2)
SCHROEDER/IPPQLITQ44LTR ONLY< 1)
NOVAK/CHECK++LTR ONLY(i)
KNIGHT4+LTR ONLY< 1)
HANAUER++LTR ONLY(i>
EISENHUT~+LTR ONLY(i)
SHAO++LTR ONLY(i>
KREGER/J.
CQLI INS4+LTR ONLY<i)
L.
CROCKER+4~LTR ONLY(1 LPDR S ST.
JOSEPH>
MI44LTR ONLY< 1)
TIC++LTR ONLY(1)
NSIC++LTR ONLY(1)
ACRS CAT B++LTR ONLY(ih>
NRC PDR44LTR ONLY< 1)
MIPC++LTR ONLY(3>
HOUSTQNw+LTR ONL (< 1)
GRIMES++LTR ONLY( 1 BUTLER44LTR ONLY/i)
TEDESCO++LTR ONLY(1>
BAER4+LTR ONLY<i)
VOLLMER/BUNCH+~LTR ONLY(i>
ROSA+4LTR ONLY<i)
DISTRIBUTION:
LTR 45 ENCL 0 SIZE:
1P THE END CONTROL NBR:
780310066
H t
~
~
~o
&meWan
/Etoct:ala
~y NDl NA 8 NlcHIG N Po kvER coNPQNN DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 January 23, 1978 Mr. J.G.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Operating License DPR-58 Docket No. 50-315 This is to confirm our telephone report to NRC RO:III Inspector, Mr. K.R. Baker, at 1603 hours0.0186 days <br />0.445 hours <br />0.00265 weeks <br />6.099415e-4 months <br /> on January 21, 1978.
At that time we reported that anaylsis of the chlorine residual of the circulating water discharge was found to be 0. 12 ppm.
A complete report of this event will be submitted by January 27, 1978.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.W. Jurgensen G.E. Lien R. Kilburn R.J. Vollen BPI K. R. Baker RO: I II R.C. Callen MPSC P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G.
Olson J.M. Hennigan PNSRC J.F. Stietzel Dir., IE (20 copies)
Dir., MIPC (2 copies) goo o(e
4,