ML18219D832
| ML18219D832 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/23/1978 |
| From: | Shaller D Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co), American Electric Power Service Corp, American Electric Power Company |
| To: | James Keppler NRC/RGN-III |
| References | |
| Download: ML18219D832 (3) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM
<RIDS)
, DISTRIBUTION FOR INCOMING MATERIAL 50-315 REC:
KEPPLER J G
NRC ORG:
SHALLER D V IN 8( MI PWR DOCDATE: 02/23/78 l3ATE RCVD: 02/27f78 COPIES RECEIVED LTR 1
ENCL 0 DOCTYPE:
I ETTER NOTARIZED:
NO
SUBJECT:
CONFIRMING VERBAL REPT TO NRC ON 02/23/78 CONCERNING BOTH ENGINNERED SAFEGUARD FANS WERE INOPERABLE FOR A PERIOD OF THREE HOURS AND 14 MINUTES... ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 03/07/78.
PLANT NAME: COOK UNIT 1
REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
DISTRIBUTION OF 'THIS MATERIAL IS AS FOLLOWS +++++>>>>+>>>>>>>+
INCIDENT REPORTS (DISTRIBUTION CODE AQ02)
FOR ACTION:
BR
(
4+LTR ONLY<4)
INTERNAL:
FXTERNAL:
REG FILE+~~l TR ONLY(
SCHROEDER/IPPOLITQ~4~LTR ONLY(1)
NOVAK/CHECK++LTR ONLY(i>
KNIGHT4+LTR ONLY< 1)
HANAUER~HILTR ONLY(l>
EISENHUT++LTR ONLY(i)
SHAO++LTR ONLY(l)
KREGER/J.
COLLINS<+LTR ONLY< 1 )
K SEYFRIT/IE+~LTR QNLY(i)
LPDR'S ST.
JQSEPHr MI++LTR ONLY< 1 )
TIC+4~LTR ONLY ( 1 NSIC<+LTR ONLY< 1)
- ACRS, CAT B++LTR ONLY(16>
NRC PDR%%LTR ONLY< 1)
MIPC+~LTR ONLY(3)
HOUSTON~~+I. TR ONLY< 1)
GRIMES++LTR ONLY'(1 >
BUTLER+4LTR ONLY(3.)
TEDESCO+4ILTR ONLY(i>
BAER44LTR ONLY<i)
VOLLMER/BUNCH++LTR ONLY(1>
ROSA++LTR ONLY( 1 )
COPIES ViOT REGULATORY SURIIITTED PER I
GUIDE 10.1 DISTRIBUTION:
LTR 45 ENCL 0 SIZE:
%4M%%%%%%%%%%%%4%%%%8M%4%%%%0F+0FRM%%
THE ENI3 CONTROL NBR:
780590041 4h-f
0 a
~b II
'I 8
g 8
~
~
srksn
~ecerio swor y SEC III:I",uZ~IIZVI.,'"!:Zjl ~II..gIIIIt IIIIDIAItIA8 NICHIGANPONEB COPSPAiJJY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 23, 1978 Nr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Hr. Keppler:
iso Pj l rg) ly 8'perating License DPR-58 Docket No. 50-315 This is to confirm our verbal report to NRC Region III Inspector, Hr. K.R. Baker, at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on February 23, 1978.
At that time we reported that both Engineered Safeguard Fans were inoperable for a period of three hours and 14 minutes.
A followup report will be submitted by Harch 7,
- 1978, as required by Regulatory Guide
- 1. 16, Revision 4, Section 2.a.
Sincerely, D.Y. Shaller Plant Hanager
/bab cc:
J.E.
Dolan R.ll. Jurgensen G.E. Lien R. Kilburn R.J. Yollen BPI K.R. Baker RO:III R.C. Callen HPSC P.H. Steketee, Esq.
R. Halsh, Esq.
G. Charnoff, Esq.
G. Olson J.H.
Hennigan PNSRC J.F. Stietzel Dir., IE (40 copies)
Dir., NIPC (4 copies) 78O59004i o.'