Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Commitments for Resolution of Steam Dryer Degradation Issue". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NRC 2004-0030, Commitments in Response to 95003 Supplemental Inspection  + (Commitments in Response to 95003 Supplemental Inspection)
  • NRC 2004-0019, Commitments in Response to 95003 Supplemental Inspection  + (Commitments in Response to 95003 Supplemental Inspection)
  • ML082410132  + (Commitments to Address Degraded Spent Fuel Pool Storage Rack Neutron Absorber)
  • ML072260039  + (Commitments to Be Confirmed by Order Modifying License (Effective Immediately))
  • CNL-15-260, Commitments to Maintain Severe Accident Management Guidelines  + (Commitments to Maintain Severe Accident Management Guidelines)
  • ML20126M176  + (Commits Resources to Assure That NRC Reviews Are Completed on Schedule Consistent W/Projected Plant Completion Date. Up-to-date Projected Const Completion Date Requested)
  • B15262, Commits Util to Meeting W/Nrc to Discuss Activities Related to Design Mod & Upgrade of ESAS at Millstone Unit 2.Meeting Will Be Held at Plant Prior to Startup of Unit 2  + (Commits Util to Meeting W/Nrc to Discuss Activities Related to Design Mod & Upgrade of ESAS at Millstone Unit 2.Meeting Will Be Held at Plant Prior to Startup of Unit 2)
  • ML19250C149  + (Commits to 791201 Implementation of EPA U Fuel Cycle Std (40CFR190) by Meeting Provisions of Radiological Effluent Tech Spec 3.11.4,Revision 2,in Response to NRC)
  • ML20140B260  + (Commits to 820426 Date for Providing Seismic Reassessment of NSSS Piping (as-built).Initial Date Submitted in Was Unacceptable to NRC)
  • ML19254F448  + (Commits to Accept Oak Ridge Associated Univ Certification in Lieu of Util Basic Radiation Safety Course,In Response to NRC)
  • ML20093C081  + (Commits to Adding Component Cooling Water Pumps to Shutdown Sequencer,In Response to NUREG-0737,Item II.K.3.25, Reactor Coolant Pump Seal Integrity Following Loss of Offsite Power)
  • ML17298B701  + (Commits to Addition of Valves PC-V-215,CT-V-018 & CT-V-019 to ASME Section XI Program.All Active Components Necessary to Transfer Water from Refueling Water or Condensate Storage Tanks Will Meet Code Inservice Insp Requirements)
  • ML20076G255  + (Commits to Addl Action Items Associated W/Westinghouse Reactor Trip Breakers,Model DS-416,based on 830602 Telcon. Only Replacement Undervoltage Trip Attachments W/Record of 25 Cycles Will Be Used)
  • ML19210E687  + (Commits to Addl Confirmatory Condensation Oscillation Tests in full-scale Test Facility,Outlined in GE Re Mark I Containment Program.Schedule for Submittal of Plant Unique Analysis Will Be Provided Following NRC Resolution)
  • ML20076K782  + (Commits to Addl Volumetric Testing of Welds to Determine Extent of Intergranular Stress Corrosion Cracking in Recirculation Sys & RHR Sys Piping,Per 830707 Meeting W/Nrc. Proposed Insp Plan Will Be Submitted by 830805)
  • ML20211P814  + (Commits to Adopt Procedures for Insp & Maint Following Each Lift of Pressurizer Safety Valve Involving Discharge of Water,In Response to Request for Addl Info Re Pressurizer Safety Valve,Per SER Confirmatory Item 12 & Item II.D.1)
  • ML20010C113  + (Commits to Amend Safeguards Contingency Plan by 810930.Amend Will Address Revised Compensatory Action for Guard Strike Contingency Event.Addl Comments for Resolution of Guard Training/Qualification Plan Will Be Submitted 810930)
  • ML19350A626  + (Commits to Annual Reporting of II.K.3.3 Safety Relief Valve Failures & Challenges)
  • L-85-372, Commits to Apply Appropriate Tech Spec Requirements to Address Auxiliary Feedwater Pump Availability & Performance Monitoring.Several Items Discussed in IE Operational Readiness Insp Team 850913 Exit Meeting Resolved  + (Commits to Apply Appropriate Tech Spec Requirements to Address Auxiliary Feedwater Pump Availability & Performance Monitoring.Several Items Discussed in IE Operational Readiness Insp Team 850913 Exit Meeting Resolved)
  • ML19276G283  + (Commits to Applying Revision 4 to QA Topical rept,Duke-1-A, to Comply w/10CFR71.15 Requirements,In Response to)
  • ML20037D206  + (Commits to Augment Operator Training by Participation in Preoperational/Startup Test Programs Per BWR Owners Group Guidelines,In Response to NRC .Results of Test Program Will Be Documented Per Reg Guide 1.68)
  • ML20206E056  + (Commits to Broadening Scope of 870226 Upgrade of Meteorological Sys to Include Installation of fixed-width Guyed Tower Approx 120 Yards Southwest of Existing Tower,Per 870211 Meeting.Schedule Will Be Submitted within 30 Days)
  • ML20039B447  + (Commits to Complete BWR Mark I Containment long-term Program Prior to Startup for Fuel Cycle 7 (Unit 1) & Fuel Cycle 4 (Unit 2))
  • ML20064L304  + (Commits to Complete NUREG-0737,Item II.D.3, Safety/Relief Valve Position Indication Equipment, by Final Required Date.Delay Incurred by Logistics of Restructuring Test Program to Incorporate Corrective Actions)
  • ML18153A291  + (Commits to Complete Two Listed Actions Re Relief Request from ASME Section XI Pressure Boundary CA & Flaw Evaluation Requirements to Permit Determination of Operability of Rhrs)