MONTHYEARML20083N6361983-03-19019 March 1983 Rev 1 to Design Rept for Weld Overlay Repairs & Flow Evaluations in Recirculation & RHR Sys Project stage: Other ML20151H6271983-04-28028 April 1983 Notification of 830429 Meeting W/Util in Atlanta,Ga to Discuss Results of Ongoing Ultrasonic Insp of Pipes, Details of Crack Length & Depth Determinations,Proposed Repairs & Bases for Repairs Project stage: Meeting ML20071G5191983-05-19019 May 1983 Advises That Startup Expected to Occur Between 830607-14 Assuming Resolution of Outstanding Licensing Issues.Unknowns Still Exist in Schedule Due to Existence of Pipe Flaw Indications.Draft Rept on Weld Repairs Expected by 830530 Project stage: Draft Other ML20071M0931983-05-25025 May 1983 Discusses Possible Imposition of Augmented Leak Detection Requirements for RCS Due to Discovery of Unacceptable Pipe Flaw Indications in Recirculation & RHR Sys.Util Commitments to Incorporate NUREG-0313,Rev 1,Section IV.B.1.a.2 Project stage: Other ML20071M0811983-05-26026 May 1983 Provides Response to IE Bulletin 83-02 Re Stress Corrosion Cracking in large-diameter Stainless Steel Recirculation Sys Piping at BWR Plants Project stage: Other ML20071M0591983-05-26026 May 1983 Submits Info Re Analyses & Repairs of large-diameter Stainless Steel Piping Welds Per Inservice Insp Conducted During 1983 Maint/Refueling Outage Identifying Unacceptable Ultrasonic Indications in Recirculation & RHR Sys Project stage: Other ML20076G1751983-05-26026 May 1983 Corrected Response to IE Bulletin 83-02 Re Inservice Insp Activities Concerning Stress Corrosion Cracking in Large Diameter,Stainless Steel Recirculation Sys Piping at BWR Plants.Weld Exam List Encl Project stage: Other ML20071M1091983-05-31031 May 1983 Draft Rev a to Design Rept for Weld Overlay Repairs & Flaw Evaluation in Recirculation & RHR Sys, Preliminary Rept Project stage: Draft Other ML20071N5891983-06-0202 June 1983 Submits Revs to 830525 Augmented RCS Leak Detection Submittal & Inservice Insp Program Commitment,Incorporating Surveillance Frequencies Per NUREG-0313,Rev 1.Insp &/Or Mod Plans for Recirculation & RHR Sys Piping Forthcoming Project stage: Other ML20072A4391983-06-0707 June 1983 Rev 0 to Design Rept for Weld Overlay Repairs & Flaw Evaluations in Recirculation & RHR Sys Project stage: Other ML20072A4301983-06-0808 June 1983 Forwards Rev 0 to Design Rept for Weld Overlay Repairs & Flaw Evaluations in Recirculation & RHR Sys. Sensor Check Will Be Performed Every 4 Hours in Addition to Interval Required by Tech Specs,Effective at Restart Project stage: Other ML20077F3671983-06-10010 June 1983 Rev 0 to Investigation of Cause of Cracking in Hatch Unit 2 RCS Piping - Comparison W/Unit 1 Cracking Experience Project stage: Other ML20244C3671983-06-20020 June 1983 Summary of 830601 Meeting W/Util in Bethesda,Md Re Util Evaluation & Repair of Cracks in Weld Area of Reactor Heat Removal & Recirculation Sys Piping.Supporting Documentation & Viewgraphs Encl Project stage: Meeting ML20076N3681983-07-0808 July 1983 Order Confirming Licensee Commitments to Repair Recirculation Pipe Sys Cracks & Authorizing Restart Project stage: Other ML20076K7821983-07-0808 July 1983 Commits to Addl Volumetric Testing of Welds to Determine Extent of Intergranular Stress Corrosion Cracking in Recirculation Sys & RHR Sys Piping,Per 830707 Meeting W/Nrc. Proposed Insp Plan Will Be Submitted by 830805 Project stage: Meeting ML20077F3511983-07-12012 July 1983 Forwards Rev 0 to Investigation of Cause of Cracking in Hatch Unit 2 Rcs,Piping - Comparison W/Unit 1 Cracking Experience. Areas Investigated:Fabrication History, Applied & Residual Stresses & Operational History Project stage: Other ML20078M1931983-10-19019 October 1983 Ro:On 831018,drywell Equipment Drain Sump Pump 2G11-C006B Became Inoperable W/Redundant Pump Also Inoperable.Cause Not Stated.Increase of 1.9 Gpm Unidentified Leakage Into Sump Drain Requested for 30-day Period Project stage: Other ML20083N6191984-03-29029 March 1984 Forwards Rev 1 to Nutech Rept, Design Rept for Weld Overlay Repairs & Flaw Evaluations in Recirculation & RHR Sys Project stage: Other 1983-06-10
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
Gee a a Pcwer Cypany 333 heent ' Ce Atama Gmrct 173AS iBmec 404 026J893 W img Adamss Pest Ctu Ccv 495 Arrta Gm pa 3030?
G.F. Head NED-83-384 s-a we -
m-runarnce July 8, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division. of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 ComITMENT FOR INTERIM TESTING OF PLANT PIPING FOR IGSCC Gentlemen:
On July ~ 7, 1983, Georgia Power Company (GPC) management met with U.
S.
MJclear Regulatory Commission staff management concerning operation of Plant Hatch Unit 2 with existing conditions of Intergranular Stress Corrosion Cracking (IGSCC) in recirculation system and residual heat removal (RHR) systeJn piping.
Pursuant to those conversations, GPC hereby makes the following commitments:
GPC will conduct additional volumetric testing of appropriate welds to determine to what extent, if any, IGSCC cracking has progressed in both the repaired and unrepaired RFR and recirculation piping.
A detailed proposed inspection plan will be submitted for NRC review by August 5, 1983.
This plan shall include provisions for identifying crack depth and crack propagation rate to support continued plant operation.
If you have questions regarding these commitments, please contact this office.
Very truly yours,
)
%.t.tk G. F. Head WEB /mb xc:
J. T. Beckham, Jr.
I H. C. Nix, Jr.
}
L. T. Gucwa J. P. O'Reilly (NRC-Region II)
,h Senior Resident Inspector L
8307180101 830708 PDR ADOCK 05000366 P