Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Comments on Unit 2 Operating License". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19242B074  + (Comments on Trip Rept to Tmi.Rept Failed to Mention That Need Was Expressed for Definitive Criteria for Shallow Land Burial Grounds.W/O Criteria,Decisions Are Based on Engineering Judgments.Requests Development of Criteria)
  • ML18114A830  + (Comments on Two Additional Fuel Facility Fee Matrix Options Discussed During March 27, 2018, Public Meeting)
  • ML20024D451  + (Comments on Two Commitments Made at Committee on Labor & Human Resources 830629 Hearing.Confidentiality Will Be Granted & FBI Will Be Requested to Interview Each Witness. Draft Confidentiality Agreement Encl)
  • ML20128Q660  + (Comments on Two Meetings Between NRC & B&W Owners Group During Wk of 850705 Re Present Status of ex-vessel Dosimetry Program & Degraded Core Investigations)
  • ML20214J963  + (Comments on Two NRC Draft Generic Technical Positions, Including Peer Review for High Level Nuclear Waste Repositories.Summary of Draft Generic Technical Position on QA Requirements Unintelligible to Untrained QA Reader)
  • ML20128N281  + (Comments on Two Points Re BMI-2104 Peer Review Jan 1984 Meeting.Clarification Requested Re Nomenclature for Tmlb Delayed Containment Failure Accident in Vol V)
  • ML20043H294  + (Comments on Two Recent Requests by Boston Edison to Amend License for Plant.Trend to Reduce Testing & Lengthen Allowed out-of-svc Periods of Great Concern.Solution Should Be to Improve How Tests Conducted)
  • ML20135C576  + (Comments on Tx Dept of Health Bureau of Radiation Control DSI-4, NRC Direction Setting 4,NRC Relationship W/Agreement States)
  • ML19253A280  + (Comments on U Mills Tailings Radiation Control Act of 1978: Most Consistent Interpretation Provides That No NRC Tailings License Is Required for 3 Yrs & Defers Imposition of New Requirements for 3 Yrs)
  • ML19319A293  + (Comments on U.S. Department of Energy West Valley Demonstration Project Final Study Document: Vitrification Facility Air Emissions During Open-Air Demolition, Measured Vs Predicted, WVDP-579)
  • ML20235C852  + (Comments on USGS Discovery of Active Earthquake Fault within Excavation Proceeding at Proposed Power Reactor on Bodega Head.Concerns Re Util Intentions to Continue Excavation Noted)
  • ML022830191  + (Comments on USNRC Safety Evaluation with Open Items Related to License Renewal of McGuire, Units 1 & 2 and Catawba, Units 1 & 2)
  • ML20028A470  + (Comments on Ucs Petition for Rulemaking PRM-50-35 Re Amend of Emergency Planning Rule.Supports Petition)
  • ML20028A468  + (Comments on Ucs Petition for Rulemaking PRM-50-35.Supports Petition)
  • ML20028C943  + (Comments on Ucs Petition for Rulemaking PRM-50-35 Re Emergency Planning.Supports Petition)
  • ML20028C942  + (Comments on Ucs Petition for Rulemaking PRM-50-35 Re Licensing of Plants Prior to Determination of Offsite Emergency Plans.Opposes Petition)
  • ML19343C987  + (Comments on Ultrasonic Test Reliability of Detection Relevant to Flaw Significance as Compared W/Asme Stds & Ancillary Measures Re Vessel Failure.Alternate Procedures Yield Better Reliability Values than Code Procedures)
  • ML20078S716  + (Comments on Ultrasonic Testing Concerns Noted in Insp Repts 50-338/94-23 & 50-339/94-23 on 940926-30.Drawings Used to Perform UT Exam for Facilities Will Be Revised Prior to Next Unit 2 Refueling Outage,Currently Schedule for 950325)
  • ML20133N347  + (Comments on Umtrap Draft Certification Plan for Processing Sites.Wording in Plan Should Be Replaced by Specific Detailed Info to Avoid Miscommunication Between NRC & DOE, Per 850726 Technical Assistance Request 85054)
  • ML20133N321  + (Comments on Umtrap Draft Certification Plan,Per Technical Assistance Request TAR-85055.Plan Does Not Specify Types of Data to Be Collected & Audits to Be Performed During Remedial Actions)
  • ML19329D270  + (Comments on Undated Memorandum of Understanding Between Util & City of Cleveland Re Util Acquisition of Cleveland Municipal Electric Sys.Expresses Concern Re Possible Antitrust Violations.Memorandum & Certificate of Svc Encl)
  • ML20215F336  + (Comments on Undated Proposal from AB Atomenergi of Sweden to Participate in Experimental Program Making Use of Abandoned Marviken Reactor in Series of Blowdown Tests.Encouraging to See Foreign Organizations Undertaking Test Programs)
  • ML20206H099  + (Comments on Under Advisement Vote of NRC on 881014,which Would Have Given Permission to Restart Plant.Nrc Should Contact Author for Current & up-to-date Assessment of Where Plymouth Is in Planning Process)
  • ML20091L178  + (Comments on Underground Utils Section of Interagency Agreement NRC-03-79-167,Task 1 Re Plant Fill,Per Request)
  • ML19317H229  + (Comments on Unit 2 Environ Rept.Land Use & Cooling Tower Plume Effects on Navigation Should Be Revised. Recreational Land Use Discussion Should Be Expanded & Land Use Compatibility Should Reflect Plant Impact on Area)
  • ML20148K697  + (Comments on Univ of Missouri Petition for Rulemaking PRM-50-48 Re New Definition for Reactor Research & Redefinition of Term Testing Facility.Agrees That Excessive & Unnecessary Regulations Contrary to Atomic Energy Act)
  • ML20058J002  + (Comments on Upcoming Public Meeting & Schedule for State Decommissioning Rules)
  • ML20028D207  + (Comments on Upgrading Inservice Insp/Inservice Testing Program.Upgrade Requires Extensive Rewrite Due to Significant Changes in 1980 Edition of ASME Section XI Code from That Currently Used.Submittal Delayed Until 830801)
  • ML19350B590  + (Comments on Upper Plenum Igniters of Ice Condenser Plants, Per Review of Evaluation of Glow Plug Igniter Concept for Use in Sequoyah Nuclear Plant. Evaluation Encl)
  • ML19259B765  + (Comments on Uranium Mill Tailings Radiation Control Act of 1978.Requests Opinion Whether Mills Must Comply W/Act Immediately & Whether Mills Will Require NRC License)
  • ML20212C590  + (Comments on Us Pipe & Foundry Co Supplemental Info on Proposal to Bury Cs-137 Contaminated Soil,Per Godwin 860509 Request.Recommends That State Provide Public Participation in Decisionmaking Process.Nmss 860625 Comments Encl)
  • ML20244B553  + (Comments on Use of Amplification Factors for Developing Equipment Base Seismic Capacity for Relays Mounted on Motor Control Ctr & non-motor Control Ctr Equipment)
  • ML20195J924  + (Comments on Use of Commercial Plant Performance Indicators Identified in AEOD .Concern Expressed Re Validity of Indications Which Have Small Industry Averages & Definition Used for Safety Sys Actuation)
  • ML19323B951  + (Comments on Use of Failure Modes & Effects Analysis in Licensing Process.Branch SRPs Do Not Require Formal Analysis.Applicants Perform Pipe Break Effects Analysis Which Is Reviewed by Branch.Draft Memo Encl)
  • ML20213A514  + (Comments on Use of Idcor Methodology for Planned Individual Plant Exams for Severe Accident Vulnerabilities.Concerns Re Utils Willingness & Ability to Perform Exams & NRC Review of Exams Discussed.Comments Requested)
  • ML20053D327  + (Comments on Use of Term Important to Safety in Draft Reg Guide IC 126-5.Use of Term Nuclear safety-related Recommended)
  • ML20084Q644  + (Comments on Util 700403 Submittal Re Disposition of safe- Ends)
  • ML19329A457  + (Comments on Util 740904 Request to Change Tech Spec 3.6 Re Reactor Bldg.Time Periods Acceptable.Sts Development Helpful.Corrective Action Period & Requirement That Hatch Door Be Closed During Repairs Should Be in Tech Spec)
  • ML19329A454  + (Comments on Util 740904 Request to Change Tech Spec 3.6, Containment Integrity. Recommends That Proposed Tech Specs Be Contingent on Adoption of STS Time Period)
  • ML19249D331  + (Comments on Util 790815 Evaluation of Alternative RCS Pressure Indication During tie-in of New Sample Sys. Implementing Sys Should Be Delayed Until Direct Decay Heat Removal Is in Operation)
  • ML19308B615  + (Comments on Util 791016 Program Detailing Plans for Controlling Primary Sys Chemistry.Program Does Not Accurately Predict Corrosive Activity of Primary Coolant or Indicate When Corrosion Mitigating Actions Are Necessary)
  • ML19211C619  + (Comments on Util 791206 Request to Resume Specific Items of Work.Methods of Installing & Monitoring Both short-term & long-term Piezometers Acceptable.Proposed Dressing & Protecting Slopes Is Acceptable)
  • ML19338C835  + (Comments on Util 800818 Preliminary Evacuation Time Study & Requests NRC Insure That City of Mentor Has Integral Role in Facility Emergency Planning.Study Has Serious Flaws That Must Be Examined & Corrected)
  • ML17341B205  + (Comments on Util 820211 Proposed Amend to Tech Specs Re Fire Hose Station.Tech Specs Should Require Hose at Exterior Locations to Be Hydrostatic Tested Annually & at Interior Locations Every 3 Yrs)
  • ML17139A640  + (Comments on Util 820316 Submittal Re Independent Design Review to Be Conducted by Contractor,Teledyne Engineering Svcs)
  • ML20094M526  + (Comments on Util 840307 Proposed Independent Mgt Plan.Plan Does Not Indicate How Cresap,Mccormick & Paget & Tera Will Function & Interface.Roles,Authorities & Responsibilities Should Be Identified.Handwritten Comments Encl)
  • ML20137Q344  + (Comments on Util 850910 Request for Deferral of Operability Demonstration for Certain Items of RMS Equipment Beyond Scheduled Fuel Date.Date for Meeting in Bethesda,Md to Discuss Issue Requested)
  • ML20154P809  + (Comments on Util 851108 Request for Authorization to Apply ASME Nuclear Component Code Cases N-411 & N-397 to Piping Reanalyses Used to Optimize Number of Snubbers Used in Piping Sys.Subj Code Cases Conditionally Acceptable)
  • ML20214D350  + (Comments on Util 860722 Rev 4 to Updated Fsar.Section 3.4.12 Re Internal Schedule for Justifying Replacement of full- Length Reflector Blocks w/half-length Blocks Should Be Clarified in Next FSAR Update)
  • ML20214P857  + (Comments on Util 870414 Request to Raise Approved Level of Facility to 25% Power.Issuance of License for Greater than 5% Power Would Be Irresponsible Due to Unresolved Issue of Noncooperation by State of Ny & Suffolk County)