ML19329A454

From kanterella
Jump to navigation Jump to search
Comments on Util 740904 Request to Change Tech Spec 3.6, Containment Integrity. Recommends That Proposed Tech Specs Be Contingent on Adoption of STS Time Period
ML19329A454
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/19/1974
From: Sniezek J
US ATOMIC ENERGY COMMISSION (AEC)
To: Purple R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19329A455 List:
References
NUDOCS 8001031016
Download: ML19329A454 (1)


Text

,

ym - my..

l~,_

7..

^

w-

~

l1; I

NOV 191974 R. Purple, Chief, Operating Reactors Branch 1 DL I

DUKE POWER COMPAHY (OCONEE 1, 2 & 3) DOCKET NOS. 50-269/270/287 CHANGE REQUEST, TECHNICAL SPECIFICATIONS (T/S) SECTION 3.6,

" CONTAINMENT INTEGRITY," DTD 9/4/74 We are in basic agreement with the licensee regarding the need

(

j for establishing provisions in the T/S that will permit pre-j ventative or corrective maintenance to be performed during 4

operation. However, we differ with the licensee's proposed time limit for effecting this action. We note that the time l

periods proposed by the licensee are at variance with similar limits established in the standard T/S for Babcock & Wilcox facilities.

As you know, R0 is developing a unifom inspection program for A primary ingredient in this program operating power reactors.

is the adoption of unifom inspection requirements that can be achieved by the use of standardized T/S; we therefore recomend that approval of the licensee's proposed technical T/S be con-tingent on the adoption of the time periods established in the standard T/S.

Ori:ical silp se 4

u. was*

J. H. Sniezek, Chief Facility Inspection Branch Directorate of Regulatory i

Operations j

l cc:

RHVo11mer, DL HDThornburg,R0(F20025H3) l FJNolan,R0(C&O:725)

+

WSeidle, RO:II

.I R0 Files t,

/

RO:C&O: FIB R0:F1 C f

FJNolan 0

a

'c = *

7...., x-7451/mibi J d ezek

~

~

?'

II/,I9, 11/ - 174 11/h/74 w Anc.ns m.,.sn Anm==

  • o.

..u...

q

    • ?!s? o l6 J