ML19329A454
| ML19329A454 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 11/19/1974 |
| From: | Sniezek J US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Purple R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19329A455 | List: |
| References | |
| NUDOCS 8001031016 | |
| Download: ML19329A454 (1) | |
Text
,
ym - my..
l~,_
7..
^
w-
~
l1; I
NOV 191974 R. Purple, Chief, Operating Reactors Branch 1 DL I
DUKE POWER COMPAHY (OCONEE 1, 2 & 3) DOCKET NOS. 50-269/270/287 CHANGE REQUEST, TECHNICAL SPECIFICATIONS (T/S) SECTION 3.6,
" CONTAINMENT INTEGRITY," DTD 9/4/74 We are in basic agreement with the licensee regarding the need
(
j for establishing provisions in the T/S that will permit pre-j ventative or corrective maintenance to be performed during 4
operation. However, we differ with the licensee's proposed time limit for effecting this action. We note that the time l
periods proposed by the licensee are at variance with similar limits established in the standard T/S for Babcock & Wilcox facilities.
As you know, R0 is developing a unifom inspection program for A primary ingredient in this program operating power reactors.
is the adoption of unifom inspection requirements that can be achieved by the use of standardized T/S; we therefore recomend that approval of the licensee's proposed technical T/S be con-tingent on the adoption of the time periods established in the standard T/S.
Ori:ical silp se 4
- u. was*
J. H. Sniezek, Chief Facility Inspection Branch Directorate of Regulatory i
Operations j
l cc:
RHVo11mer, DL HDThornburg,R0(F20025H3) l FJNolan,R0(C&O:725)
+
WSeidle, RO:II
.I R0 Files t,
/
RO:C&O: FIB R0:F1 C f
FJNolan 0
a
'c = *
- 7...., x-7451/mibi J d ezek
~
~
?'
II/,I9, 11/ - 174 11/h/74 w Anc.ns m.,.sn Anm==
- o.
..u...
q
- ?!s? o l6 J