Text
~
TORATE GF RE@tutKcRW M
~
p
=Ee sw si - suit E os g
230 PE ACHTQ3 E STRE E T. NOMT HwE ST g
,, y Isras '
AT L ANT A. G203Ge A 30303
/
. /
October 3,1974
..\\
fb. C. Seidle, Chief, Facilities Test and Startup Branch
/
Directorate of Regulatdry Operations, Region II,
OCONEE TS CHANCE REQUEST ON REACTOR BUILDING - TS 3.6 DATED SEPTE!GER 4,1974 I believe a corrective action period should be included in this Technical Specification and the time periods requested are acceptable.
Arkansas 1 TS allows 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to repair isolation valves and nothing for door repairs.
It would be better if a Standard could be developed for this situation.
I would suggest adding words to 3.6.4.a. to require the remaining operable door of the affected hatch to be closed durir.g the repair period.
l/i l
F. Jape
/1 Reactor Inspector R0:II:FJ Facilities Test'and Startup Branch o
I 9
t
~,
w
,p T,'
~ ~ ~ =*
8 001031Of f
-