Comments on Util 740904 Request to Change Tech Spec 3.6 Re Reactor Bldg.Time Periods Acceptable.Sts Development Helpful.Corrective Action Period & Requirement That Hatch Door Be Closed During Repairs Should Be in Tech Spec
ML19329A457
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/03/1974
From: Jape F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19329A455 List:
References
NUDOCS 8001031019
Download: ML19329A457 (1)


Text

~

TORATE GF RE@tutKcRW M

~

p

=Ee sw si - suit E os g

230 PE ACHTQ3 E STRE E T. NOMT HwE ST g

,, y Isras '

AT L ANT A. G203Ge A 30303

/

. /

October 3,1974

..\\

fb. C. Seidle, Chief, Facilities Test and Startup Branch

/

Directorate of Regulatdry Operations, Region II,

OCONEE TS CHANCE REQUEST ON REACTOR BUILDING - TS 3.6 DATED SEPTE!GER 4,1974 I believe a corrective action period should be included in this Technical Specification and the time periods requested are acceptable.

Arkansas 1 TS allows 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to repair isolation valves and nothing for door repairs.

It would be better if a Standard could be developed for this situation.

I would suggest adding words to 3.6.4.a. to require the remaining operable door of the affected hatch to be closed durir.g the repair period.

l/i l

F. Jape

/1 Reactor Inspector R0:II:FJ Facilities Test'and Startup Branch o

I 9

t

~,

w

,p T,'

~ ~ ~ =*

8 001031Of f

-