Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-255 + (Change Title of Spent Fuel Assembly Storage to Spent Fuel Pool Storage)
- ML13346A018 + (Change Update in Level 2 Pesonnel at RPI Reactor Critical Facility)
- ML20138K808 + (Change Wiring of Flow Controllers 2YIC-926A for Spray Additive Tank Sys on C01 in CR for Unit 2)
- ML20138K813 + (Change Wiring of Flow Controllers 2YIC-926B for Spray Additive Tank Sys on C01 in CR for Unit 2)
- ML051940201 + (Change a Surveillance Requirement for Reactor Trip Circuit Breakers - Supplemental Information)
- ML17347B285 + (Change a to Rev 1 to JNS-PTN-200, Second Ten-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves)
- ML20059C015 + (Change a to Rev 8 to PCP-001, Process Control Program for Processing Wet Waste)
- TSTF-185 + (Change and to or in Cpis Condition B)
- DCL-08-001, Change for Chief Nuclear Officer Contact Information + (Change for Chief Nuclear Officer Contact Information)
- ML22088A255 + (Change for NRC Distribution Lists Re Entergys Vice President, Regulatory Assurance)
- ML061510479 + (Change in AFI Implementation Date from 2005 Independent Safety Culture Assessment)
- ML092440804 + (Change in Alternative Course of Action Schedule Described in Our Three-Month Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal)
- ML21025A024 + (Change in Authorizing Official for Centrus Energy Corps Classified Information Systems/Networks)
- ML18183A538 + (Change in Cognizant Security Office)
- ML15245A286 + (Change in Commissioners for the Rhode Island Atomic Energy Commission Update)
- ML14104A596 + (Change in Commissioners for the Rhode Island Atomic Energy Commission)
- ML13318A095 + (Change in Commissioners for the Rhode Island Atomic Energy Commission)
- ML071640380 + (Change in Commitment Concerning Control Rod Testing)
- ML071010555 + (Change in Commitment Concerning Control Rod Testing Salem Nuclear Generating Station, Unit Nos. 1 and 2,)
- CNL-17-023, Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME5506 and ME8807 + (Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME5506 and ME8807)
- CNL-14-011, Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME8806 and ME8807 + (Change in Commitment Related to External Flooding Concerns (TAC Nos. ME8805, ME8806 and ME8807)
- CNL-14-159, Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk + (Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk)
- CNL-14-140, Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk + (Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk)
- CNL-13-118, Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk + (Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk)
- PLA-7091, Change in Completion Date for the Installation of Satellite Phone Base Stations and Antennas, PLA-7091 + (Change in Completion Date for the Installation of Satellite Phone Base Stations and Antennas, PLA-7091)
- ML22256A303 + (Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR)
- ML16195A021 + (Change in Corporate Form of Entergy Nuclear Holding Company)
- NOC-AE-09002497, Change in Correspondence Addressee + (Change in Correspondence Addressee)
- NOC-AE-03001520, Change in Correspondence Addressee + (Change in Correspondence Addressee)
- ML093580099 + (Change in Correspondence Addressee)
- ML031120081 + (Change in Correspondence Addressee)
- ML043010606 + (Change in Creats Modification Control Room HVAC Refrigerant Charge)
- NRC-20-0019, Change in DTE Commitment Regarding Containment Coatings and Additional Information + (Change in DTE Commitment Regarding Containment Coatings and Additional Information)
- PNP 2012-003, Change in Dates for Initial Licensed Operator Examinations + (Change in Dates for Initial Licensed Operator Examinations)
- ML18087A433 + (Change in Determination for Withholding Information from Public Disclosure)
- ML18087A474 + (Change in Determination for Withholding Information from Public Disclosure)
- GO2-00-086, Change in Distribution + (Change in Distribution)
- 05000483/FIN-2005005-10 + (Change in EAL 3E Decreased the Effectiveness of the Emergency Plan)
- ML22077A054 + (Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance)
- ML24219A420 + (Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071))
- NUREG-1433, Change in Estimated Review Schedule (August 22, 2025) for Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 + (Change in Estimated Review Schedule (August 22, 2025) for Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5)
- ML24032A470 + (Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC)
- ML24088A216 + (Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance)
- ML24221A238 + (Change in Estimated Review Schedule and Level of Effort for Palo Verde Units 1, 2, and 3)
- ML23125A145 + (Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752)
- ML24261B957 + (Change in Estimated Review Schedule for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2)
- ML22341A085 + (Change in Estimated Review Schedule for EPRI Report 3002018337, Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recaptutopical Report)
- ML24149A353 + (Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment)
- ML24219A022 + (Change in Estimated Review Schedule for Electric Power Research Institute Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components)
- ML24211A073 + (Change in Estimated Review Schedule for Electric Power Research Institute Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components)
- ML24255A002 + (Change in Estimated Review Schedule for BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components)
- ML24096B714 + (Change in Estimated Review Schedule for MRP-227, Revision 2, Pressurized Water Reactor Internals Inspection and Evaluations Guideline)
- ML033290357 + (Change in Facility Management Chain for U. Mass. Lowell)
- ML17018A287 + (Change in Facility Security Officer at the Nuclear Energy Institute (003))