Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Change in Correspondence Addressee". Since there have been only a few results, also nearby values are displayed.

Showing below up to 27 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML043010606  + (Change in Creats Modification Control Room HVAC Refrigerant Charge)
  • NRC-20-0019, Change in DTE Commitment Regarding Containment Coatings and Additional Information  + (Change in DTE Commitment Regarding Containment Coatings and Additional Information)
  • PNP 2012-003, Change in Dates for Initial Licensed Operator Examinations  + (Change in Dates for Initial Licensed Operator Examinations)
  • ML18087A433  + (Change in Determination for Withholding Information from Public Disclosure)
  • ML18087A474  + (Change in Determination for Withholding Information from Public Disclosure)
  • GO2-00-086, Change in Distribution  + (Change in Distribution)
  • 05000483/FIN-2005005-10  + (Change in EAL 3E Decreased the Effectiveness of the Emergency Plan)
  • ML22077A054  + (Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance)
  • ML24219A420  + (Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071))
  • NUREG-1433, Change in Estimated Review Schedule (August 22, 2025) for Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5  + (Change in Estimated Review Schedule (August 22, 2025) for Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5)
  • ML24032A470  + (Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC)
  • ML24088A216  + (Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance)
  • ML24221A238  + (Change in Estimated Review Schedule and Level of Effort for Palo Verde Units 1, 2, and 3)
  • ML23125A145  + (Change in Estimated Review Schedule and Level of Effort for Proposed Alternative to Use Code Case N-752)
  • ML24261B957  + (Change in Estimated Review Schedule for BWRVIP-138, Updated Jet Pump Beam Inspection and Flaw Evaluation Guidelines, Revision 2)
  • ML22341A085  + (Change in Estimated Review Schedule for EPRI Report 3002018337, Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recaptutopical Report)
  • ML24149A353  + (Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment)
  • ML24219A022  + (Change in Estimated Review Schedule for Electric Power Research Institute Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components)
  • ML24211A073  + (Change in Estimated Review Schedule for Electric Power Research Institute Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components)
  • ML24255A002  + (Change in Estimated Review Schedule for BWRVIP-100, Revision 2, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Internal Components)
  • ML24096B714  + (Change in Estimated Review Schedule for MRP-227, Revision 2, Pressurized Water Reactor Internals Inspection and Evaluations Guideline)
  • ML033290357  + (Change in Facility Management Chain for U. Mass. Lowell)
  • ML17018A287  + (Change in Facility Security Officer at the Nuclear Energy Institute (003))