Change in AFI Implementation Date from 2005 Independent Safety Culture Assessment
ML061510479
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/26/2006
From: Bezilla M
FirstEnergy Nuclear Operating Co
To: Caldwell J
Division of Nuclear Materials Safety III
References
COIA-SC-05-03
Download: ML061510479 (3)


Text

-

FENOC FirstEnergy Nuclear Operaling C m p a n y 4 19-321-7676 Ma* B. BSnll~

Vice President - Nuclear Fax. 419-327-7582 Docket Number 50-346 License Number NPF-3 Serial Number 1-1463 May 2 6 , 2006 Mr. James L. Caldwell Regional Administrator, Region 111 U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 2 10 Lisle, IL 60532-4352

Subject:

Change to Completion Date of Action in Response to 2005 Safety Culture Independent Assessment Area for Improvement C01A-SC-05-03

Dear Mr. Caldwell:

Nuclear Regulatory Commission (NRC) letter, dated March 8,2004, Approval to Restart the Davis-Besse Nuclear Power Station, Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order, requires the FirstEnergy Nuclear Operating Company (FENOC) to contract with independent outside organizations to conduct comprehensive assessments, one of which is safety culture, including safety conscious work environment.

In accordance with the Confirmatory Order, an independent assessment of safety culture at the Davis-Besse Nuclear Power Station (DBNPS) was conducted from November 1, 2005, through November 18, 2005. The assessment results and the DBNPS-proposed action plans to address Areas for Improvement (AFI) were submitted to the NRC under DBNPS letter Serial Number 1-1449, dated January 27,2006.

This letter provides notification of a change in the completion date of the following AFI action identified as a commitment in DBNPS letter Serial Number 1-1449. Specifically, the AFI C01A-SC-05-03 action plan stated, in part:

To further enhance the benefits of robust Operating Experience and Self-Assessment programs, Davis-Besse will implement actions for 2006 to:

Enhance discussion of Operating Experience in the morning Management Alignment and Ownership Meetings by periodically addressing relevant Operating Experience.

(Action to be completed by April 30,2006)

RECEIVED MAY 3 12006

Docket Number 50-346 License Number NPF-3 Serial Number I - 1463 Page 2 of 2 This action was scheduled for completion by April 30,2006, based on the DBNPS fourteenth refueling outage (14RFO) schedule, which, at the time of submittal of the 2005 Safety Culture Independent Assessment Report and Action Plans, had a target milestone for 100 percent reactor power of April 1 1,2006. The morning Management Alignment and Ownership Meetings (MAOMs) are suspended during refueling outages, including 14RF0, and were scheduled to resume following return to 100% power. The refueling outage extended past April 30, and the MAOMs were not resumed until May I ,

2006. A discussion of relevant Operating Experience was an agenda item for the MAOM held on May 3,2006.

The change of the due date for this action was discussed with Ms. Chnstine Lipa, NRC Region I11 Chief, Branch 4, Division of Reactor Projects, and Mr. Geoffrey Wright, NRC Inspector, on April 27,2006.

If you have any questions or require further information, please contact Mr. Clark A Price, Manager - Regulatory Compliance, at (419) 321- 8585.

Sincerely yours, m d U Mark B. Bezilla LJS J

Attachment cc: USNRC Document Control Desk C.A. Lipa, Branch Chief, NRC Region 111 DB-I NRC/NRR Project Manager DB-I NRC Senior Resident Inspector Utility Radiological Safety Board

Docket Number 50-346 License Number NPF-3 Serial Number 1-1463 , Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by FENOCs Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only for information and are not regulatory commitments. Please notify the Manager -

Regulatory Compliance (419-321-8585) at the DBNPS of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None. Serial 1-1463 contains no new commitments. NIA