Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12130A062 + (Additional Joint Report on Availability for Prehearing Conference)
- ML23019A152 + (Additional LOCA Analysis V2)
- ML11293A367 + (Additional License Conditions Pages - Issuance of Amendments Regarding Extended Power Uprate)
- ML072900427 + (Additional Limited Appearance Statement of Sally Shaw)
- ML18198A393 + (Additional Materials for July 10, 2018 NFPA 805/FPRA FAQ Meeting)
- RS-02-005, Additional Mechanical Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation + (Additional Mechanical Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation)
- RS-02-014, Additional Mechanical Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation + (Additional Mechanical Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation)
- LIC-02-0091, Additional Mitigative Measures to Fulfill Requirements of Interim Safeguards and Security Compensatory Measures Order Requirement B.2(a)2 from Omaha Public Power District + (Additional Mitigative Measures to Fulfill Requirements of Interim Safeguards and Security Compensatory Measures Order Requirement B.2(a)2 from Omaha Public Power District)
- ML20142A289 + (Additional NEI Comments on RG 1.187 Rev 2 Prior to ACRS Meeting on May 20, 2020 (E-Mail))
- ML050700281 + (Additional NRC Letter Transmitting Certificates (Folder 1))
- ML18180A319 + (Additional NRC Staff Comments on Fpra FAQ 18-0017 - Conditional Trip Probability for Modeling Operator Discretion - 06/27/2018)
- ML16019A061 + (Additional NRC Staff Comments on MSA Template and Example -Transmittal Email 2016-01-15)
- ML19266A640 + (Additional NextEra Non-Disclosure Affidavits)
- ML25028A013 + (Additional Notes for Non-Federal Representatives)
- ML25253A489 + (Additional Observation for HI-STAR 330 for CoC No. 9397, Model Number HI-STAR 330)
- ML031360600 + (Additional Open Item Regarding a Pressurizer Weld Repair at Fort Calhoun Station, Unit 1)
- ML072150363 + (Additional Oregon State University Response to RAI Regarding License Renewal, Oregon State University Triga Reactor Dated May 21, 2007)
- ENS 46965 + (Additional Penetration Identified for Mitigation During Walkdown)
- ML053390048 + (Additional Petitioners Declarations)
- ML12053A019 + (Additional Planned Fire Risk Reduction Modifications)
- ML25272A274 + (Additional Post Exam Comments)
- ML040210004 + (Additional Post Examination Comments for the Prairie Island Initial Examination - September 2003)
- ML101300348 + (Additional Preliminary RAIs (Relating to Fire Protection) for FSAR Chapter 14)
- ML052660267 + (Additional Proposed Changes for Technical Specification to Revise Frequency for Tadot of P-4 Interlock)
- ML20029D164 + (Additional Protocol No Changes Report for Reporting Year 2019 San Onofre Nuclear Generating Station (SONGS) Unit 2)
- 2CAN011202, Additional Protocol Report + (Additional Protocol Report)
- ML22277A422 + (Additional Question for Es About WTB Sample Judgmental 16)
- ML080880475 + (Additional Question on the Proposed Recirculation Riser Differential Pressure Amendment)
- 0CAN019160, Additional Questions Associated with Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-Basis External Events + (Additional Questions Associated with Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-Basis External Events)
- ML062850056 + (Additional Questions Draft RAI on Amendment for Kewaunee Tornado Design Basis)
- ML023650196 + (Additional Questions Re 11/15/02 Amendment Request)
- ML20127H446 + (Additional Questions Regarding Sims Potential Transfer of Control March 25, 2020)
- L-03-008, Additional Questions Related to Supplemental Blasts & Explosions Responses to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application + (Additional Questions Related to Supplemental Blasts & Explosions Responses to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application)
- ML100980009 + (Additional Questions from the Containment and Ventilation Branch on the Proposed EPU Amendment)
- ML113130261 + (Additional Questions/Comments on the Monitoring Program, Documentation, Etc)
- ML19309F875 + (Additional RAI 2-9 for the Review of the Model No. HI-STAR 180 D Package)
- ML091740761 + (Additional RAI Question on GSI-191/GL 2004-02 Resulting from June 22, 2009, Phone Call)
- ML20042C425 + (Additional RAI Responses from DOE for Draft Wir Evaluation for WMA-C)
- ML101540003 + (Additional RAI for LaSalle AST)
- ML25093A072 + (Additional RAI for License Amendment to Add New Building to the Psu SNM License)
- ML101540001 + (Additional RAI for NETCO-Rack-Inserts LAR)
- ML101380525 + (Additional RAI for Ultimate Heat Sink License Amendment Request (ME1669-70))
- ML23201A126 + (Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support)
- ML091330131 + (Additional RAIs to Support LaSalle LAR to Revise LPRM Calibration Frequency (MD9415, MD9415))
- 2CAN041303, Additional Reactor Vessel Closure Head Weld Request for Alternative ANO2-ISI-004 Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations + (Additional Reactor Vessel Closure Head Weld Request for Alternative ANO2-ISI-004 Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations)
- ML16328A118 + (Additional Recommendations on the Development of De Minimis Level)
- NL-07-1179, Additional Request Regarding the NRC Approval Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays + (Additional Request Regarding the NRC Approval Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays)
- ML082210454 + (Additional Request for Additional Information BWROG Licensing Topical Report (LTR) NEDO-33349, Revision 1, BWR Application to Regulatory Guide 1.97 Revision 4)
- ML091280095 + (Additional Request for Additional Information Regarding Amendment to Lower the Minimum Allowed Level of the Ultimate Heat Sink Main Reservoir)
- ULNRC-06625, Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs + (Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs)
- EPID:L-2020-LLE-0242 + (Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs)