Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 01/31/2012 |
From: | Pyle S Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2CAN011202 | |
Download: ML12032A272 (5) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Letter type:
MONTHYEAR0CAN102401, Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzle2024-10-16016 October 2024
[Table view]Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 2CAN102401, Cycle 31 Core Operating Limits Report (COLR)2024-10-14014 October 2024 Cycle 31 Core Operating Limits Report (COLR) 1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 1CAN072402, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2024-08-13 Category:Report MONTHYEARML24295A1232024-10-21021 October 2024
[Table view]Enclosure 3: Relief Request ANO2-RR-24-001, Revision 0 (Non-Proprietary) 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version2023-06-20020 June 2023 Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version ML23088A2172022-12-31031 December 2022 Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-02-24024 February 2022 Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis2021-10-0606 October 2021 Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment 2CAN062103, Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval2021-06-29029 June 2021 Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval 0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes2021-05-10010 May 2021 Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values2020-03-19019 March 2020 Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values 0CAN121901, Summary of Lost Specimens Investigation Report2019-12-0303 December 2019 Summary of Lost Specimens Investigation Report ML18215A1782018-06-30030 June 2018 WCAP-18169-NP, Rev 1, Arkansas Nuclear One Unit 2 Heatup and Cooldown Limit Curves for Normal Operation. ML17214A0292018-02-12012 February 2018 Staff Assessment of Flooding Focused Evaluation (CAC Nos. MF9809 and MF9810) ML17291A0092017-10-26026 October 2017 Staff Assessment Regarding Program Plan for Aging Management for Reactor Vessel Internals (CAC No. MF8155; EPID L-2016-LRO-0001) ML17236A1792017-08-22022 August 2017 Arkansas, Units 1 and 2, ANO Emergency Plan On-Shift Staffing Analysis Report, Revision 2 0CAN081703, Document 51-9257562-001, Revision 1, Arkansas Nuclear One Hfe - High Frequency Confirmation Report2017-08-16016 August 2017 Document 51-9257562-001, Revision 1, Arkansas Nuclear One Hfe - High Frequency Confirmation Report ML17167A0832017-06-28028 June 2017 Arkansas Nuclear One, Unit 2 - Review of Commitment Submittal for License Renewal Regarding Nickel-Based Alloy Aging Management Program Plan (CAC No. MF8154) 0CAN061701, Transmittal of 10 CFR 50.71(e) Report, Revision 17 of the ANO Fire Hazards Analysis2017-06-0707 June 2017 Transmittal of 10 CFR 50.71(e) Report, Revision 17 of the ANO Fire Hazards Analysis 0CAN051704, Engineering Report No. CALC-ANOC-CS-14-00017, Rev 0, 2017 Focused Evaluation for External Flooding at Arkansas Nuclear One.2017-03-13013 March 2017 Engineering Report No. CALC-ANOC-CS-14-00017, Rev 0, 2017 Focused Evaluation for External Flooding at Arkansas Nuclear One. 2CAN011703, Submittal of Additional Protocol Report2017-01-26026 January 2017 Submittal of Additional Protocol Report ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 0CAN121602, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 32016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 3 ML17003A2902016-12-20020 December 2016 Areva, Inc. - Engineering Information Record - Arkansas Nuclear One HFE-High Frequency Confirmation Report ML16365A0272016-10-31031 October 2016 ANP-3486NP, Revision 0, MRP-227-A Applicant/Licensee Action Item 6 Analysis for Arkansas Nuclear One Unit 1 (ANO-1). ML16293A5842016-09-30030 September 2016 WCAP-18166-NP, Revision 0, Analysis of Capsule 284 from the Entergy Operations, Inc. Arkansas Nuclear One, Unit 2 Reactor Vessel Radiation Surveillance Program. 1CAN091601, Submittal of Initial Examination Completion of Post-Examination Analysis2016-09-0101 September 2016 Submittal of Initial Examination Completion of Post-Examination Analysis ML16202A1672016-07-0505 July 2016 Report 1500227.401, PWR Internals Aging Management Program Plan. ML16147A3242016-05-31031 May 2016 ANP-3417NP, Rev. 1, MRP-227-A Applicant/Licensee Action Item #7 Analysis for Arkansas Nuclear One, Unit 1. ML16004A1792015-12-31031 December 2015 Attachment 2, ANP-3418NP, Revision 0, Arkansas Nuclear One Unit 1 Reactor Vessel Internals License Renewal Scope and MRP-189, Revision 1 Comparison (MRP-227-A Action Item 2) Licensing Report. (Non-Proprietary) ML15278A0242015-09-28028 September 2015 Attachment 2, Areva Document ANP-3417NP, Revision 0, MRP-227-A Applicant / Licensee Action Item No. 7 Analysis for Arkansas Nuclear One, Unit 1 (Non-Proprietary), Attachment 3, Affidavit, and Attachment 4, List of Commitments ML15099A1522015-04-16016 April 2015 Review of Spring 2014 Steam Generator Tube Inspection Report, Inspection During Refueling Outage 2R23 ML15071A0552015-03-31031 March 2015 ANP-3300Q2NP, Revision 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1. ML15086A0242015-03-25025 March 2015 ANP-3300Q3NP, Revision 0 to Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1 (Non-Proprietary 2024-07-02 Category:Miscellaneous MONTHYEARCNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021
[Table view]Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L 0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes2021-05-10010 May 2021 Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1442021-03-22022 March 2021 Strategy 6 ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values2020-03-19019 March 2020 Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values 0CAN121901, Summary of Lost Specimens Investigation Report2019-12-0303 December 2019 Summary of Lost Specimens Investigation Report ML17214A0292018-02-12012 February 2018 Staff Assessment of Flooding Focused Evaluation (CAC Nos. MF9809 and MF9810) ML17291A0092017-10-26026 October 2017 Staff Assessment Regarding Program Plan for Aging Management for Reactor Vessel Internals (CAC No. MF8155; EPID L-2016-LRO-0001) ML17167A0832017-06-28028 June 2017 Arkansas Nuclear One, Unit 2 - Review of Commitment Submittal for License Renewal Regarding Nickel-Based Alloy Aging Management Program Plan (CAC No. MF8154) 2CAN011703, Submittal of Additional Protocol Report2017-01-26026 January 2017 Submittal of Additional Protocol Report ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 0CAN121602, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 32016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 3 ML17003A2902016-12-20020 December 2016 Areva, Inc. - Engineering Information Record - Arkansas Nuclear One HFE-High Frequency Confirmation Report 1CAN091601, Submittal of Initial Examination Completion of Post-Examination Analysis2016-09-0101 September 2016 Submittal of Initial Examination Completion of Post-Examination Analysis ML16147A3242016-05-31031 May 2016 ANP-3417NP, Rev. 1, MRP-227-A Applicant/Licensee Action Item #7 Analysis for Arkansas Nuclear One, Unit 1. ML15099A1522015-04-16016 April 2015 Review of Spring 2014 Steam Generator Tube Inspection Report, Inspection During Refueling Outage 2R23 ML15086A0242015-03-25025 March 2015 ANP-3300Q3NP, Revision 0 to Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1 (Non-Proprietary ML15043A1032015-02-10010 February 2015 Areva Document ANP-3383NP, Response to Request for Additional Information for the Reactor Pressure Vessel Internals Aging Management Program Plan for Arkansas Nuclear One Unit 1 0CAN021501, Spent Fuel Storage Radioactive Effluent Release Report for 20142015-02-0303 February 2015 Spent Fuel Storage Radioactive Effluent Release Report for 2014 ML15028A4932015-01-31031 January 2015 ANP-3281Q1NP, Rev. 0, Response to NRC Request for Additional Information on Time-Limited Aging Analysis for the ANO-1 Reactor Vessel Internals, Attacment 2 ML14329A4262014-10-22022 October 2014 U.S. Nuclear Regulatory Commission, Record of Review, Arkansas Nuclear One Unit 2 (ANO-2), LAR Attachment V-Table V-1 Fire PRA Facts and Observations (F&Os). ML14223A8032014-08-12012 August 2014 Review of Steam Generator Tube Inspection Report for Refueling Outage 1R24 0CAN031404, ANO, Units 1 & 2 - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Nttf)Review of Insights from the Fukushima2014-03-28028 March 2014 ANO, Units 1 & 2 - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Nttf)Review of Insights from the Fukushima Da ML14051A1882014-03-18018 March 2014 Staff Assessments of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0090-MF0091) 0CAN021403, Units 1 and 2 - 10 CFR 50.59 Summary Report and Commitment Change Summary Report2014-02-11011 February 2014 Units 1 and 2 - 10 CFR 50.59 Summary Report and Commitment Change Summary Report ML14028A1992014-01-16016 January 2014 Units 1 and 2, Unsatisfactory Blind Quality Assurance Drug Testing Samples 2CAN091302, Updated Seismic Walkdown Report2013-09-30030 September 2013 Updated Seismic Walkdown Report 1CAN031305, Cycle 24 COLR, Revision 62013-03-13013 March 2013 Cycle 24 COLR, Revision 6 ML12159A5972012-06-18018 June 2012 Closeout of NRC Bulletin 2011-01, Mitigating Strategies 0CAN021204, Units 1 and 2, Third Five-Year Surveillance of the First Ventilated Storage Cask2012-02-29029 February 2012 Units 1 and 2, Third Five-Year Surveillance of the First Ventilated Storage Cask 2CAN011202, Additional Protocol Report2012-01-31031 January 2012 Additional Protocol Report ML1130703872011-11-0202 November 2011 Fall 2011 RFO - Steam Generator Inspection Call - Part II, Summary of the ANO1 1R23 Steam Generator Inspection 2CAN091103, CFR 50.59 Summary Report2011-09-16016 September 2011 CFR 50.59 Summary Report 1CAN041105, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05 Relief Request ANO1-R&R-0162011-04-20020 April 2011 Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05 Relief Request ANO1-R&R-016 0CAN101003, 10 CFR 50.59 Summary Report and Commitment Change Summary Report2010-10-0707 October 2010 10 CFR 50.59 Summary Report and Commitment Change Summary Report 1CAN091001, 10 CFR 50.46 Report - Significant Change in Peak Cladding Temperature2010-09-0808 September 2010 10 CFR 50.46 Report - Significant Change in Peak Cladding Temperature 0CAN031001, Units 1 & 2, Unsatisfactory Laboratory Testing Report2010-03-18018 March 2010 Units 1 & 2, Unsatisfactory Laboratory Testing Report 2CAN011003, Submittal of Us Dept. of Commerce, Bureau of Industry and Security. Additional Protocol Report2010-01-28028 January 2010 Submittal of Us Dept. of Commerce, Bureau of Industry and Security. Additional Protocol Report 0CAN100901, Units 1 & 2, Unsatisfactory Laboratory Testing Report2009-10-13013 October 2009 Units 1 & 2, Unsatisfactory Laboratory Testing Report 0CAN050903, Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes2009-05-15015 May 2009 Annual 10 CFR 50.46 Report for Calendar Year 2008 Emergency Core Cooling System Evaluation Changes 2CAN100802, CFR 50.59 Summary Report for Period Ending October 6, 20082008-10-13013 October 2008 CFR 50.59 Summary Report for Period Ending October 6, 2008 2CAN070804, Cycle 20 Startup Report2008-07-0303 July 2008 Cycle 20 Startup Report 2021-05-10 |
Text
Entergy Operations, Inc.
1448 S.R. 333 SEntergy Russellville, AR .72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear One 2CAN01 1202 January 31, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
U.S. Additional Protocol Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
Dear Sir or Madam:
By letter dated February 10, 2009 (2CAN020902), Entergy transmitted forms for Arkansas Nuclear One, Unit 2 in support of the U.S. Additional Protocol per 10CFR75.1 1(c). This submittal provides a "no changes" report (AP-Q) which is attached.
There are no new commitments contained in this submittal. If you have any questions or require additional information, please contact me.
Sincerely, SLP/nbm
Attachment:
Additional Protocol Report 4oW
,~AIC
2CAN01 1202 Page 2 of 2 cc: Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS 0-8 BI One White Flint North 11555 Rockville Pike Rockville, MD 20852
Attachment to 2CAN011202 Additional Protocol Report
FORM APPROVED: OMB NO. 0694-0135 U.S. DEPARTMENT OF COMMERCE Bureau of Industry and Security Date (LeaveReceived Blank)
U.S. NUCLEAR REGULATORY COMMISSION Office of Nuclear Materials Safety and Safeguards ADDITIONAL PROTOCOL REPORT FORM AP-Q: NO CHANGES REPORT This No Changes Report form may only be used by your site to certify that the information reported in your last submitted Initial, Annual Update or Amended Report has not changed. If you did not submit an Initial, Annual Update, Amended, or a No Changes Report last year, you may not use this form.
Company or Organization Name: Entergy Operations, Inc.
Q2,, Site Name and Site Code:
Arkansas Nuclear One - Unit 2 (AP-XKR)
NOTE: The company name as well as the Site Name and Site Code reported in Questions Q.1 and Q.2 must be the same as those reported in Forms AP-A and AP-B of last year's Initial, Annual Update, or Amended CERTIFICATION I hereby certify that the information reported in last year's Initial, Annual Update, Amended or No Changes Report is unchanged for the reporting year listed in Question Q.5 below. To the best of my knowledge and belief, the submitted information is true
.and complete.
Name and title of responsible official (type or print):
Stephenie L. Pyle, Manager, Licensing Signature:/i
- Date Signed (MM-DD-YYYY): 1/31/2012
'REPORTING YEAR (YYYY): 2011
' ' , ..o ,
FORM AP-Q: No Changes Report Reporting requirements are set forth in 10 accuracy and completeness of the CFR Parts 75 and 110 of the U.S. Nuclear information submitted. The signature block Regulatory Commission (NRC) Regulations. must contain an original signature.
INSTRUCTIONS: Question (.4 Reporting Year Information:
Submit this No Changes Report form only to Provide the reporting year for which this No certify that the information reported in the Changes Report applies.
last submitted Initial, Annual Update, Amended or No Changes Report for your site has not changed. If you have not previously submitted a report, you may not
- usethis form.
- Ouestion 0.1Company or Organization Name: Provide the name of the company or organization that controls activities for this site., This should be the same company or organization name that was provided on Form AP-A of your last submitted Initial,
- Annual Update, Amended, or No Changes Report.
Question 0.2 Site Name and Site Code:
Provide the Site Name and Site Reporting Code of your site. The site name and site code must match those provided on the associated Form AP-B of your last
,submitted Initial or Annual Update Report.
Question 0.3 Certification: The report must be signed and dated by a company or o0rganization official who certifies the