From:
Goodwin, Cameron Sent:
Wednesday, June 02, 2010 3:13 PM To:
'ken.nicely@exeloncorp.com'
Subject:
LaSalle AST Per UFSAR Section 9.5.4.1.1 (Rev. 18), the usable diesel fuel volume required to support each Division 1 and 2 diesel generator continuous operation at rated load for 7 days is 32,200 gallons. Division 1 diesels will now be loaded above the continuous rating due to the load increase needed for the AST amendment. Provide a detailed discussion addressing how the EDG 7 day fuel supply requirement is satisfied as a result of this AST amendment.
Thank you, Cameron Mrs. Cameron Goodwin Division of Operating Reactor Licensing LaSalle Project Manager Phone: (301)415-3719 Email: Cameron.Goodwin@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
LaSalle AST Sent Date: 6/2/2010 3:12:02 PM Received Date: 6/2/2010 3:13:00 PM From: Goodwin, Cameron Created By: Cameron.Goodwin@nrc.gov Recipients:
ken.nicely@exeloncorp.com ('ken.nicely@exeloncorp.com')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10343 6/2/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: True
Return Notification: False Sensitivity: olNormal Recipients received: