MONTHYEARML11188A1452011-07-0101 July 2011 Request for License Amendment to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML11256A0302011-09-0202 September 2011 Supplement to Request for License Amendment to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement ML11255A0222011-09-13013 September 2011 Informs Licensee That Application for Amendment to Change Fire Protection Licensing Basis to NFPA 805 Is Acceptable for Review Project stage: Other ML1131204962011-11-0808 November 2011 Transmit Audit Plan for the Proposed Amendment Converting the Fire Protection Program to NFPA 805 Project stage: Other ML1131205002011-11-0808 November 2011 Audit Plan - D.C. Cook Proposed Amendment to Convert Fire Protection Program to NFPA 805 Project stage: Other ML1131302492011-11-0808 November 2011 E-mail Transmitting 4 NRC Staff Documents to Support the Audit of the Proposed Conversion of the Fire Protection Program to NFPA 805 Project stage: Other ML1131302592011-11-0808 November 2011 Questions and Issues to Be Addressed During the Audit Project stage: Other ML1131302602011-11-0808 November 2011 Questions and Comments About the Probabilistic Risk Analysis Project stage: Other ML1131302612011-11-0808 November 2011 Additional Questions/Comments on the Monitoring Program, Documentation, Etc Project stage: Other ML1131302622011-11-0808 November 2011 List of Plant Components for Walkdown Project stage: Other ML12017A2512012-01-27027 January 2012 RAI for the Proposed Amendment to Transition the Fire Protection Program to NFPA 805 Project stage: RAI ML1135607092012-01-27027 January 2012 Letter Transmitting an RAI on the Application for Amendment to Transition the Fire Protection Program to NFPA 805 Project stage: RAI AEP-NRC-2012-29, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-04-27027 April 2012 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI AEP-NRC-2012-58, Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-08-0909 August 2012 Response to Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI ML12230A3032012-08-14014 August 2012 Draft Redacted Second-round RAI Re NFPA 805 Amendment Project stage: Draft RAI ML12255A3952012-09-0606 September 2012 Redacted Draft Second-Round RAI the Proposed NFPA 805 Amendment Project stage: Draft Approval ML12276A3002012-10-11011 October 2012 RAI on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Standard 805 Project stage: RAI ML12285A1792012-10-11011 October 2012 D C Cook NFPA 805 RAI Project stage: Other AEP-NRC-2012-92, Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052012-10-15015 October 2012 Response to Second Round Request for Additional Information Regarding Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request ML12326A9982012-11-0909 November 2012 Response to Second-Round Request for Additional Information Item 54.b and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard 805 Project stage: Request ML12326A9992012-11-0909 November 2012 Donald C, Cook, Units 1 and 2 - Enclosure 1, 2 & 4 to AEP-NRC-2012-101, Response to Second-Round RAI Item 54.b, and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard Project stage: Request ML12326B0002012-11-0909 November 2012 Donald C, Cook, Units 1 and 2 - Enclosure 4 (Cont.) to AEP-NRC-2012-101, Response to Second-Round RAI Item 54.b, and Submittal of Revised Tables Re the Application for Amendment to Transition to National Fire Protection Association Standard Project stage: Request ML12345A3272012-12-13013 December 2012 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI ML13028A1132013-01-14014 January 2013 Response to Third Round Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request AEP-NRC-2013-09, Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-02-0101 February 2013 Revised Response to First Round Request for Additional Information Re Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Request ML13014A5492013-02-0101 February 2013 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI ML13085A1842013-04-22022 April 2013 Review and Conclusion of Indiana Michigan Power Companys Resolution of Facts and Observations in Support of DC Cooks Transition to NFPA 805 Project stage: Other ML13085A1902013-04-22022 April 2013 DC Cook Table U Record of Review March 22 2013 Project stage: Other ML13085A2462013-04-22022 April 2013 DC Cook Table V-1 & V-2 Record of Review March 22 2013 Project stage: Request AEP-NRC-2013-17, Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-05-0101 May 2013 Response to a Request for Additional Information (RAI 29.01, 61, and 62) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI AEP-NRC-2013-55, Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630)2013-06-21021 June 2013 Response to a Request for Additional Information Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 TAC (ME6629 and ME6630) Project stage: Response to RAI ML13210A2042013-09-0606 September 2013 Request for Additional Information on the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: RAI AEP-NRC-2013-75, Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 8052013-09-16016 September 2013 Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 Project stage: Response to RAI ML13140A3982013-10-24024 October 2013 Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805 Project stage: Approval 2012-08-14
[Table View] |
Similar Documents at Cook |
|---|
|
Text
DC Cook Site Audit (FM/Prog) 1 Monitoring Program We have the following questions regarding the process by which the monitoring program is being developed:
- 1. What process will be used for the review that will be conducted of the existing surveillance, testing, maintenance, compensatory measures, and oversight processes to consider the adequacy of scope and the performance criteria for availability and reliability, as discussed in Sections 4.6.1 and 4.6.2 of the CNP Transition Report?
- 2. What process will be used to identify systems and features relied upon to meet the requirements of Chapters 3 and 4 of NFPA 805 for ensuring their inclusion in the existing inspection, test, and system/program health programs? The answer should include how and whether optimization based on performance will be employed as discussed for Phase 1 of the NFPA monitoring program in Section 4.6.2 of the CNP Transition Report.
- 3. What process will be used to determine whether Phase 2 of the monitoring program development, as described in the CNP Transition Report, will include reviews of other analysis units that are not risk significant but are included based on plant specific history or operational considerations?
- 4. What process will be used in Phase 3 of the monitoring program to determine whether failure criteria will be established either by an expert panel or by an evaluation based on assumed level of performance, as discussed in Section 4.6.2 of the CNP Transition Report?
- 5. In Phase 4 of the NFPA monitoring program as discussed in Section 4.6.2 of the CNP Transition Report, does the appropriate CNP process for establishing action plans refer to the existing corrective action program?
- 6. Will the periodic assessment of the NFPA monitoring program discussed in Section 4.6.2 of the CNP Transition Report include both internal and external assessments, and at what frequency will these assessments be performed?
Program Documentation What specific documents will comprise the post transition NFPA 805 fire protection program licensing basis as discussed in section 4.7 of the CNP Transition Report?
Configuration Control What changes are anticipated to the CNP configuration control processes to incorporate the requirements of the NFPA 805 fire protection program as discussed in section 4.7.2 of the CNP Transition Report?
Fire Protection Program Manual What changes are anticipated to the Fire Protection Program Manual as a part of the NFPA 805 transition process, including associated training and identification of the recipients of any such training necessary to support the program changes?
DC Cook Site Audit (FM/Prog) 2 Fire Protection Quality Assurance What changes are anticipated to the existing Fire Protection Quality program as a part of the NFPA 805 transition process?
Fire Protection Program Audits Where will requirements for periodic assessments (audits) of the fire protection program reside in the NFPA 805 program documentation and how are these requirements anticipated to differ from current audit requirements regarding procedures for reviews of fire protection program-related performance and trends?
Fire Protection Program Quality Assurance Will NFPA Section 2.7.3, Quality requirements applicable to reviews, verification and validation of calculational models or numerical methods, limitations of use for engineering methods and models, qualifications of users for engineering analyses and numerical models, and uncertainty analyses be applied for all future such actions related to the NFPA 805 fire protection program?
Fire Modeling
- 1. Fire modeling in support of the DC Cook LAR was performed by EPM. FMDB - Transient Analysis Worksheets, a fire modeling toolkit developed by EPM, was used in lieu of FIVE and FDTs.
- a. Why and how did EPM develop FMDB - Transient Analysis Worksheets?
- b. How was FMDB - Transient Analysis Worksheets verified and validated?
- c. It is stated in the documents on the portal that V&V was based on comparison between calculated results from FMDB - Transient Analysis Worksheets and the results from corresponding routines in FIVE and FDTs. However, this does not mean that the models were used within their range of validity.
- 2. How was the uncertainty of the results obtained from calculations with FMDB - Transient Analysis Worksheets determined?
- 3. We would like to review in detail the fire modeling that involved the use of FLASH-CAT to estimate the heat release rate and flame spread of cables in trays.