Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117H559 + (1RE06 ISI Summary Rept for Repairs & Replacements STP Generating Station,Unit 1)
- ML20117H541 + (1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Generating Electric Generating Station,Unit 1)
- ML20134B914 + (1RE06 ISI Summary Rept for Welds,Sg Tubes & Component Supports of STP Electric Generating Station Unit 1)
- ML20197C355 + (1RE07 ISI Summary Rept for SG Tubing of STP Electric Generating Station for Unit 1)
- ML20199L715 + (1RE07 ISI Summary Rept for Sys Pressure Test (Class 1 & 2) for STP Electric Generating Station, Unit 1)
- ML20202D156 + (1RE07 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1)
- ML20210D482 + (1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1)
- ML20216D748 + (1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1)
- NOC-AE-07002143, 1RE13 Inservice Inspection Summary Report for Steam Generator Tubing + (1RE13 Inservice Inspection Summary Report for Steam Generator Tubing)
- ML071140087 + (1RE13 Inservice Inspection Summary Report for Steam Generator Tubing)
- NOC-AE-08002346, 1RE14 Inspection Summary Report for Steam Generator Tubing + (1RE14 Inspection Summary Report for Steam Generator Tubing)
- ML082820569 + (1RE14 Inspection Summary Report for Steam Generator Tubing)
- NOC-AE-16003364, 1RE19 Inspection Summary Report for Steam Generator Tubing + (1RE19 Inspection Summary Report for Steam Generator Tubing)
- ML16125A248 + (1RE19 Inspection Summary Report for Steam Generator Tubing)
- ML20006A757 + (1REO1 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project Electric Generating Station,Unit 1)
- ML20199L700 + (1REO7 ISI Summary Rept for Repairs & Replacements of STP Electric Generating Station - Unit 1)
- ML031910124 + (1RF012-EPRI Appendix H Eddy Current Technique Qualification)
- ML20236T993 + (1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830)
- ML24235A196 + (1RR06 Official RCI L-2024-LLR-0033)
- ML20261B491 + (1ST FLOOR,2ND Floor and Enlarged Plans, as-built)
- ML21238A021 + (1Summary of Closed Call to Discuss Revised Responses to Requests for Additional Information for the U.S. Nuclear Regulatory Commission Review of Holtec Decommissioning International Topical Report HI-2200750, Rev 0, Holtec Spent Fuel Pool)
- ML21137A284 + (1_AN2-2021-03 Draft Outlines)
- ML22214A599 + (1_CNS-2022-06 Draft Outlines)
- ML20042C426 + (1_Email from Marcel Bergeron Information Request on Consistency Between Cpgwm and the Local-scale PA Model)
- ML22354A249 + (1_RBS-2022-12 Outlines Draft)
- ML23150A028 + (1a - Background)
- ML23150A029 + (1b - Japanese Research)
- ML13289A203 + (1e.iii.3.1, Sequoyah Nuclear Plant (SQN) TN5 64-002-0504-Required Actions from March 30, 2009 Division of Solid Waste Management Compliance Evaluation Inspection)
- ML040840628 + (1pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Power Operating Co. to Discuss Licensee Performance and Planned Activities as Part of the IMC 0350 Process)
- ML18204A185 + (1st Amended Complaint 10-11-2016 (2))
- ML060590533 + (1st Quarter 2003 & 4th Quarter 2002 Survey Comments)
- ML14209A935 + (1st Quarter 2014 Performance Review)
- DCL-2025-515, 1st Quarter 2025 Report on Discharge Self-Monitoring + (1st Quarter 2025 Report on Discharge Self-Monitoring)
- ML24018A242 + (1st Quarter FY2024 Email Update Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
- ML25030A044 + (1st Quarter FY2025 Email Update Re Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
- ML011570508 + (1st Review Checklist)
- ML012320005 + (1st Review Checklist)
- ML011580396 + (1st Review Checklist for Acceptance Review for Ssd 00-047)
- ML011830019 + (1st Review Checklist for Ssd 01-033)
- ML23018A153 + (1st Set of Request for Additional Information Regarding Framatome Topical Report, ANP-10350P, Revision 0, Framatome Methodology for Boiling Water Reactors: Evaluation and Validation of Apollo2-A/ARTEMIS-B (EPID L-2022-TOP-0038) - Letter)
- ML21160A245 + (1st Town Hall Meeting - on Vendor Supplier Oversight - Regulatory Alternatives for Supplier Oversight During Exigent Conditions)
- ML21160A241 + (1st Town Hall Meeting on Vendor Oversight - Design Control: Importance of Adherance to the Requirements in the Procurement Specifications)
- PMNS20210419, 1st Town Hall Meeting on Vendor Oversight + (1st Town Hall Meeting on Vendor Oversight)
- ML19298C592 + (1to Updated Final Safety Analysis Report, List of Effective Pages)
- ML18193A733 + (2)
- ML21217A113 + (2 - 2021 Crpk MOU - Clean Version for Signatures)
- ML25293A458 + (2 - Control of Heat Generation)
- ML25260A530 + (2 - Enclosure 1 - 2023 License Renewal Safety Evaluation Report (Public))
- ML24152A180 + (2 - Enclosure 1 - Special Nuclear Materials-362 License Renewal Safety Evaluation Report - Public)
- ML25280A085 + (2 - Lmp Overview)
- ML21167A127 + (2 - Lmp for Operating Reactors)