Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17227A435 +
- Press Release-92-086, NRC Issues Revised Policy Statement on NRC Review of Agreement State Programs +
- Press Release-92-085, Informing That Nuclear Regulatory Commission Has Received Two letter-type Reports from Its Advisory Committee +
- 05000311/LER-1992-008-01, :on 920501,MSL Isolation Occurred on Low Temp Causing Sys to Trip.Caused by Design,Manufacturing, Construction & Installation inadequacy.On-going Assessment & Design Mod in Progress +
- ML18153D018 +
- ML20101N726 +
- ML20101N712 +
- ML20101G595 +
- ML20101G588 +
- ML20101G585 +
- ML20101G581 +
- ML20101G427 +
- ML20101E264 +
- ML20101B755 +
- ML20099G874 +
- ML20098E194 +
- ML20098E174 +
- ML20098E170 +
- ML20098E168 +
- ML20098E158 +
- ML20098E005 +
- ML20098D996 +
- ML20097H188 +
- ML20097D945 +
- ML20097C227 +
- ML20097A546 +
- ML20097A391 +
- ML20097A380 +
- ML20097A359 +
- ML20097A347 +
- NRC-92-0067, Forwards Rev 19 to Physical Security Plan.Rev Withheld +
- ML20127D126 +
- ML20127C538 +
- ML20125B702 +
- ML20207F785 +
- ML20266A725 +
- TAC:M77640 +
- TAC:M83076 +
- ML20141C175 +
- ML20140F530 +
- HL-2229, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-08 & 50-366/92-08.Corrective Actions:Design Change Request 92-075 Implemented to Install Jumpers Around Thermal Overload Devices of 12 Unit 1 motor-operated Valves +
- HL-2204, Submits Proposed Schedule for Addressing Items in App a of Se, ,of Second 10-yr Insp Insp Interval,Per 920416 Telcon W/Nrc.Response/Revised Relief Request for Table 1 & 2 Items Will Be Submitted by 920605 +
- 3F0592-15, Rev 2 to TS Change Request 165,correcting TS Index Pages & Section 6.9.2, Special Repts Re Fire Svc Sys +
- TAC:M83724 +
- RBG-36895, Responds to Violations Noted in Insp Rept 50-458/92-08 on 920301-0411.Corrective Actions:Change Notices Initiated to Require Appropriate Sections of Maint Lifting Procedures to Be Completed Prior to Performing Surveillance Tests +
- TAC:M68584 +
- 0CAN059206, Comment Supporting Proposed Rule Re Elimination of Requirements Marginal to Safety +
- U-601984, Revised Response to Violations Noted in Insp Rept 50-461/91-23.Corrective Actions:Existing Monitor Should Be Replaced W/New Fission Product Monitor +
- PY-CEI-NRR-1497, Forwards Plant Mod & Procedure Changes Re Implementation of Staff Recommendations to Conform W/Station Blackout Rule Per 10CFR50.63 +
- ML20262G633 +