ML20098E194
| ML20098E194 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/28/1992 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20098E191 | List: |
| References | |
| NUDOCS 9206020020 | |
| Download: ML20098E194 (4) | |
Text
.
11101 1 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 4
SECTION PAGE 3/4.2 POWER DISTRIBUTION LIMill 3/4.2.1 AXIAL POWER IMBALANCE 3/4 2-1 3/4.2.2 NUCLEAR HEAT FLUX HOT CHANNEL FACTOR -F 3/4 2-4 n
3/4.2.3 hUCLEAR ENTHALPY RISE HOT CHANNEL FACTOR -F" 3/4 2-6 AH 3/4.2.4 QUADRANT POWER TILT 3/4 2-8 3/4.2.5 DNB PARAMETERS 3/4 2-12 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSlEM INSTRUMENTATION 3/4 3-1 3/4.3.2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTkJMENTATION' 3/4 3-9 3/4.3.3 MONITORING INSTRUMENTATION Radiation Monitoring Instrumentation 3/4 3-22 Incore Detectors 3/4 3-26 Seismic Instrumentation 3/4 3-28 Meteorological - Instrumentation 3/4 3-3I Remote Shutdown Instrumentation 3/4.3-34 Post-accident instrumer.tation 3/4 3-37 Waste Gas Decay Tank - Explosive Gas Monitoring Instrumentation 3/4 3-53 Toxic Gas System
- Chloride Detection 3/4 3-55
- Sulfur Dioxide Detection 3/4 3-56 CRYSTAL RIVER - UNIT 3 IV Amendment No.
$0 kDo!
0 0
$2 P
INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION
__PAGE
~
3/4.7 PLANT SYSTEMS 3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION 3/4 7-13 3/4.7.3 CLOSED CYCLE COOLING WATER SYSTEM Nuclear Services Closed Cycle Cooling System 3/4 7-14 Decay Heat Closed Cycle Cooling Water System 3/4 7-15 3/4.7.4 SEA WATER SYSTEM Nuclear Services Sea Water System 3/4 7-16 Decay Heat Sea Water System 3/4 7-17
)
3/4.7.5 ULTIMATE HEAT SINK 3/4 7-18 3/4.7.6 FLOOD PROTECTION 3/4 7-19 3/4.7.7 CONTROL ROOM EMERGENCY VLHTILATION SYSTEM-3/4 7-20 3/4.7.8 AUXILIARY BUILDING VENTILATION EXHAUST SYSTEA 3/4 7-23 3/4.7.9 HYDRAULIC SNUB 8ERS 3/4 7-25 3/4.7.10 SEALED SOURCE CONTAMINATION 3/4 7-35 3
3/4.7.11 DELETED 3/4.7.12 DELETED 3/4.7.13 RADI0 ACTIVE WASTE SYSTEMS Waste Gas Decay Tanks 3/4 7-48 Waste Gas Decay Tank - Explosive Gas Mixture 3/4 7-54 1
4 CRYSTAL RIVER - UNIT 3 VII Amendment No.
,.s_As.m.
_-. ~
J JJ~..A o.a-,.m e..24,.n 2WhW 4-E 4
A..
..W.h
,4d 4
3,ee.4 m_-.a J
-44a..d
.J.
2
.a i
0 0
BASES SECTION PAGE' 3.4.6 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE B 3/4 7-1 3/4.7.2:
STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION
. B 3/4 7.-3 3/4.7.3 CLOSED CYCLE COOLING WATER SYSTEM B 3/4 7-3 3/4.7.4 SEA WATER SYSTEM B3/4-7-3 3/4.7.5 ULTIMATE HEAT SINK
-B 3/4 7-4 3/4.7.6 FLOOD PROTECTION B 3/4.7-4 3/4.7.7 CONTROL R00M EMERGENCY VENTILATION SYSTEM B 3/4 7-4 3/4.7.8 AUXILIARY BUILDING VENTILATION EXHAUST-SYSTEM-
' B 3/4.7-5 3/4.7.9 HYDRAULIC SNUBBERS.
B 3/4 7-5 3/4.7.10' SEALED-SOURCE CONTAMINATION B3/4'7-6 3/4.7.11 DELETED 3/4.7.12 DELLTED 3/4.7.13.1 WASTE GAS DECAY TANKS'
- B 3/4 7-7' 1
3/4.7.13.2' DELETED 3/4.7.13.3 DELETED 3/4.7 13.4 DELETED
- 3/4.7.13.5 EXPLOSIVE GAS MIXTURE B 3/4 7-8 i
- j L
' CRYSTAL RIVER - UNIT 3 XII
' Amendment No.
- u..-
ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Director of the Office of Inspection and Enforcement, Region II, within the time period specified for each report. These reports shall be submitted covering the activities identified below. A separate Licensee E;/ent Report, when required by 10 CFR 50.73,a), need not be submitted if the Special Report meets the requirements of 10 CFR 50.73(b) in addition to the requirements of the applicable referenced Specification, a.
ECCS Actuation, Specification 3.5.2 and 3.5.3.
b.
Inoperable Seismic Monitoring Instrumentation, Specification 3.3.3.3.
c.
Inoperable Meteorological Monitoring Instrumentation Specification 3.3.3.4.
d.
Seismic event analysis, Specification 4.3.3.3.2.
e.
Deleted.
f.
Specific Activity, Specification 3.4.8.
g.
Results of Steam Generator Tube Inspection. Specification 4.4.5.5.b.
h.
Deleted.
- i. Deleted.
J.
Deleted.
k.
- Deleted, j
l.
Deleted.
m.
Deleted.
n.
Deleted.
o.
Deleted.
I i
CRYSTAL RIVER - UNIT 3 6-17 Amendment No.