Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17221A600 +
- ML17261A788 +
- ML17261A785 +
- ML18022A615 +
- ML18022A609 +
- ML20148U164 +
- ML20148T941 +
- IR 05000369/1988001 +
- ML20148S943 +
- IR 05000373/1987035 +
- ML20148S082 +
- ML20148R398 +
- ML20148R337 +
- ML20148R153 +
- ML20148Q953 +
- NRC-87-0248, Application for Amend to License NPF-43,revising Tech Spec Sections 3/4.6.1 & 3/4.6.5 to Allow Closure Mechanisms for Primary & Secondary Containment Penetrations Located in Locked High Radiation Areas to Be Verified Closed.Fee Paid +
- NRC-87-0202, Application for Amend to License NPF-43,changing Tech Specs 3/4.8.3.1 & 3/4.8.3.2 to Clarify Limiting Condition for Operation of 480 Volt MCC 72CF Swing Bus.Fee Paid +
- ML20148P457 +
- ML20148H929 +
- ML20133C202 +
- ML20149L915 +
- ML20149J885 +
- ML20149F037 +
- ML20149E963 +
- ML20149E592 +
- ML20149E314 +
- ML20149D933 +
- IR 05000312/1987046 +
- ML20196C055 +
- ML20196B466 +
- ML20196B427 +
- ML20196A566 +
- ML20196A552 +
- ML20196A480 +
- ML20196A237 +
- ML20196A186 +
- ML20195K202 +
- ML20195J624 +
- ML20195J617 +
- ML20195J508 +
- ML20195J489 +
- ML20195J381 +
- ML20207A670 +
- ML20266C085 +
- ML20265D607 +
- ML20195J372 +
- NL-88-113, Forwards Updated NRC Open Item Closure Schedule & Summary Status.Weekly Updates Will Be Provided Until Restart +
- FVY-88-006, Requests That Sser Be Issued to Correct Two Typos, Incorporate RELAP5/MOD1 Updates & Incorporate Addl Info Re Huxy Code.Completion of Code Reviews Requested by 880404. Encl Radiation View Factors Withheld (Ref 10CFR2.790) +
- W3P88-0020, Forwards Revised Figure 5-1A of Util Emergency Plan,Per Telcon Between Fj Englebracht & CA Hackney.Figure Reissued W/Designation Draft Copy Removed +
- W3P88-0003, Discusses Status of post-accident Sampling Sys (Pass). Solenoid Valves Selected for Design Showing Failure to Seat Properly,Causing Disruption of RCS Degasification Portion of Pass.Valves Will Be Maintained in Interim +