ML20196C055

From kanterella
Jump to navigation Jump to search
Submits Revised Agenda for CRGR Meeting 128 on 880127.W/o Stated Encls
ML20196C055
Person / Time
Issue date: 01/26/1988
From: Jordan E
Committee To Review Generic Requirements
To: Bernero R, Martin T, Ross D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
NUDOCS 8802120228
Download: ML20196C055 (2)


Text

'o,,

UNITED STATES p,

NUCLE AR REGULATORY COMMISSION g

J W ASHING TON, D. c. 20$$$

$,[,,, /

REVISED AGENDA January 26, 1988 MEMORANDUM FOR:

Robert M. Bernero, NMSS Thomas T. Martin, RI Denwood F. Ross, RES Joseph Scinto. 0GC James H. Sniezek, NRR FROH:

Edward L. Jordan, Chairman Committee to Review Generic Requirements 1

SUBJECT:

CRGR MEETING NO. 128 The Committee to Review Generic Requirements (CRGR) will meet on Wednesday, January 27, 1988, 1-5 p.m. in Room 6507 MNBB.

The agenda is as follows:

1-2 p.m.

L. Shao, NRR, will present for CRGR review a proposed Generic Letter imposing new staff positions interpreting the intent of 10 CFR 100, Appendix A with regard to exceedance of the Operating Basis Earthquake (0BE).

(Review package is enclosed.)

2-3 p.m.

L. Shao, NRR, will present for CRGR review a proposed NRC Bulletin on steam generator tube rupture.

(Review package will be forwarded to members under separate cover when available.)

3-4 p.m.

S. Crockett, OGC, will brief the CRGR on applicability of 10 CFR 50.54f to Part 21 proposed amendments.

4-5 p.m.

E. Rossi, NRR, will present for CRGR review a porposed RRC Bulletin on Reactor Trip Breaker RTB mechanical failure problems.

(Review package is enclosed.)

5 p.m.

The final item to be considered by the Committee at this meeting is a proposed rule change to delete a 30 day scheduling link between the annual physical fitness test and preceding medical examination given to all armed security personnel at operating nuclear plants.

Due to the minor significance of this proposed change, a formal presentation to CRGR by the sponsoring office (RES) is not considered necessary on this item.

(Review package is enclosed.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure

[I that an alternate, who is approved by the CRGR Chairman, attends the meeting.

y j

r 1)1 h )11 88o212o22e 8eo126 PDR REVOP NROCRO J

m January 20, 1988

.=

Persons making presentations to the CRGR are responsible for (1) atsuring that the information required for CRGR review is provided to the Committee (CRGR Charter - IV.8), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presenta-ion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentation.

Division Directors or higher managereent should attend meetings addressing agenda items under their purview.

In accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning "Forwarding of CRGR Documents to the Public Doctment Room (PDR)," the enclosure, which contains predecisional information, will not be released to the POR until the NRC has considered (in a public forum) or decided the matter addressed by the infomation.

BrigirJ 5p.3 Sys e O Wasn Edward L. Jordan, Chairman Committee to Review Generic Requirements

Enclosures:

As stated cc w/ enclosures: SECY V. Stello, Jr.

cc w/o enclosures:

Commission (5) J. Lieberman S. Ebneter W. Mcdonald i

Regional Administrators W. Parler L. Shao G. Arlotto E. Rossi Distribution:

E. Jordan J. Heltemes J. Conran C. Sakenas R. Fraley B. Doolittle CRGR CF (w/o enc.) CRGR SF S. Treby (w/o enc.) T. Rehm (w/o enc.) J. Johnson, OEDO PDR (NRC/CRGR) (w/o enc. ) Central ~ File -(w/o enc.)

4 DTE :

AE00 : AE00:DD C/CRGR:A

]JHeltemesTT h thf NAME :J ran:cg o dan k

1//I/88 1/11/88 1pD/88 i

1