Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18153B074 +
- ML18152A343 +
- ML20086A521 +
- ML20076F071 +
- ML20073L180 +
- ML20073L173 +
- ML20073F519 +
- ML20073E304 +
- ML20073E290 +
- ML20073E251 +
- ML20073D629 +
- ML20073D371 +
- ML20073D325 +
- ML20073C956 +
- ML20073C951 +
- ML20073C781 +
- ML20073C791 +
- ML20073C440 +
- ML20073C430 +
- ML20073C318 +
- ML20073C313 +
- ML20073B890 +
- ML20073B643 +
- ML20073B629 +
- ML20073B458 +
- ML20073B452 +
- ML20073B446 +
- ML20073B442 +
- ML20073B284 +
- ML20073B033 +
- ML20137K000 +
- ML20137H528 +
- ML20129D778 +
- ML20149G761 +
- ML20149G034 +
- IA-97-401, Investigation Rept on 940916.Noncompliacce Noted.Major Areas Investigated:Casual Factors Contributing to Emergency Feedwater Valve Leakage Event Described in Event Rept 94-016 +
- ML20203J331 +
- ML20266E752 +
- PNO-IV-94-048A, update of Investigation Taken by Texas & California Re Shipment of 5 Shipping Containers,Containing Radiography Source Changers,From Basin Industrial X-Ray, Corpus Christi,Tx,To Industrial Nuclear Co,San Leandro,Ca +
- BSEP-94-0377, Forwards Rev 19 to Industrial Security Plan.Encl Withheld (Ref 10CFR73.21 & 10CFR2.790(d)(1)) +
- 3F0994-06, Forwards Rev 1 to FPC Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment, to Fulfill Commitment in Attachment 1 to FPC Addressing USI A-46,as Required by GL 87-02 +
- L-94-029, Forwards Public & Central Files Versions of Revised Epips. Central Files Version of Revised EPIPs Withheld +
- 2CAN099402, Forwards Comparison of RCS Leak Detection to Reg Guide 1.45 in Support of Permanent Reactor Pressure Vessel Seal Plate Installation +
- NRC-94-4267, Forwards Rev 2 to WCAP-13234, Test Spec for Long-Term Cooling Test +
- SVP-94-043, Informs That mid-cycle Insp of Braidwood Unit 1 SGs Will Be Initiated on or Before 950301.Insp Plans for Assessing Facility mid-cycle Insp Data Will Be Submitted at Least 60 Days Before Planned Shutdown +
- ML23153A026 +
- ML20137D744 +
- ML20138E422 +
- 05000446/LER-1994-013, :on 940817,four of Twenty Valves Tested Had Lift Settings Outside the Plus or Minus 1 Percent Setpoint Tolerance.Cause Not Determined.Setpoint Changes Request Submitted +
- 05000483/LER-1994-003, :on 940708,QA Engineer Surveillance of Radiation Monitors Indicated Utility Engineering Evaluation Conflicted W/Fsar Chapter 7.5.Caused by Utility Personnel Not Aware of Surveillance Procedures +