3F0994-06, Forwards Rev 1 to FPC Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment, to Fulfill Commitment in Attachment 1 to FPC Addressing USI A-46,as Required by GL 87-02

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to FPC Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment, to Fulfill Commitment in Attachment 1 to FPC Addressing USI A-46,as Required by GL 87-02
ML20073E547
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/16/1994
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073E550 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR 3F0994-06, 3F994-6, GL-87-02, GL-87-2, NUDOCS 9409290088
Download: ML20073E547 (1)


Text

--- -

i 9

~lorida Tower r Unit 3 DocLet No. 50-302 September 16, 1994 3F0994-06 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46, Generic Letter 87-02

Reference:

FPC to NRC letter, 3F0894-02, dated August 15, 1994

Dear Sir:

In Attachment 1 to the reference letter, Florida Power Corpo. ation (FPC) committed to submit a revision to the Crystal River 3 Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment. The attachment to this letter fulfills that commitment. The revision incorporates guidance to the seismic capability engineers regarding the examination of relays as previously committed by FPC.

Sincerely, P. M. Beard, Jr.

Senior Vice President Nuclear Operatio, s Attachment PMB:AEF xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager

,I aso m g6  ?

L CRYSTAL RIVER ENERGY COMPLEX + 15760 W. Power Line Street

  • Crystal River + Florida 34428-6708 + (904) 795-6486
  • ""e hogmss Cbmpany l 9409290089 940916 i

PDR ADDCK 05000302 l p _ PDR _

_ - _ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ - _ .