Entergy Operations,inc.
===~ ENT RGY no am e i
Mona. LA 7006G Tei 504 739 6774 R. F. Burski Datox.
i naar SMy meerwc3 W3F1-94-0164 A4.05 j
PR A
September 16, 1994
[
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Supplemental Information Regarding Emergency Technical Specification Change Request NPF-M-158 l
1 Gentlemen:
The purpose of this letter is to provide supplemental information concerning the Waterford 3 Emergency Technical Specification Change Request NPF-38-158 dated September 9, 1994.
The. proposed change adds a provision (in the form of a note) applicable to l
the integrated Emergency Diesel Generator (EDG) surveillance tests of
-l Technical Specification (TS) 4' 8.1.1.2.d.
The added provision, in part, would allow alternative operability testing in lieu of the specified integrated tests for the major AB ESF loads. The last sentence of the proposed change states, "The testing will include any series of sequential, overlapping, or total steps so that the entire connection and loading sequences is verified." The intent of this statement was to define the alternative type of testing in contrast to the specified integrated tests.
However, after discussions with the NRC staff, it was observed that.the literal application of this statement under all circumstances may result in subjecting the plant to undue risk. Waterford 3 intends to test the applicable AB components in a manner that shows the capability of the components to perform their function and avoid the potential for undesired operation.
Based on the above, Waterford 3 proposes that the last sentence of the proposed change be deleted.
c (_rrs p <; n
<,vvvLO 9409230014 940916' M
PDR 'ADOCK 05000382 i
. P.
\\
i
y.. '-
Supplemental Information Regarding Emergency Technical Specification Change Request NPF-38-158 W3F1-94-0164 Page 2 September 16, 1594 Whenever an emergency situation exists, a licensee requesting an amendment must explain why this emergency situation occurred and why it could not avoid this situ 6 tion. As indicated in our initial submittal, Waterford 3 discovered a condition that resulted in a situation where failure to act in a timely way would result in a plant shutdown.
Specifically, the discovery of non-compliance with TS surveillance requirements resulted in the failure to meet the Operability requirements of LC0 3.8.1.
Because this condition was recently discovered, the resulting situation could not be avoided.
Waterford 3 proposed NPF-38-158 as the basis for interim plant operation, and requested an NRC expedited review in accordance with the provisions of 10CFR50.91(a)(5).
Should you have further questions concerning this information, please contact D.W. Vinci at (504) 739-6370.
Very truly yours,
,.0,),'-
JAS R.F. Burski Director Nuclear Safety RFB/PLC/ssf cc: