Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML070790372 +
- ML17264A141 +
- 05000272/LER-1995-017, :on 950718,CR Emergency Air Conditioning Sys Failed to Meet GDC 19 Criteria.Performed Calculactions to Identify Alternative Operating Mode for Eacs to Ensure That Requirements of GDC 19 Satisfied +
- ML18101A887 +
- ML18101A881 +
- ML20087K246 +
- ML20087J357 +
- 05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable +
- ML20087J289 +
- ML20087H821 +
- ML20087H479 +
- ML20087H364 +
- ML20087H357 +
- ML20087G950 +
- ML20087G642 +
- ML20087G494 +
- ML20087G102 +
- ML20087G062 +
- ML20087G001 +
- ML20087F933 +
- ML20087F855 +
- ML20087F646 +
- ML20087F492 +
- ML20087F488 +
- ML20087F476 +
- NRC-95-0068, Provides Rev to Response to NOV 94-11 Re Violations Noted in Rept 50-341/94-11.Corrective Actions:Corrected Locking Discrepancy on E11-F018D +
- ML20087F199 +
- ML20087F195 +
- ML20087F183 +
- ML20087E873 +
- ML20087E806 +
- ML20087E252 +
- ML20097J742 +
- ML20092E620 +
- ML20092C111 +
- ML20134G539 +
- ML20134H729 +
- IA-96-390, Contract NRC-03-95-026 Awarded to Scientech +
- ML20237A579 +
- ML20266A153 +
- ML20210N348 +
- 3F0895-16, Ro:On 950713,1 H non-emergency Rept Made Re Condition Suspected to Be Outside Design Basis of Plant.Based on Conclusions of Design Basis Evaluation,Rescinds 1 H non-emergency Rept (NRC Event 29062) +
- NG-95-2546, Notifies That Actions Described in First Paragraph of Item I of GL 89-10 Completed +
- 3F0895-15, Special Rept 95-01:on 950630,ODCM Required Waste Gas Analyzer (WGDA-1) Declared Inoperable & Unavailable for Greater than Seven Days Due to Deficiency in Microprocessor. Microprocessor Replaced & WGDA-1 Returned to Operation +
- 0CAN089505, Submits 90 Day Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity +
- RC-95-0215, Submits Rev to TS Change 95-02 Re PORVs & Block Valves +
- NRC-95-0067, Provides Response to NRC Re Violations Noted in Insp Rept 50-341/95-08.Corrective actions:FIP-ASI-01, Internal Audits & Surveillance, Was Reviewed +
- ML20349H812 +
- 05000313/LER-1995-009, :on 950715,automatic Reactor Trip Initiated by RPS on High RCS Pressure Resulting in Automatic Closure of Main Turbine Governor & Intercept Valves Due to Failure of Main Generator Output Circuit Breaker +
- PY-CEI-NRR-1974, Forwards Oh EPA Approval for Essential Maint Discharge Change at PNPP +