Text

i-South Ctrolins Electric & Gas Company.

.S.A.Byrne,

.g Virgil C. Summtr Nucleir Stztion General Mrnag:r P. O. Box 88

  • Nuclear Pirnt operations E

~C Jenkinsville. SC 29065 (803) 345-5209 Aamusicompany August 11,1995 RC-95-0215 Document Control Desk U. S. Nuclear Regulatory Commission.

Washington, DC 20555 Attention: Mr. Stephen Dembek Gentlemen:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)

DOCKET NO. 50/395 OPERATING LICENSE No.NPF-12 REVISION TO TECIINICAL SPECIFICATION CHANGE -TSP 950002 POWER OPERATED RELIEF VALVES (PORVs)andBLOCK VALVES Refer To: G. J. Taylor to S. Dembek letter dated June 30,1995, RC-95-0167 South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, is submitting a revision of a page that was enclosed in the referenced letter. The revised page will supersede the greviousl submitted page and is necessary to clarify the intent of the original su)mittal. y Page 3/4.4;10a, section 3.4.4.d.1.a, provides action statement requirements if all three Power Operated Relief Velves (PORVs) are inoperable or unable to be i

manuall,y cycled at the same time. The intent of this specification is that the allowed i

outage time for three PORVs to be out of service is one hour. The statement currently reads that the allowed outage time for all three PORVs to be out of service can be up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The substitution of the word "and" for the word "or" will correct this i

statement, This revision has no impact on the safety evaluation or the No Significant Hazard-Evaluation Determination previously performed for the Technical Specification change ret uest. This typographical error unknowingly changed the wording of the

- submittal')ut not its intent.

This revision has been reviewed and approved by the Plant Safety Review Committee.

[

I declare that the statements and matters set forth herein are true and correct to the best of my knowledge, information, and belief.

a,

9 sos 16oo47 9sosii i \\

PDR ADDCK 05000395 P

PDR L

i l

Docum:nt Control Desk TSP 950002 RC-95-0215 Page 2 of 2 Should,you have any questions, please call Mr. Philip Rose at (803) 345-4052 at your convenience.

t Very truly yours, s6do pa S. A.Byrne PAR /SAB/nkk Enclosure c:

J. L. Skolds (w/o Attachment)

J. B. Knotts Jr.

O. W. Dixon M. K. Batavia R.R.Mahan (w/o Attachment)

J. I. Byrd R. J. White CentralFile System S. D. Ebneter RTS(TSP 950002)

NRC ResidentInspector File (813.20) i STATE OF SOUTH CAROLINA TO WIT :

COUNTY OF FAIRFIELD I hereby certify that on the

//" da of AvwT 19ff a Notary Public of the State ofSouth darolina in and for A'before me, the subscriber,

< elua0

(~,. 6.

personally appeared Stephen A. Byrne, being duly sworn, and states that hetas signature authority as designated by theVice President, Nuclear Operations of the South Carolina Electric & Gas Company, a corporation of the State of South Carolina, that he provides the foregoing response for the purposes therein set forth, that the statements made are true and correct to the best of his knowledge, information, and belief, and that he was authorized to provide the response on behalf of said Corporation.

WITNESS my Hand and Notarial Seal

/fAf-f Notary ?ublic

~:

My Commission Expires Ju4 n zur Date NUCLEAR EXCELLENCE - A SUMMER TRADITION!

-