ML20087E806

From kanterella
Jump to navigation Jump to search
Forwards non-proprietary WCAP-13787,rev 2 & Proprietary WCAP-13632, Elimination of Pressure Sensor Response Time Testing Requirements. WCAP-13632 Withheld Per 10CFR2.790
ML20087E806
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/11/1995
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19330G163 List:
References
NUDOCS 9508140372
Download: ML20087E806 (3)


Text

ya Nucte+,r Oper; ting Company 1 Post Office Box 1295 d

Birmingh:m. Alabama 35201 j

' Telephone (205) 868 5131 -

osv. uorey- Southern Nudear Operating Company l H

' $,f'r*Ne*c"t August 11, 1995' -

. the southem electnc system l L

50-364 U. S. Nuclear Regulatory Commission A*lTN: Document Control Desk Washington, DC 20555 l

E Joseph M. Farley Nuclear Plant Techrucal S-i&=*ia== Change Request Elimination of Periodic Pressure Sensor Resoonse Time Testina Reauirements Ladies and Gentlemen:

By letter dated August 17,1994, Southern Nuclear Operating Company (SNC) proposed changes .

to the Farley Unit I and Unit 2 Technical Specifications to eliminate periodic pressure sensor response time testing requirements. SNC letter dated June 15,1995 provided supplemental information as requested by NRC letter dated April 17,1995. During a conference call on June 27,1995, the Staff requested that SNC clarify whether Foxboro NEl1GM or El1GM and b.

f

. NE13DH or E13DH transmitters were installed at Fmley and if a similarity analysis was required

' for the E13DH transmitters. During a subsequent conference call on July 17,1995, SNC confirmed that the Foxboro NEllGM transmitters were installed in Farley Unit I for the pressurizer pressure protection system function and that Foxboro E13DH transmitters were installed in Farley Unit I and Unit 2 for the reactor coolant system loop flow protection sptem function. In addition, SNC i-Wat~I hat Wwiapmse would revise WCAP-13632, Revision 1, t

" Elimination of Pressure Sensor Response Time Testmg Requirements," to include a Foxboro E13DH similarity analysis, priority information clarifx:ations, and the text enhancements discussed in our supplemental response. This letter provides the revised WCAP.

WCAP-13632, Revision 2 (Westinghouse propnetary class 2) and WCAP-13787, Revision 2 (Westinghouse proprietary class 3) are -*M__. along with Westinghouse authonzation letter CAW-95-866 and accompanying afixiavit, proprietary information actice, and coppight notice.  ;

' Since WCAP-13632, Revision 2 contains information propnetsy to Westinghouse Electric ,

Corporation, it is supported by an affidavit signed by Westmghouse, the owner of the information. i

'ne afrulavit sets forth the basis on which the information may be withheld from public disclosure l by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations. Corryh with respect to the copyright or proprietary aspects of the items listed above or the supportmg Westinghouse afrulavit should reference CAW-95-866 and should be addressed to Nicholas J. liparulo, Manager of Nuclear  !

Safety Regulatory & Licensing Activities, Westmghouse Electric Corporation, P. O. Box 355, l Pittsburgh, Pennsylvania 152304)355.

l O

n:us g Mek i 4 .;

9508140372 950811 gDR ADOCK 05000348 "

l i

PDR j w . __. . -_

< i U. S. Nuclear Regulatory Commission  !

Page 2 i

SNC plans to implement the proposed Technical Specifications response time testing surveillance ,

changes within sixty days of receipt of the new amendments for Farley Unit I and Unit 2. Simuld l you require any additional information, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY b 7b[

Dave Morey i

MGE: mar RTITSSS. DOC SWORN TO AND SUBSCRIBED BEFORE ME 4

  • Attaciunent THIS // ~ DAY OF .1995 cc: Mr. S. D. Ebneter M b l Mr. B. L. Siegel ~No

'taryPublic [/

Mr. T. M. Ross  ;

Dr. D. E. Williamson MyCommissionExpiresbwu29 /997 i

l i

3 i

.. j KITACHMENT l Joseph M. Farley Nuclear Plant

)

Techmcal Specifications Change Roquest Elimination of Periodic Pressure Sensor Response Tine Testing Requirements i

r Westinghouse letter CAW-95-866, dated August 2,1995, " Application For Withholding Proprietary hiformation From Public Disclosure," with the following enclosures: Afridavit, Proprietary Information Notice, and Copyright Notice. l t

~ WCAP-13632, Revision 2, Proprietary Class 2, "Elimmation of Pressure Sensor Response Time Testing Requirements," WOG Program MUHP-3040, Revision 1. -

WCAP-13787, Revision 2, Proprietary Class 3, " Elimination of Pressure Sensor Response Time Testing Requirements," WOG Program MUllP-3040, Revision 1. i P

4

-l i

4 i

l l

l l

i l

!