Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-97-235, Monthly Operating Repts for August 1997 for St Lucie + (18:18:42, 8 January 2025)
- ML17229A470 + (18:18:45, 8 January 2025)
- ML17229A467 + (18:18:46, 8 January 2025)
- ML17229A468 + (18:18:46, 8 January 2025)
- ML17229A466 + (18:18:48, 8 January 2025)
- TAC:M94250 + (18:18:48, 8 January 2025)
- L-97-223, Provides Suppl Response to Rev 1,Suppl 1 to GL 92-01, Rv Structural Integrity. Results of FPL Review of ABB CEOG Activities to Establish Comprehensive RPV Info Database Provided + (18:18:50, 8 January 2025)
- ML17229A464 + (18:18:50, 8 January 2025)
- ML17229A462 + (18:18:52, 8 January 2025)
- ML17229A459 + (18:18:55, 8 January 2025)
- ML17229A458 + (18:18:56, 8 January 2025)
- ML17229A456 + (18:18:57, 8 January 2025)
- ML17229A453 + (18:19:00, 8 January 2025)
- L-97-217, Forwards St Lucie Plant Status Meeting for Units 1 & 2, as Discussed at 970814 Meeting + (18:19:01, 8 January 2025)
- ML17229A452 + (18:19:01, 8 January 2025)
- ML17229A448 + (18:19:06, 8 January 2025)
- L-97-214, Confirms That FPL Has Shipped Exam Outline Requested by NRC .Ref Matl,Operating Test & Administrative Portions of Written Exam Will Be Submitted by 970902 + (18:19:07, 8 January 2025)
- ML17229A447 + (18:19:07, 8 January 2025)
- L-97-212, Monthly Operating Repts for July 1997 for St Lucie + (18:19:09, 8 January 2025)
- L-97-206, Forwards Response to Violations Noted in Insp Repts 50-335/97-05 & 50-389/97-05.Corrective Actions:Unit 2 ECCS Sump Insp Was Completed on 970522 & General Cleanliness Verifications of Containment Bldg Required Was Documented + (18:19:11, 8 January 2025)
- L-97-205, Special Rept:On 970731,determined That Use of Conservative Min Value for Pin/Box Factor in Analysis of Record,Compared to Actual Value of Cycle 10 Min Pin/Box Factor,Introduced Conservation of .0073 in Energy Redistribution Factors + (18:19:21, 8 January 2025)
- PNO-II-97-045, on 970815,St Lucie Contractor Security Supervisor Arrested & Charged by Local Law Enforcement Officials for Event Unrelated to Plant Operation.Resident Inspectors Notified & Will Continue to follow-up on Event + (18:19:21, 8 January 2025)
- ML17229A441 + (18:19:23, 8 January 2025)
- L-97-198, Forwards SG Tube ISI Special Rept Required by Sections 4.4.5.5.b & 6.9.2 of Plant Unit 2 TS for Spring 1997 Refueling Outage + (18:19:24, 8 January 2025)
- ML17229A438 + (18:19:26, 8 January 2025)
- L-97-197, Forwards fitness-for-duty Program Performance Data for Six Month Period Ending 970630 + (18:19:27, 8 January 2025)
- ML17229A434 + (18:19:29, 8 January 2025)
- ML17229A435 + (18:19:29, 8 January 2025)
- L-97-191, Application for Amend to License NPF-16,extending semi- Annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 + (18:19:30, 8 January 2025)
- 05000389/LER-1997-006-01, :on 970630,discovered Inadequate Testing of Engineered Safety Features Subgroup Relays.Caused by Inadequacy in Implementing TS Requirements in Surveillance Procedures.Revised Surveillance Procedures + (18:19:32, 8 January 2025)
- ML17229A430 + (18:19:34, 8 January 2025)
- IR 05000335/1997300 + (18:19:35, 8 January 2025)
- L-97-194, Provides 120-day Response to NRC GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Util Plans to Utilize Info from Industry Effort & Submit Written Response to Items 1 & 2 by 970730 + (18:19:36, 8 January 2025)
- IR 05000335/1997004 + (18:19:38, 8 January 2025)
- ML17229A425 + (18:19:39, 8 January 2025)
- 05000389/LER-1997-005-02, :on 970625,discovered That Hot Shutdown Control Panel Shutdown Cooling Flow indicator,FI-3306 Inoperable. Caused by Weakness in Work Order & Procedure Used to Repair FI-3306.Section Meeting W/I&C Planners Held + (18:19:41, 8 January 2025)
- L-97-158, Application for Amend to License DPR-67,incorporating Recent Evaluation of Postulated Inadvertent Opening of MSSV Into Current Licensing Basis + (18:19:43, 8 January 2025)
- ML17229A422 + (18:19:43, 8 January 2025)
- ML17229A420 + (18:19:45, 8 January 2025)
- L-97-187, Forwards St Lucie Plant Station Status Meeting + (18:19:46, 8 January 2025)
- ML17229A416 + (18:19:49, 8 January 2025)
- ML17229A415 + (18:19:50, 8 January 2025)
- ML17229A413 + (18:19:51, 8 January 2025)
- IR 05000335/1997099 + (18:19:53, 8 January 2025)
- IR 05000335/1995009 + (18:19:55, 8 January 2025)
- ML17229A410 + (18:19:57, 8 January 2025)
- ML17229A408 + (18:19:58, 8 January 2025)
- ML17229A407 + (18:20:00, 8 January 2025)
- ML17229A406 + (18:20:01, 8 January 2025)
- ML17229A404 + (18:20:03, 8 January 2025)
- ML17229A403 + (18:20:04, 8 January 2025)