Forwards SE Re Pressurized Thermal Shock Evaluation for Plant,Units 1 & 2
ML17229A468
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/03/1997
From: Wichman K
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
Shared Package
ML17229A469 List:
References
TAC-M95484, TAC-M95485, NUDOCS 9709150216
Download: ML17229A468 (3)


Text

gP,S REGS

~4

~o Cy

~ g0 e

O~

Vg

~O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTOk, D.C. 2055&4001 September 3,

1997 HEHORANDUH TO:

Frederick J.

Hebdon, Project Director Project Directorate II-3 Division of Reactor Projects, I/II FROH:

Keith R. Wichman. Chief Section A

@g ~

Haterials and Chemical Engineerin Branch Division of Engineering

SUBJECT:

ST.

LUCIE UNITS 1 AND 2 - PRESSURIZED THERMAL SHOCK EVALUATION Plant Name:

Licensee:

TAC Nos.:

Review Status:

St. Lucie Units 1 and 2

Florida Power and Light Company H95484/H95485 Complete By letter dated Hay 14.

1996. the licensee submitted a pressurized thermal shock (PTS) evaluation for St. Lucie Units 1 and 2.

In addition. proprietary and non-proprietary copies of the Combustion Engineering Owner's Group (CEOG) report CEN-405-P, Revision 2, "Application of Reactor Vessel Surveillance Data tor Embrittlement Hanagement" were enclosed for NRC review and approval.

By teleconference conducted on August 27, 1996. the NRC staff'uggested that the licensee submit new proprietary and non-proprietary reports since data extracted from the power reactor embrittlement database (PR-EDB) are non-proprietary.

New proprietary and non-proprietary versions of CEN-405-P (designated Revision 3) were submitted by letter dated September 23.

1996.

Additional information was provided by letters dated January 14 and Hay 16, 1997.

The January 14.

1997 letter changed the requested approval date from April 1, 1997 to April 1, 1998 due to scheduling outage changes.

The Haterials and Chemical Engineering Branch of the Division of Engineering has completed its review of the licensee's submittal.

In our safety l

CONTACT:

Andrea D. Lee, NRR (301) 415-2735 9709i50216 970903 PDR ADOCK 05000335 P

PDR JQQ I+RE g(Igpr pip~i IIIIIII!IIIIIIIIIIIIIIIIIIIIIIIIIJIIIIII

2 II evaluation, which is attached, we have concluded that the St. Lucie Units 1 and 2 reactor vessels are projected to be below the PTS screening criteria at the expiration of their licenses.

Since this conclusion is'ependent upon the availablel chemistry data and surveillance data. it is subject to change'hen, new data become available.

II l

The attached SER completes our review efforts for TAC NOS. H95484/H95485.

l'I II Attachments:

As stated cc:

L. Wiens E. Sullivan (Acting Branch Chief, EMCB)

DISTRIBUTION PUBLIC

--":;Fil.e;Center.

EMCB RF/PF GLainas JStrosnider MHayfield EHackett SSheng JMedoff HHitchell KKarwoski HKhanna DOCUMENT NAME: G:KLEENSTLUCIE.PTS

  • See Previous Concurrence To receive a copy of this document.

indicate in the box C-Copy w/o attachment/enclosure E-Copy with attachment/enclosure N - No copy OFFICE DATE DE:EHCB ALee 8/

/97:Jb DE:EHCB* F BElliot 8/27/97 DE:EBCB*

KWichman 8/27/97

\\'